How to Build a Retaining Wall with Besser Blocks

Learn how to build a Besser block retaining wall to Australian standards. Step-by-step guide covering footings, core-filling, drainage, and council limits.

Quick answer

To build a Besser block retaining wall, pour a reinforced 25 MPa concrete strip footing with vertical starter bars. Lay 200 series concrete blocks in structural mortar with staggered joints, core-fill with concrete grout around steel rebar, and install slotted ag-pipe with gravel backfill to relieve hydrostatic pressure.

Skill level
Intermediate
Time
2–4 days for a small garden retaining wall, plus curing time
Trade
Building & Construction
Updated
28 November 2026

Tools you will need

  • Stabila 196-2 LED - 1200mm Heavy-Duty Spirit Level
  • Makita GA9020 - 230mm Angle Grinder with Diamond Blade
  • Marshalltown 19/11D - London Pattern Brick Trowel
  • Husqvarna K770 - 350mm Power Cutter Demolition Saw
  • Ox Tools Pro - 1.8kg Club Hammer and Bolster Chisel Set
  • DeWalt DW088CG - Self-Levelling Green Cross Line Laser Level

🧱 How to Build a Retaining Wall with Besser Blocks

What is a Besser block retaining wall and when is engineering required?

A Besser block retaining wall is a practical and cost-effective way to hold back soil for garden beds, terraces, and level changes in Australian backyards. For low, non-structural walls, it can be a solid DIY project if you prepare the footing properly, manage drainage, and build to line and level.

For walls retaining significant loads, supporting driveways, or over certain heights, you’ll need engineering design and council approval. In Australia, masonry and concrete work should align with AS 3700 Masonry Structures and AS 3600 Concrete Structures, and local council requirements always apply.

What skill level is required to build a Besser block retaining wall?

Intermediate — Estimated time: 2–4 days for a small garden retaining wall, plus curing time

What essential tools are needed for building a Besser block retaining wall?

Shovel and trenching shovel
Pick or mattock for hard ground
Wheelbarrow
String line and line pins
Tape measure
Spirit level at least 1200 mm
Laser level or dumpy level for better accuracy
Brick bolster and club hammer
Masonry saw or angle grinder with diamond masonry blade
Brick trowel and pointing trowel
Rubber mallet
Plate compactor (hire recommended)
Concrete mixer (hire for larger jobs)
Buckets for water and mortar mixing
Screed board or straightedge
Reinforcing bar cutter/bender or angle grinder
Caulking gun if using construction adhesive for caps
Drainage shovel and rake

What materials are essential for constructing a Besser block retaining wall?

Besser blocks, typically 390 mm x 190 mm x 190 mm or size to suit project
Half blocks or allowance for cut blocks
Concrete for strip footing using 1:1.5:2.5 structural mix, or premixed concrete
Mortar for block laying, commonly pre-blended masonry mortar or site mix
Reinforcing steel bars to engineer’s detail or for low walls as required
Core-fill concrete or grout for reinforced block cores
Crushed rock or road base for base preparation
Drainage aggregate, typically 10 mm–20 mm
Agricultural drain pipe, usually 100 mm slotted
Geotextile fabric
Weep hole components if required
String line
Timber pegs and setout stakes
Block fill or clean backfill material
Capping blocks if desired
Construction adhesive suitable for masonry caps
Water for mixing and curing

Safety Requirements

Wear PPE: safety boots, gloves, hearing protection, dust mask or respirator, and safety glasses
Besser blocks are heavy; use correct manual handling and team lifting where needed
Take care when cutting masonry—silica dust is hazardous; use wet cutting where possible
Keep trenches stable and never work in unsafe excavations
Use scaffolding or edge protection where fall risks exist
Confirm underground services before digging using Before You Dig Australia
Structural retaining walls may require engineering certification and council approval
Where drainage affects adjoining properties, comply with local council stormwater rules
If waterproofing adjoins occupied structures, relevant works must comply with AS 3740

Step-by-Step Guide

Step 1: Plan the Wall and Check Approvals

Start by confirming the wall length, height, and what it will retain. For a simple garden wall, measure the total retained height from the lower finished ground level to the upper soil level.

