How to build concrete steps
Concrete steps are a durable, low-maintenance way to improve front entries, garden paths and access on sloping blocks. For most homeowners, the job comes down to good set-out, solid base preparation, strong formwork and careful finishing. This guide covers simple cast-in-place external concrete ste
- Skill level
- Intermediate
- Time
- 1-2 days build time, plus 7 days curing before regular use and 28 days to full concrete strength
- Trade
- Building & Construction
- Updated
- 28 November 2026
Tools you will need
- Tape measure, builder’s square and stringline for set
- Laser level or 1200 mm spirit level
- Shovel, mattock and rake for excavation
- Plate compactor
- Wheelbarrow or concrete buggy
- Concrete mixer for bagged mixes, or arrange mini
- Circular saw or handsaw for cutting formwork timber
- Drill/driver and impact driver with exterior screws
- Hammer and formwork stakes
- Tie wire pliers
🧱 How to Build Concrete Steps: A DIY Trade Guide for Australian Homes
What are the benefits of building concrete steps in Australia?
Concrete steps are a durable, low-maintenance way to improve front entries, garden paths and access on sloping blocks. For most homeowners, the job comes down to good set-out, solid base preparation, strong formwork and careful finishing.
This guide covers simple cast-in-place external concrete steps suitable for residential foot traffic. If your steps are attached to the house structure, retain soil, support heavy loads or involve a drop requiring balustrades, get engineering advice and check local council and NCC requirements.
What skill level is required for building concrete steps in Australia?
Intermediate — Estimated time: 1-2 days build time, plus 7 days curing before regular use and 28 days to full concrete strength
What essential tools are needed for concrete step construction?
What materials are necessary for building durable concrete steps?
Safety Requirements
Step-by-Step Guide
Step 1: 1️⃣ Plan the step size and check compliance
Measure the total vertical rise from the finished ground level to the finished landing level.
For comfortable residential external steps, aim for:
Keep every riser and tread uniform. As a rule, variation between the largest and smallest riser or tread should be no more than 5 mm.
A practical width for home use is 900-1200 mm. Wider steps look better at front entries, but they use more concrete and require stiffer formwork.
Before building, confirm:
Step 2: 2️⃣ Set out the footprint and finished levels
Drive in timber pegs and run stringlines to mark the width, sides and finished front edge of the steps.
Mark:
Double-check square by measuring diagonals. If the set-out is out by even 10-15 mm, the finished steps will look skewed.
If the steps meet an existing landing, set the top tread to finish flush with that level after allowing for your concrete finish.
Step 3: 3️⃣ Excavate to firm ground
Excavate the entire footprint of the steps plus at least 75-100 mm extra on each side for formwork and working room.
Remove:
Dig down enough to allow for:
The subgrade must be firm and evenly compacted. If the ground is wet, soft or full of organic material, keep digging until you reach stable ground and rebuild with compacted fill.
If your site is steep and the sides of the steps will retain soil, stop and get advice. Retaining loads can change this from a simple DIY concrete job into structural work.
Step 4: 4️⃣ Install and compact the base
Spread road base in layers no thicker than 50 mm and compact each layer thoroughly with a plate compactor.
Build up to a finished compacted thickness of 100-150 mm. The base should be flat, dense and follow your step profile.
A properly compacted base does two jobs:
If the steps are beside the house, leave room for a 10 mm expansion joint against masonry, slab edges or walls unless an engineer has specified a fixed connection.
💡 For one-off home projects, hiring a plate compactor is almost always cheaper and better than trying to compact by hand.
Step 5: 5️⃣ Build the formwork
Construct the side forms and riser boards from straight, sound timber. Common form boards are 90 x 35 mm or 140 x 35 mm, depending on the step height.
Set each riser board to the exact finished height and brace it well with stakes at roughly 600-900 mm centres. Use screws rather than nails where possible so adjustments are easier.
Check:
Coat the inside faces with form release oil so the boards strip cleanly.
If you want a bullnose or rounded edge, plan the nosing detail now. For basic DIY steps, a square tread with a 10-15 mm edged arris is neat and durable.
Step 6: 6️⃣ Place reinforcement
Cut reinforcement mesh to fit inside the forms, allowing 40-50 mm cover from all edges.
Support the mesh on chairs or dobies so it sits in the concrete, not on the base. If the reinforcement is lying on the ground, it is doing very little.
For small pedestrian steps, SL72 or SL82 mesh is commonly used. If the steps are unusually wide, tall, suspended, support retaining walls or connect structurally to a building, the reinforcement must be engineered.
