How to lay bricks for a garden edging
🧱 How to lay bricks for a garden edging Brick garden edging is a practical weekend project that gives garden beds, lawns, and paths a clean, durable border while helping keep mulch and soil in place. For Australian homeowners, it’s a good entry-level bricklaying job because it uses simple set-
- Skill level
- Beginner / Intermediate
- Time
- 1–2 days for 5–15 m of edging
- Trade
- Building & Construction
- Updated
- 28 November 2026
Tools you will need
- Brick trowel, 250
- Rubber mallet for tapping bricks into level
- Spirit level, minimum 600 mm
- String line and line pins
- Tape measure, minimum 5 m
- Shovel and trenching spade
- Hand tamper or plate compactor for longer runs
- Wheelbarrow for moving sand, soil, and mortar
- Bucket for water and mixing
- Mixing tray or mortar tub
What is involved in laying bricks for garden edging in Australia?
🧱 How to lay bricks for a garden edging
Brick garden edging is a practical weekend project that gives garden beds, lawns, and paths a clean, durable border while helping keep mulch and soil in place. For Australian homeowners, it’s a good entry-level bricklaying job because it uses simple set-out, shallow excavation, and basic mortar or compacted base methods without the complexity of full structural masonry.
This guide covers how to plan, excavate, prepare the base, and lay bricks neatly for straight or curved edging, with tips suited to DIY beginners. While garden edging is generally non-structural, good practice should still follow the principles of AS 3700 Masonry Structures, and any adjacent drainage, paving, or concrete work should be completed to sound construction standards.
What skill level is required for Australian garden brick edging projects?
Beginner / Intermediate — Estimated time: 1–2 days for 5–15 m of edging
What tools are essential for laying brick garden edging?
What materials are needed for a typical brick garden edging project?
Safety Requirements
Step-by-Step Guide
Step 1: Plan the edging layout
1️⃣ Mark out the line
Decide whether your edging will be flush with the lawn, slightly raised, or laid on edge for a stronger visual border. Common options are:
Mark the line with string for straight runs or a garden hose/marking paint for curves. Check the finished path looks natural from several viewing angles before digging.
For straight edging, pull a taut string line between stakes. For curves, keep the radius gentle so standard bricks can follow the shape with even joints.
Step 2: Check levels and drainage
2️⃣ Set the finished height
Decide where the top of the brick should finish relative to lawn, soil, or path surface. A common finish is:
Use a spirit level and string line to avoid low spots that trap water. For longer runs, allow slight falls so water drains away naturally rather than ponding behind the edging.
💡 If edging borders a path or paving, match the finished level carefully so you don’t create a trip edge.
Step 3: Excavate the trench
3️⃣ Dig to the correct depth and width
Excavate a trench wide enough for the brick plus working room on each side. For standard bricks, make the trench about 150–200 mm wide depending on brick orientation.
Depth depends on how the brick will sit:
Remove roots, loose topsoil, and organic matter. The base should be dug into firm ground, not soft mulch or uncompacted fill.
If the soil is very soft, over-excavate slightly and replace with compacted road base.
Step 4: Prepare and compact the base
4️⃣ Create a stable foundation
Spread a compacted base layer of road base or crushed rock to about 50–75 mm where the ground is soft or where you want a longer-lasting edge. On firm ground for simple edging, a compacted sand base may be enough.
Compact thoroughly using a hand tamper. For longer sections, hiring a small plate compactor is often more economical than buying one for a once-off project.
Add a bedding layer of sand or mortar:
For mortar, use a workable mix and only prepare what you can place before it begins to stiffen. A general-purpose mix of 1:2:3 is commonly used for light domestic masonry work.
Step 5: Dry-lay and test the pattern
5️⃣ Trial the brick placement
Before fixing anything in place, lay out a short run of bricks dry to confirm spacing, curves, and where cuts will fall. This helps avoid awkward small pieces at the end.
Aim for consistent joints around 10 mm for mortared work. For dry-laid edging, bricks can be butted tighter depending on the style, but small uniform gaps often look neater and help maintain alignment.
For curves, fan the joints slightly rather than forcing bricks hard against each other. Spread the adjustment gradually over the curve.
💡 Start from the most visible end or a corner feature so cut bricks finish in a less noticeable location.