As a general rule, once a retaining wall gets taller, supports surcharge loads like a driveway, fence, shed, or slope above, it should be designed by an engineer. Many councils also require approval depending on wall height, location, and drainage impact.

Mark out the wall with string lines and pegs. Check for services, tree roots, and any water flow through the site.

💡 Keep the design simple for DIY: straight walls are easier to build accurately than curved or stepped layouts.

Step 2: Excavate the Footing Trench

Dig a trench along the wall line wide enough for the footing and working room. For a small backyard wall, a common starting point is a trench around 300 mm–450 mm wide, but the actual footing size should suit the wall height, soil type, and engineering requirements.

Excavate deep enough to reach firm natural ground. Remove soft spots, topsoil, roots, and loose material. The base of the trench must be level and compact.

If the site slopes, step the footing rather than trying to follow the ground with a sloping base. Each step should be neat and level so the first course starts properly.

Step 3: Prepare and Pour the Concrete Footing

Place and compact a thin layer of crushed rock if needed to stabilise the trench base. Set up your levels carefully, because the footing controls the whole job.

Install reinforcement if required. For walls with reinforcing, vertical bars are often cast into the footing at the correct spacing to suit the Besser block cores.

Pour the concrete strip footing using 1:1.5:2.5 structural mix, or order premixed concrete for better consistency. Screed the top level and check it with your spirit level or laser.

Allow the footing to firm up before laying blocks. For best results, let concrete cure adequately before loading it.

💡 Hire a mixer or order premix if the footing volume is more than about 0.25 m³—it’s usually faster and more economical than hand-mixing.

Step 4: Set Out the First Course

Dry-set or mark the first course to confirm block spacing, joint widths, and any cuts. Standard Besser blocks are usually laid with mortar joints around 10 mm.

Run a string line to the face of the wall. The first course is the most important—if it is out of level or alignment, every course above will be harder.

Lay a full mortar bed and position the first block carefully. Tap it into place with a rubber mallet and check level both ways. Continue laying the first course, keeping the face straight to the string line.

For corners, start with corner units or plan your bond so joints are staggered. Avoid lining up vertical joints over each other unless the system is specifically designed for that.

Step 5: Install Reinforcement and Build the Wall

As you build up, place blocks in a running bond pattern so joints are staggered for strength. Check line, level, and plumb constantly.

If your design includes vertical reinforcement, align the block cores over the starter bars cast into the footing. Additional horizontal reinforcement may also be required depending on the design and wall type.

Lay each course with consistent mortar joints, usually 10 mm thick. Remove excess mortar from the face as you go to save cleaning later.

For reinforced walls, leave the required cores clear for core filling. Do not let dropped mortar block the cores where steel and grout need to go.

Step 6: Install Drainage Behind the Wall

Drainage is critical. Most retaining wall failures are caused by poor drainage rather than the blocks themselves.

Place 100 mm slotted ag pipe behind the base of the wall, falling to a suitable discharge point. Wrap the pipe in geotextile or use a socked pipe to reduce silt build-up if appropriate.

Backfill behind the wall with free-draining aggregate such as 10 mm–20 mm gravel. Keep a drainage zone behind the wall rather than packing clay or wet spoil directly against it.

Separate soil from drainage stone with geotextile fabric. This helps stop fines washing into the gravel and blocking the drain over time.

💡 Even a low garden wall benefits from proper ag drainage—don’t skip it to save a few dollars.

Step 7: Core Fill Reinforced Sections

Where required, fill reinforced block cores with concrete or grout once the wall has gained enough stability and as specified by the design.

Use a suitable core-fill mix that will flow properly around reinforcement without leaving voids. Rod or vibrate gently to consolidate the fill, but don’t overdo it and disturb the blockwork.

Clean off spills before they harden. Core filling is especially important where the wall relies on reinforced masonry performance under AS 3700 Masonry Structures.

Step 8: Backfill in Layers

Backfill gradually, not all at once. Place fill in layers of around 150 mm–200 mm and compact each layer lightly.

Take care not to push the wall out of plumb with heavy-handed compaction too close to the back of the blocks. Keep larger compactors back from the wall and use hand compaction near the masonry if needed.

Shape the finished surface so water drains away from the retained area and does not pond behind the wall.

