How to build formwork for concrete footings
Constructing robust, dimensionally accurate formwork is critical to ensure strip and pad footings meet structural engineering specifications and boundary offsets. Poorly braced formwork risks blowouts, out-of-square foundations, and non-compliance under AS 2870 (Residential Slabs and Footings) a
Quick answer
To build formwork for concrete footings, set out profiles with string lines, erect 17 mm F17 formply backed by 90 x 45 mm pine walers, and drive 50 x 50 mm hardwood pegs at 600–900 mm centres. Secure forms with diagonal rakers, kickers, and top spreaders to prevent lateral displacement under concrete pressure per AS 3610.1 specifications.
- Skill level
- Intermediate
- Time
- 1–2 days (depending on footing run and site topography)
- Trade
- Building & Construction
- Updated
- 28 November 2026
Tools you will need
- Optical builder's square or 3
- Sledgehammer
- Cordless framing nailer
- Impact driver with structural screw bits
- Circular saw with multi
- String line
- Heavy
- Pencil and lumber crayons
🧱 Trade Guide: Constructing Formwork for Concrete Footings
Why is formwork essential for concrete footings under Australian standards?
Constructing robust, dimensionally accurate formwork is critical to ensure strip and pad footings meet structural engineering specifications and boundary offsets. Poorly braced formwork risks blowouts, out-of-square foundations, and non-compliance under AS 2870 (Residential Slabs and Footings) and AS 3600 (Concrete Structures). This guide details the professional method for setting out, fabricating, and bracing timber formwork to withstand hydrostatic concrete head pressure during placement.
Skill Level
Intermediate — ⏱️ Skill Level: Intermediate | ~1–2 days (depending on footing run and site topography)
What tools do you need to construct concrete footing formwork?
🔧 Tools Required
Optical site level or rotary laser level with receiver and tripod Optical builder's square or 3-4-5 layout tool Sledgehammer (4.5 kg / 10 lb) for driving survey and form pegs Cordless framing nailer (or 24 oz framing hammer) Impact driver with structural screw bits Circular saw with multi-material framing blade String line (high-visibility braided nylon) and line levels Heavy-duty tape measure (8 m and 30 m) Pencil and lumber crayonsWhat timber and materials are required for footing formwork?
Formply: 17 mm structural F17 ply (AS/NZS 6669 compliant) Formwork framing timber: 90 x 45 mm or 70 x 45 mm structural pine (MGP10 / F5 treated or unseasoned) Formwork pegs/stakes: 50 x 50 mm hardwood pegs (pointed), lengths: 450 mm to 900 mm Spreader ties / kickers: 70 x 35 mm or 70 x 45 mm pine offcuts Fasteners: 75 mm hot-dip galvanised nails or 75 mm exterior bugle-head structural screws Bar chairs / plastic trench mesh spacers (50/65 mm cover) Form release agent: Biodegradable emulsion oil (chemically active) Vapour barrier / damp-proof membrane: 200 μm (0.2 mm) polyethene (as required by project specifications)What safety controls apply when building footing formwork on Australian worksites?
⚠️ Safety
Mandatory PPE: Steel-cap work boots (AS/NZS 2210.3), eye protection (AS/NZS 1337), hearing protection class 5 for power tools, and high-visibility clothing. Trench Safety: Strictly adhere to Safe Work Australia codes of practice for excavation work. Trenches exceeding 1500 mm depth require battering, benching, or structural shoring. Keep all spoil heaps at least 600 mm back from the excavation edge. Manual Handling: Adhere to safe two-person lift procedures for pre-fabricated forms, structural timber packs, and heavy compaction gear. Underground Services: Dial Before You Dig (DBYD/Before You Dig Australia) asset plans must be clear on-site prior to driving any pegs or excavation.Step-by-Step Guide
Step 1: 1️⃣ Establish Site Pegs, Profiles, and Datum
Establish the building footprint using external profile boards set back a minimum of 1500 mm from the footing edge to allow uninhibited machine access and peg driving. Pull braided string lines along grid intersections, squaring corners using the 3000 mm x 4000 mm x 5000 mm (3-4-5) triangle method or long-distance diagonal checks. Transfer corner intersections to ground level using a plumb bob or laser plumb, and benchmark the Finished Underside of Footing (U/F) and Top of Footing (T/F) using an optical or rotating laser level calibrated to the primary site Australian Height Datum (AHD) or designated TBM.
Step 2: 2️⃣ Site Excavation and Trench Preparation
Excavate strip or pad footings to the depth specified by the structural engineer, accounting for natural ground fall and target founding material (e.g., solid rock, stiff clay). Clean loose spoil from the trench bottom using a flat-bladed spade or clean-out bucket. Ensure the base complies with AS 2870 bedding standards. If specified, line the earth face with 200 μm polyethene membrane with minimum 200 mm taped laps.
Step 3: 3️⃣ Fabricate and Position Formwork Shutters
Rip 17 mm F17 formply down to the required footing depth (e.g., 400 mm or 600 mm), or use structural 90 x 45 mm timber side rails for shallow drops. Stiffen the plywood backs using horizontal 90 x 45 mm walers (strongbacks) spaced at maximum 400 mm centres. Stand the form shutters parallel along the string line, offsetting the inside face of the formply precisely to the design boundary of the footing trench.
Step 4: 4️⃣ Drive Pegs and Fix External Bracing
Drive 50 x 50 mm hardwood pegs into solid ground behind the form shutters at maximum 600 mm to 800 mm centres. Screw through the external walers into the driven pegs using 75 mm bugle screws. To resist outward hydrostatic concrete loads, install angled kicker braces (70 x 45 mm) running at a 45° angle from the top horizontal waler down to short driven timber pegs staked firmly in unyielding ground. Ensure pegs are deep enough not to push back during concrete vibration.
