How to Build a Brick Fence
Build a durable brick fence in Australia with our expert guide. Learn about footings, set-out, brickwork, and Australian standards for DIY and trade projects.
- Skill level
- Intermediate
- Time
- 4–8 days for a typical 8–12 m fence, plus 7 days minimum curing time for footing concrete
- Trade
- Building & Construction
- Updated
- 28 November 2026
Tools you will need
- Marshalltown PermaShape - Brick Trowel (11 inch)
- Ox Tools Pro - Pointing Trowel (150mm)
- Trojan - Brick Bolster (75mm)
- Trojan - Club Hammer (1.8kg)
- Stanley FatMax - Tape Measure (8m)
- Empire Level - Builder’s Square (600x400mm)
- Cyclone - Long Handle Shovel (Round Mouth)
- Makita - Concrete Mixer (120L)
- Kincrome - Rebar Cutter/Bender (manual, up to 16mm)
- Makita DHR242Z - Rotary Hammer Drill (for rebar dowels)
- Husqvarna K 770 - Power Cutter (for precise brick cuts)
- Ramset ChemSet 101 - Chemical Anchor (for rebar fixing)
What is involved in building a brick fence in Australia?
A brick fence is a durable, low-maintenance way to improve privacy, security and street appeal, but it needs proper footings, accurate set-out and neat brickwork to last. For most Australian DIYers, the simplest option is a straight brick fence in stretcher bond with brick piers at regular centres, built on a reinforced concrete strip footing.
Before starting, check council rules, boundary requirements and whether engineering certification is needed, especially for fences over typical local height limits, fences exposed to high wind loads, or any fence incorporating gates, piers, retaining loads or feature panels.
What skill level is required to build a brick fence?
Intermediate — Estimated time: 4–8 days for a typical 8–12 m fence, plus 7 days minimum curing time for footing concrete
What tools are essential for building a brick fence?
Materials Required
Safety Requirements
Step-by-Step Guide
Step 1: Check approvals, boundaries and design
Start by confirming the exact fence location on your property. If it is on the boundary line, speak with your neighbour and check local council rules for height, setbacks, front fence restrictions and visibility requirements near driveways or street corners.
For most DIY projects, a straight face-brick fence with brick piers every 2400–3000 mm is the most practical. Stretcher bond is the easiest bond for beginners because it is simple to keep aligned and visually tidy.
If the fence is over about 1200–1800 mm high, includes gate openings, returns, heavy capping, infill panels, or sits in a wind-exposed area, get an engineer to confirm pier sizes, reinforcement and footing details.
Step 2: Plan the fence dimensions and order materials
Measure the total length and decide the finished height. A common residential brick fence is 1200 mm to 1800 mm high, with piers at equal centres for strength and appearance.
Choose your brick size and joint thickness early. Standard mortar joints are usually 10 mm. Lay out a sample gauge using brick height plus mortar joint so your courses finish neatly at the top without thin cut bricks.
Work out:
If buying a mixer, saw or scaffold only for this project, it is usually cheaper to hire them for a weekend or a week rather than purchase outright.
Step 3: Set out the fence line
Drive in timber pegs beyond each end of the proposed fence and set up profiles/batter boards so the string line can stay in place while you dig. Run a taut string line to mark the front face of the fence.
Use a tape measure and square to set out pier positions accurately. Mark all pier centres and gate openings before excavation. Check dimensions twice, especially if the fence needs to align with an existing driveway, path or pillar.
For a beginner-friendly layout:
Step 4: Excavate the strip footing trench
Excavate a continuous trench along the full fence line, including widened sections under piers if required by the design. Footing size depends on soil class, fence height and wind load, so follow engineering details where provided.
As a broad guide only for a non-retaining residential brick fence, strip footings are commonly in the range of:
Pier footings may be deeper or wider than the wall section. On reactive clay, filled ground, sloping sites or near trees, do not guess footing depth—get engineering advice.
Trim the trench base flat and firm. Remove loose material, roots and soft spots. If the trench fills with water, pump it out and stabilise the base before placing concrete.
Step 5: Install reinforcement and pour the footing
Place trench mesh or reinforcement bars on bar chairs so the steel sits with proper concrete cover, not directly on the soil. Tie all reinforcement securely and install any starter bars required for reinforced piers or gate posts.
Pour the concrete footing to the specified level. For site mixing, general purpose concrete can be mixed at 1:2:3 (cement:sand:aggregate), but for larger or more critical footings, ordering premixed 20 MPa concrete is usually better for consistency.
Screed the top level and finish it reasonably flat. Recheck the line before the concrete sets. If you are laying the first course directly on the footing, the top must be straight, level and square.
Allow the footing to cure. As a minimum, leave it for 48–72 hours before light bricklaying in good conditions, and longer in cold weather. Full strength takes longer, so avoid heavy loading too early.
Step 6: Mark the first course and install DPC where required
Once the footing has hardened, snap or mark the wall line and pier outlines on the footing. Dry-lay a few bricks to confirm pier widths, course spacing and cuts at the ends.
Install damp-proof course at the base of the wall where required by the design to reduce rising moisture and efflorescence. In face brick fences, the DPC is typically laid near the base course and lapped neatly so it is concealed or finished cleanly.