Step 9: Fit Caps and Finish the Wall

If you’re using capping blocks, install them once the wall has cured sufficiently and is clean. Caps can be mortared on or fixed with a suitable exterior masonry adhesive, depending on the system.

Tool or tidy the joints for a neat finish. You can also render, bag, paint, or leave the Besser blocks exposed depending on the look you want.

If rendering, make sure the wall is cured and prepared correctly. Exterior finishes should suit the exposure conditions and any moisture risk.

Step 10: Final Checks and Ongoing Maintenance

Check that the wall is straight, plumb, and free of loose blocks or open joints. Confirm the drain outlet is clear and that water can escape properly.

After the first heavy rain, inspect for signs of water build-up, soil washout, or movement. Early maintenance is much easier than repairing a failed retaining wall later.

Keep garden irrigation from constantly soaking the retained soil behind the wall unless the drainage system is designed for it.

Common Mistakes to Avoid

1.Building on an undersized or unlevel footing, which causes cracking and movement.
2.Skipping drainage behind the wall and allowing hydrostatic pressure to build up.
3.Using poor backfill such as clay or uncompacted spoil directly behind the blocks.
4.Failing to stagger vertical joints or keep the wall plumb and aligned.
5.Attempting a tall or heavily loaded retaining wall without engineering and council checks.

Pro Tips

1.Use a laser level for the footing and first course—accuracy here saves hours later.
2.Dry-lay the first course before mixing mortar to work out cuts and bond layout.
3.Order 10% extra blocks to allow for cuts, breakages, and future repairs.
4.Hire a plate compactor rather than buying one for a once-off project; it’s far more cost-effective for DIY jobs.
5.If the wall is over about 1000 mm high, or near boundaries and structures, get an engineer involved early to avoid costly rework.

Recommended Tools

Stabila 1200 mm spirit level — reliable accuracy for block laying
Makita angle grinder with diamond masonry blade — useful for cutting blocks cleanly
Wacker Neuson plate compactor — ideal hire item for compacting base and backfill
Belle minimix concrete mixer — economical hire or purchase for repeated masonry projects
Ox brick trowel — good control for consistent mortar beds

Frequently asked questions

How high can you build a Besser block retaining wall without council approval in Australia?
In most Australian states, you can build a retaining wall up to 1 metre in height without council approval or an engineer's design, provided it does not support a surcharge load. Any wall over 1 metre, or positioned close to boundaries and easements, strictly requires structural engineering under AS 3700 and council certification.
What concrete footing size is required for a Besser block retaining wall?
A standard Besser block retaining wall requires a concrete strip footing at least 200 mm deep and 400 to 600 mm wide, using minimum 25 MPa concrete. The footing must sit on stable, undisturbed ground below the natural frost line and contain longitudinal steel reinforcement, typically N12 trench mesh, complying with AS 2870 and AS 3600.
Do you need to core-fill Besser blocks for a retaining wall?
Yes, Besser blocks used in earth-retaining structures must be core-filled with structural concrete grout to withstand lateral soil pressure. Vertical reinforcement steel, typically N12 rebar, must be tied to the footing starter bars at specified centres, followed by filling the block cores with a high-slump 20 MPa core-fill mix.
What drainage is required behind a Besser block retaining wall?
Proper drainage requires a minimum 100 mm slotted agricultural pipe wrapped in geotextile fabric laid at the footing base with a fall to stormwater. Backfill the immediate 300 mm behind the wall with free-draining 20 mm blue metal aggregate, preventing hydrostatic pressure buildup and catastrophic wall failure.
What type of mortar should be used for laying Besser blocks?
Use an M3 class structural mortar mix consisting of 1 part cement, 1 part hydrated lime, and 6 parts clean brickies sand by volume. This mix complies with AS 3700 for external masonry below damp-proof courses, providing adequate bond strength, durability, and flexibility under environmental movement.
What are the most common mistakes when building Besser block retaining walls?
The most critical mistakes include neglecting subsoil drainage, leading to hydrostatic pressure, and pouring undersized footings without starter bars. Tradies also frequently err by using heavy clay backfill instead of clean aggregate, failing to stagger vertical block joints, or exceeding 1 metre in height without qualified structural engineering sign-off.

Written by Bricko, the Building & Construction specialist at VIC.Tools.