Do not randomly dowel into an existing slab or footing unless you know the structural arrangement. In many home jobs, a compressible isolation joint is safer than forcing a rigid connection.
Step 7: 7️⃣ Order or mix the concrete correctly
For external steps, use durable concrete suitable for weather exposure. A 25-32 MPa ready-mix is a good choice for residential foot traffic.
If mixing by hand or mixer:
Add only enough water to make the concrete workable. Overwatering weakens the concrete, increases shrinkage and makes finishing harder.
As a quick example, 3 steps at 1200 mm wide with 170 mm risers and 300 mm treads need roughly 0.37 m³ of concrete, so you would order about 0.40 m³ to allow for waste and spillage.
A good rule:
Step 8: 8️⃣ Pour and compact the concrete
Dampen the base lightly before the pour so it does not suck moisture out of the fresh concrete.
Place concrete starting from the bottom step and work upward. Push it well into corners and along riser boards. Use a shovel, rod or gentle tapping on the forms to remove trapped air.
Do not dump all the concrete in one heap and try to drag it around. Place it close to its final position.
Make sure reinforcement stays at the correct height while pouring. Lift mesh slightly if needed so it remains embedded with proper cover.
Strike off each tread with a straightedge and fill any low spots immediately.
Step 9: 9️⃣ Finish the treads and edges
Once the concrete has been struck off, float the surface with a magnesium float to close it up.
Then:
For external steps, a broom finish is the safest option. Run the broom across each tread to create grip, especially for wet conditions.
Avoid over-trowelling. A slick, polished surface may look tidy on the day but becomes slippery and can scale or craze.
Step 10: 🔟 Cure, strip forms and protect the new steps
Concrete needs moisture to gain strength. As soon as the surface is hard enough not to mark, begin curing.
Good curing options:
Aim to cure for at least 7 days. In hot, windy Australian conditions, curing is critical.
Strip the riser forms after about 24-48 hours if the concrete is firm enough. Avoid heavy use for at least 7 days and remember concrete reaches full design strength at about 28 days.
If desired, apply a penetrating sealer after the concrete has fully cured.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
🔧 Recommended Tools
Frequently asked questions
- What is involved in build concrete steps?
- Concrete steps are a durable, low-maintenance way to improve front entries, garden paths and access on sloping blocks. For most homeowners, the job comes down to good set-out, solid base preparation, strong formwork and careful finishing. This guide covers simple cast-in-place external concrete ste
- What skill level do I need for build concrete steps?
- Intermediate — Estimated time: 1-2 days build time, plus 7 days curing before regular use and 28 days to full concrete strength
- What are common mistakes when build concrete steps?
- 1. Making risers and treads inconsistent. Even a small variation feels unsafe and looks unprofessional. 2. Skipping proper base compaction. Poorly compacted ground is one of the main causes of cracking and settlement. 3. Using weak or poorly braced formwork. If the form bows during the pour, the finished steps will be crooked. 4. Adding too much water to the mix. This weakens the concrete and o
- What tools do I need for build concrete steps?
- This guide includes a comprehensive tools list. Key building & construction tools are detailed in the Tools Required section.
- What is the Australian standard for concrete strength in external steps?
- The Australian standard AS 3600:2018 Concrete Structures recommends a minimum 25 MPa concrete strength for external residential applications, with 32 MPa often preferred for enhanced durability and resistance to weathering. This ensures the steps can withstand Australian environmental conditions and foot traffic over time.
- How long does concrete need to cure before use in Australia?
- In Australia, concrete steps require a minimum of 7 days curing before light foot traffic and 28 days to reach their full design strength. Proper curing, as per AS 3600:2018, is critical for achieving optimal strength and preventing surface cracking, especially in varying Australian climates.
- What PPE is mandatory for concrete work in Australia?
- According to SafeWork Australia guidelines, mandatory PPE for concrete work includes safety glasses (AS/NZS 1337.1), hearing protection (AS/NZS 1270), P2 dust masks (AS/NZS 1716), alkali-resistant gloves, long sleeves, and steel-cap boots (AS/NZS 2210.3). This protects against chemical burns, dust inhalation, and physical injury.
- What is the National Construction Code (NCC) requirement for step dimensions?
- The National Construction Code (NCC) Volume Two, Part 3.9.1, specifies that risers for steps must be between 115 mm and 190 mm, and treads between 240 mm and 355 mm. These dimensions, along with consistent rise and going, are crucial for safe and compliant step construction in Australia.
Written by Bricko, the Building & Construction specialist at VIC.Tools.