This is the point to confirm your gauge rod. A gauge rod is a timber strip marked with course heights so each course stays consistent.
Step 7: Mix mortar correctly
For bricklaying mortar, use a suitable brick mortar mix. A traditional site mix is 1 part cement : 1 part lime : 6 parts brick sand. Many DIYers prefer a proprietary bricklaying mortar mix because it gives more consistent workability and colour.
Mix only enough mortar that you can use within about 1–2 hours, depending on weather. The mortar should be workable and hold on the trowel without being sloppy.
Do not add too much water. Wet mortar makes bricks slide, weakens the mix and leads to messy joints and staining.
Step 8: Lay the first course carefully
The first course is the most important part of the whole job. Start at the corners or piers, not the middle. Spread a full mortar bed around 10 mm thick, butter the brick ends, and place each brick to line and level.
Tap each brick into place with the trowel handle, then check:
Take your time here. If the first course is out, every course above it will be harder to correct.
Step 9: Build the piers first, then infill the wall panels
For strength and easier stringing, build the piers up several courses ahead of the wall panels. Common pier sizes are based on brick modules, such as 230 mm x 230 mm or larger, depending on design.
Keep each pier:
Run the wall between piers in stretcher bond. Keep the string line tight on every course and do not use the previous course as your only guide.
If the design includes reinforcement or ties in piers, install them as specified. For long walls, include articulation/control joints at the spacing recommended by the engineer or brick manufacturer, often around 5–6 m centres depending on the system and exposure.
Step 10: Maintain bond, plumb and joint quality
As you work up the wall, constantly check:
Keep perp joints fully filled. Avoid “furrowing” mortar beds that leave voids. Solid, full joints improve strength and weather resistance.
Tool the joints when the mortar starts to firm up. A slightly concave or ironed joint is commonly used because it compacts the mortar and improves rain resistance. Brush the wall lightly after jointing to remove crumbs, but do not smear fresh mortar across the brick faces.
Step 11: Form movement joints, caps and gate openings
Install movement joints where specified in the design. These are essential on longer fence runs to control cracking from thermal movement and shrinkage. Use compressible filler and flexible sealant suited to masonry.
If the fence includes a gate opening, the gate posts or reinforced piers must be designed to carry hinge and latch loads. Do not assume a standard unreinforced pier will handle a heavy gate.
Finish the top of the fence with capping bricks, a soldier course, rowlock course or precast capping. The top should shed water, not hold it. A slight fall and drip detail on cappings will improve durability.
Step 12: Clean, cure and protect the new brickwork
As you lay, clean mortar droppings promptly. Once the wall has firmed up, brush it down gently. Do not use acid wash on fresh brickwork unless the brick manufacturer specifically allows it and the mortar has cured adequately.
Protect new brickwork from:
Lightly cure the footing and protect the brickwork in hot, windy weather. Once fully cured, you may apply a breathable masonry sealer if desired, though many face bricks are designed to remain unsealed.
Step 13: Final checks and ongoing maintenance
Inspect the completed fence for:
Over time, keep garden beds and sprinklers from constantly wetting the base of the fence. Repoint isolated failed joints early and reseal movement joints when they deteriorate.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What Australian standards apply to building a brick fence?
- The primary Australian standard for masonry construction is AS 3700:2018 Masonry structures, which dictates requirements for design, materials, workmanship, and structural performance. For residential footings, AS 2870:2011 Residential slabs and footings also applies, ensuring stability and durability in various soil conditions across Australia.
- What is the recommended footing depth for a brick fence in Australia?
- Footing depth for a brick fence typically ranges from 300mm to 600mm, depending on soil conditions, fence height, and local council requirements. For fences exceeding 1.2 metres or those incorporating piers, engineering certification may mandate deeper, reinforced footings to ensure stability and adherence to AS 2870:2011 Residential slabs and footings.
- Do I need council approval for a brick fence in Australia?
- Yes, council approval is frequently necessary for brick fences in Australia, particularly if they exceed 1.2 metres in height or are situated on a boundary line. Regulations differ significantly between local government areas, so always consult your specific council's planning department before commencing any construction to ensure compliance.
- What type of mortar is best for brick fences in Australian conditions?
- For brick fences, a general-purpose mortar mix, specifically M3 or M4 as specified in AS 3700:2018, is recommended for optimal strength and durability. This mix typically comprises cement, hydrated lime, and sand in precise ratios, ensuring a workable consistency that prevents brick slippage and promotes strong, lasting joints.
- What are common mistakes to avoid when building a brick fence?
- Common mistakes include failing to obtain council approvals or verify boundary alignments, undersizing footings, and rushing the initial courses, which can compromise structural integrity. Additionally, using inconsistent or overly wet mortar often leads to sliding bricks, weak joints, and unsightly staining, impacting both aesthetics and longevity.
- How long does it take for concrete footings to cure before bricklaying can commence?
- Concrete footings for a brick fence require a minimum of 7 days to cure sufficiently before bricklaying can commence, ensuring adequate strength development. For optimal structural integrity, especially in cooler conditions or for heavily loaded fences, extending the curing period to 14-28 days is advisable.
Written by Bricko, the Building & Construction specialist at VIC.Tools.