Step 5: 5️⃣ Install Spreaders, Internal Ties, and Set Levels
Bridge the top of the parallel form faces with 70 x 35 mm timber spreaders cut exactly to the engineered footing width (e.g., 450 mm, 600 mm). Nail or screw spreaders across the form tops at 1200 mm centres to prevent form closure or bowing. Strike laser-checked level marks on the inside face of the formply shutters using a permanent marker, or install a timber datum stop chamfer strip along the top lip to guide concreters during placement.
Step 6: 6️⃣ Apply Release Agent and Place Reinforcement
Coat the interior face of the plywood formwork with an approved chemical form release agent; avoid overspray onto the ground or reinforcement. Lower the trench mesh (e.g., TM8 or TM12) into position using plastic bar chairs to maintain specified bottom concrete cover of minimum 50 mm to 65 mm in accordance with AS 3600. Ensure all corner ties and starters have minimum 500 mm structural laps and are securely wire-tied. Conduct a final diagonal and level check before scheduling the building certifier's pre-pour inspection.
Common Mistakes to Avoid
Pro Tips
💡 Screw, Don't Nail Shutters: Assemble walers and primary peg bracing using heavy-duty external structural screws rather than nails. Screws eliminate heavy hammer impacts that can misalign forms, and they drastically speed up post-pour stripping without damaging reusable F17 ply. 💡 Chamfer Top Corners: Tack a 19 mm x 19 mm timber chamfer fillet strip along the target pour height on the inside of the form. This prevents edge chipping when stripping forms and creates an exceptionally clean, straight structural reveal. 💡 Tape Formwork Plywood Joints: Run high-adhesion duct tape or PVC barrier tape over formply butt joints. This prevents cement slurry (grout loss) bleed-out, which eliminates honeycombing at joints and keeps form faces cleanly reusable. 💡 Equipment Economics: For sites requiring deep pad footings or extensive strip forms across rock, hire hydraulic post-hole borers, mini-excavators, and laser packages from equipment hire yards. Purchasing heavy plant is only cost-effective if maintaining continuous commercial-scale turnover.Recommended Tools
🔧 Topcon or Leica Rotating Laser Level Kit: Search for self-levelling dual grade rotary laser with digital millimetre receiver — essential for shot accuracy across broad footprint trench drops. 🔧 Paslode FormMaster or Duo-Fast Framing Gun: Search for pneumatic or cordless positive placement framing gun — indispensable for rapidly securing walers, stakes, and bracing under heavy production loads. 🔧 Stabila Type 196 Heavy-Duty Level (1200 mm & 2400 mm): Search for Stabila heavy-duty aluminium box beam level — the standard for keeping vertical formply panels plumb and plumb line setups rigid.Frequently asked questions
- What is involved in build formwork for concrete footings?
- Constructing robust, dimensionally accurate formwork is critical to ensure strip and pad footings meet structural engineering specifications and boundary offsets. Poorly braced formwork risks blowouts, out-of-square foundations, and non-compliance under AS 2870 (Residential Slabs and Footings) a
- What skill level do I need for build formwork for concrete footings?
- Intermediate — ⏱️ Skill Level: Intermediate | ~1–2 days (depending on footing run and site topography)
- What are common mistakes when build formwork for concrete footings?
- 1. Inadequate Kicker Bracing: Relying solely on short stakes driven into loose surface spoil. Liquid concrete generates immense lateral hydrostatic pressure that easily levers vertical stakes out, leading to costly formwork blowouts. 2. Omitting Top Spreaders: Forgetting to fix mechanical ties or spreaders across the top of parallel forms causes the forms to splay outwards or squeeze inw
- What tools do I need for build formwork for concrete footings?
- This guide includes a comprehensive tools list. Key building & construction tools are detailed in the Tools Required section.
- What Australian Standard governs concrete footing formwork?
- Formwork design and fabrication are governed by AS 3610.1:2010 (Formwork for Concrete), while concrete footing dimensions and steel placement must satisfy AS 2870-2011 (Residential Slabs and Footings) and AS 3600:2018. Compliance ensures structural stability, correct clear cover for reinforcing mesh, and tolerance against lateral pressure blowouts during concrete pours.
- What thickness timber or ply is required for footing forms?
- Professional footing formwork typically requires 17 mm F17 structural formply conforming to AS/NZS 6669, supported by 90 x 45 mm or 70 x 45 mm structural pine framing studs. Thinner untreated sheet goods flex under lateral pressure, causing out-of-square bulges exceeding the allowable ±10 mm tolerances specified in AS 2870.
- How far apart should formwork pegs and braces be spaced?
- Drive 50 x 50 mm hardwood pegs at maximum 900 mm centres along the footing line, reduced to 600 mm for footings deeper than 400 mm. Secure diagonal raker braces from the top of the form down to solid ground pegs to prevent the outward hydrostatic thrust of wet concrete from shifting form alignment.
- When can footing formwork be stripped after pouring concrete?
- According to AS 3610.1, vertical footing side forms can generally be removed 24 to 48 hours post-pour, provided the ambient temperature exceeds 10°C and concrete has set sufficiently to avoid edge damage. Structural loading or backfilling must not occur until structural engineer clearance or standard 28-day curing milestones are reached.
Written by Bricko, the Building & Construction specialist at VIC.Tools.