Step 6: Lay the bricks
6️⃣ Bed and align each brick
Place each brick onto the sand bed or mortar bed and tap gently with a rubber mallet until it reaches the correct level. Use the string line and spirit level regularly.
If using mortar:
If laying dry on sand:
For edging laid on edge, ensure each brick has enough embedment below ground so it won’t lean over time. A good rule is to bury at least one-third of the brick where practical for non-structural garden use.
Step 7: Cut bricks where required
7️⃣ Trim neatly for ends and curves
Where the run finishes or curves tighten, you may need cut bricks. Mark the cut clearly using a square or pencil line.
For occasional cuts, use a brick bolster and club hammer. For multiple cuts or cleaner curved work, use a masonry saw. Always wear eye, hearing, and dust protection.
Place cut faces in less visible positions where possible. Keep cut sizes practical—very small slivers tend to loosen or crack over time.
Step 8: Haunch and secure the edging
8️⃣ Support the sides
Once the bricks are aligned, support them so they don’t shift. For dry-laid edging, sweep sand into joints and backfill both sides firmly.
For mortared edging, place a small concrete or mortar haunch along the concealed side if extra support is needed, especially for raised or on-edge bricks. Keep the visible face neat and avoid smearing mortar on brick surfaces.
Where the edging borders lawn, compact soil firmly against the outside face. On the garden bed side, backfill with soil or mulch after the bricks are stable.
Step 9: Finish joints and clean up
9️⃣ Complete the final presentation
Tool mortar joints once they begin to firm up but before they fully harden. A slightly concave joint usually sheds water well and gives a tidy finish.
Brush off loose material and sponge off any mortar smears before they set hard. Do not over-wet fresh mortar.
For dry-laid edging, top up jointing sand after the first watering or rainfall if any settlement occurs.
Step 10: Cure and maintain
🔟 Let the edging settle properly
If mortar was used, protect the work from heavy rain and disturbance for at least 24–48 hours. Lightly mist in hot weather if needed to prevent mortar drying too fast.
Check the edging after a week for any movement or settlement, particularly in soft ground. Repack soil, sand, or mulch as needed.
Ongoing maintenance is simple:
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What is involved in lay bricks for a garden edging?
- 🧱 How to lay bricks for a garden edging Brick garden edging is a practical weekend project that gives garden beds, lawns, and paths a clean, durable border while helping keep mulch and soil in place. For Australian homeowners, it’s a good entry-level bricklaying job because it uses simple set-
- What skill level do I need for lay bricks for a garden edging?
- Beginner / Intermediate — Estimated time: 1–2 days for 5–15 m of edging
- What are common mistakes when lay bricks for a garden edging?
- 1. Digging too shallow and laying bricks directly on loose topsoil, which leads to movement and uneven settlement. 2. Skipping compaction of the base, especially in soft or recently filled ground. 3. Not using a string line or level, resulting in a wavy finished edge. 4. Making joints inconsistent, which looks untidy and weakens the overall line. 5. Using tiny cut brick pieces at the ends instead
- What tools do I need for lay bricks for a garden edging?
- This guide includes a comprehensive tools list. Key building & construction tools are detailed in the Tools Required section.
- What is the recommended mortar mix ratio for garden edging in Australia?
- For non-structural garden edging in Australia, a general-purpose mortar mix of 1 part cement to 2 parts brickies sand (1:2) is commonly recommended. For enhanced strength, especially in high-traffic areas, a 1:3 cement to sand ratio can be used. Always ensure clean, potable water is used for mixing.
- How much bedding sand or road base is needed for brick garden edging?
- A compacted layer of 20-50 mm of bedding sand or road base is typically required for brick garden edging. For a 10-metre length of single-brick edging, this translates to approximately 0.1 to 0.25 cubic metres of material, depending on the trench width and desired base thickness.
- Are there specific Australian standards for garden edging construction?
- While there isn't a specific Australian Standard solely for garden edging, AS 3700 Masonry Structures provides overarching principles for masonry construction. For drainage and ground preparation, AS/NZS 3500 Plumbing and Drainage standards may offer relevant guidance, particularly concerning water flow and soil stability around structures.
Written by Bricko, the Building & Construction specialist at VIC.Tools.