Skip to main content

How to Build Concrete Block Steps

Build masonry block steps with concrete fill, proper footing, and rendered finish.

Skill level
Intermediate
Time
1-2 days
Trade
Building & Construction
Updated
28 November 2026

Tools you will need

  • Spirit level
  • Trowel
  • Brick bolster
  • Concrete mixer
  • Screed board
  • String line

What is involved in building concrete block steps?

Build masonry block steps with concrete fill, proper footing, and rendered finish.

This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.

Skill Level: Intermediate | Estimated Time: 1-2 days

What preparations are essential before starting concrete block step construction?

Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.

Read through the entire guide first so you understand the full scope of work
Gather all tools and materials listed below before you begin
Check weather conditions if working outdoors -- avoid starting if rain is forecast within your estimated time window
If working near existing structures, check for electrical cables, plumbing, and gas lines before cutting or drilling
Ensure you have adequate lighting in your work area
Wear appropriate PPE: safety glasses, hearing protection, gloves, and steel-cap boots where required

What tools are required for building concrete block steps?

Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.

Spirit level -- Essential for this project. Check your existing kit before purchasing.
Trowel -- Essential for this project. Check your existing kit before purchasing.
Brick bolster -- Essential for this project. Check your existing kit before purchasing.
Concrete mixer -- Essential for this project. Check your existing kit before purchasing.
Screed board -- Essential for this project. Check your existing kit before purchasing.
String line -- Essential for this project. Check your existing kit before purchasing.

Step-by-Step Guide

Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.

Step 1: Calculate step dimensions: rise 150-175mm, going 280-300mm minimum

This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.

Step 2: Excavate and pour a concrete strip footing 300mm deep

With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.

Step 3: Allow footing to cure 24 hours

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 4: Lay first course of blocks on mortar bed, fill cores with concrete

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 5: Build up courses for each step, filling as you go

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 6: Insert reinforcement bars vertically through cores

You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.

Step 7: Check all dimensions comply with BCA requirements

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 8: Allow block work to cure for 48 hours

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 9: Apply render coat for finished appearance

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 10: Install non-slip nosing strips on each tread edge

This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.

Safety Notes

Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.

Steps must comply with BCA dimensional requirements -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
All rises must be equal height (variance max 5mm) -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Non-slip surface treatment is essential for outdoor steps -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Handrails required where total rise exceeds 1000mm -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.

Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.

Pro Tips from the Trade

These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.

Tip 1: Pour all cores solid with concrete for maximum strength. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 2: Overhang treads 25mm past the riser for shadow line. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 3: Apply non-slip additive to the render. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.

Common Mistakes to Avoid

Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.

Mistake 1: Inconsistent riser heights causing trip hazards. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 2: Not filling block cores with concrete. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 3: Forgetting non-slip treatment on outdoor steps. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.

Materials List

Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.

Concrete blocks 390x190x190mm -- Confirm grade and specifications match the requirements described in the steps above.
Mortar for laying -- Confirm grade and specifications match the requirements described in the steps above.
Concrete for core fill (25MPa) -- Confirm grade and specifications match the requirements described in the steps above.
Reinforcement bars 12mm -- Confirm grade and specifications match the requirements described in the steps above.
Render mix -- Confirm grade and specifications match the requirements described in the steps above.
Non-slip nosing strips -- Confirm grade and specifications match the requirements described in the steps above.

When to Call a Professional

While this guide covers a intermediate-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:

If you encounter structural elements that you are not confident assessing
If the project requires council permits or engineering certification
If you discover hidden hazards such as asbestos, faulty wiring, or damaged plumbing
If the scope grows beyond what you originally planned

Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.

Frequently asked questions

What tools do I need for build concrete block steps?
You will need: Spirit level, Trowel, Brick bolster, Concrete mixer, Screed board, String line.
How long does it take to build concrete block steps?
Expect approximately 1-2 days for this project.
What safety precautions should I take?
Steps must comply with BCA dimensional requirements. All rises must be equal height (variance max 5mm). Non-slip surface treatment is essential for outdoor steps. Handrails required where total rise exceeds 1000mm.
What are the best tips for success?
Pour all cores solid with concrete for maximum strength. Overhang treads 25mm past the riser for shadow line. Apply non-slip additive to the render.
What mistakes should I avoid?
Inconsistent riser heights causing trip hazards. Not filling block cores with concrete. Forgetting non-slip treatment on outdoor steps.
What is the Australian standard for step dimensions?
The Australian Building Code of Australia (BCA) specifies step dimensions. According to NCC 2022, for residential buildings, risers must be between 115mm and 190mm, and goings between 240mm and 355mm. The maximum variation in riser height within a single flight is 5mm, ensuring consistent and safe stepping.
Are handrails always required for concrete steps in Australia?
Handrails are required for steps in Australia when the total rise exceeds 1000mm, or if there are more than four risers in a flight. This is mandated by the Building Code of Australia (BCA), specifically NCC 2022, to enhance safety and prevent falls, especially in public or high-traffic areas.
What is the instant asset write-off threshold for tools in Australia?
For the 2023-24 financial year, the instant asset write-off threshold for eligible businesses is $20,000 (ex GST) per asset. According to the Australian Taxation Office (ATO), this allows businesses to immediately deduct the full cost of eligible assets, such as tools, up to this amount, simplifying tax compliance.
What type of concrete mix is best for outdoor steps?
For outdoor concrete steps in Australia, a minimum 25 MPa concrete mix is recommended to ensure durability and resistance to weathering. According to AS 3600:2018 (Concrete Structures), using a mix with a higher cement content and appropriate aggregates will improve strength and reduce the risk of cracking in varying Australian climates.

Written by Bricko, the Building & Construction specialist at VIC.Tools.