How to lay bricks for a house extension

Laying bricks for a house extension requires accurate set-out, compliant footings, consistent mortar control, correct bonding patterns, and ongoing checks for line, level, plumb, and gauge. For Australian residential and commercial work, masonry must be constructed in accordance with AS 3700 Mason

Skill level
Advanced
Time
3–10 days depending on wall area, height, openings, site access, weather, and complexity of ties, articulation joints, and structural details.
Trade
Building & Construction
Updated
28 November 2026

Tools you will need

  • Brick trowel, 11 in / 280 mm to 300 mm blade
  • Pointing trowel for perps and joint finishing
  • Spirit levels: 600 mm, 1200 mm, and 1800 mm
  • String line and line pins/line blocks
  • Bricklayers profiles/corner poles
  • Gauge rod marked to brick course heights
  • Club hammer and brick bolster
  • Brick saw or wet masonry saw with diamond blade
  • Mason’s jointer / jointing iron
  • Tape measure, minimum 8 m

🧱 How to Lay Bricks for a House Extension

What are the key Australian Standards for laying bricks on a house extension?

Laying bricks for a house extension requires accurate set-out, compliant footings, consistent mortar control, correct bonding patterns, and ongoing checks for line, level, plumb, and gauge. For Australian residential and commercial work, masonry must be constructed in accordance with AS 3700 Masonry Structures, with footing and slab interfaces coordinated to AS 3600 Concrete Structures and any engineer’s documentation.

How long does it take to lay bricks for a residential extension?

Advanced — Estimated time: 3–10 days depending on wall area, height, openings, site access, weather, and complexity of ties, articulation joints, and structural details.

What tools do professional bricklayers use for home extensions?

Brick trowel, 11 in / 280 mm to 300 mm blade
Pointing trowel for perps and joint finishing
Spirit levels: 600 mm, 1200 mm, and 1800 mm
String line and line pins/line blocks
Bricklayers profiles/corner poles
Gauge rod marked to brick course heights
Club hammer and brick bolster
Brick saw or wet masonry saw with diamond blade
Mason’s jointer / jointing iron
Tape measure, minimum 8 m
Square and builder’s pencil/chalk line
Shovel, wheelbarrow, and mortar hoe or mechanical mortar mixer
Buckets for measured batching and water control
Spot board or mortar board
Scaffolding rated for masonry work
Brick clamps or brick tongs for manual handling
Laser level or dumpy level for extension set-out
Soft brush for face brick clean-down
SDS drill and bits if retrofitting wall ties/dowels to existing structure

Which mortar mix and materials are required under AS 3700?

Face bricks or common bricks to project specification, allow 5–10% waste
Mortar materials:
GP cement
brickies lime or masonry cement
clean washed brick sand
Mortar additives only if specified and compatible with project requirements
Clean potable water
Damp-proof course (DPC) or flashing material to detail
Wall ties to engineer/specification, corrosion classification suitable to exposure zone
Articulation joint filler and sealant
Cavity insulation if required by specification
Cavity trays/weep hole formers where required
Reinforcement, brickwork control joints, and lintels as detailed
Lintels over openings to engineer/manufacturer sizing
Ant caps/termite management components where required by state regulations
Cleaning materials suitable for the brick type
Mortar mix:
General-purpose site work commonly around 1:1:6 (cement:lime:sand) subject to project spec
Structural or engineered masonry mortar to project specification
Concrete where required for associated footing or fill works: 1:2:3 general purpose, 1:1.5:2.5 structural

Safety Requirements

Wear PPE: hard hat, safety boots, gloves, eye protection, hearing protection, long sleeves, and P2 dust mask when cutting bricks or handling cement.
Use correct manual handling techniques; bricks, mortar, and lintels create repetitive strain and crush hazards.
Scaffolding must be installed, tagged, and used in accordance with site requirements and relevant regulations; never work from improvised platforms.
Control silica dust during cutting with wet cutting methods or local extraction.
Verify footing capacity, existing wall tie-in details, and structural requirements before starting; structural masonry and tied extensions require engineering certification.
Waterproofing and flashing interfaces must comply with project details and relevant standards, including AS 3740 where wet-area junctions are involved.
Confirm council approvals, NCC requirements, and state-based building compliance before commencing.

Step-by-Step Guide

Step 1: Set Out the Extension Brickwork

Establish the wall lines from approved drawings using a string line, tape, and laser or dumpy level. Check overall dimensions, external corners, wall thickness, cavity widths, openings, and tie-in points to the existing structure.

Mark all corners and opening locations clearly on the slab or footing. Confirm the first course location relative to slab edges, rebates, DPC positions, articulation joints, and control joints.

For face brickwork, calculate the gauge before starting. Measure the nominated brick height plus mortar bed to determine course spacing, then transfer this to a gauge rod. This ensures sill heights, lintel heights, and wall plate levels finish correctly without undersized closing courses.

💡 Always dry-check opening widths against actual frame sizes and lintel bearings before laying the first brick.

Step 2: Check Footings, Slab Edge, and Base Preparation

Inspect the footing or slab for level, dimensions, and compliance with the engineer’s drawings. Brick veneer, double brick, and structural masonry all have different support requirements, so verify the wall type before proceeding.

If laying on concrete, ensure the surface is clean and free from laitance, mud, curing compounds, and debris. Mark DPC locations and any changes in level.

Check that slab rebates, set-downs, or edge thickenings are correct for the wall system. Any major level discrepancies should be rectified before bricklaying begins, not buried in excessive mortar beds.

Reference footing and concrete support conditions against AS 3600 Concrete Structures and the structural documentation.

Step 3: Prepare Mortar to a Consistent Trade Mix

Mix mortar to suit the brick type, exposure conditions, and specification. For standard clay brickwork, a common site mortar is around 1:1:6 cement:lime:sand, but always follow the project specification or engineer’s requirements.

Use measured batching for consistency. Add water gradually and mix until the mortar is workable, cohesive, and able to hold on the trowel without slumping. Mortar that is too wet will stain face brickwork and reduce bond quality; too dry and it will not bed properly.

Only mix quantities that can be used within the workable period, especially in hot or windy conditions. Re-tempering should be limited and done only within acceptable trade practice and manufacturer guidance.

💡 Consistent sand moisture and bucket batching produce far more uniform joint colour on face brickwork than shovel-count mixing.

Step 4: Lay and Level the Leads First

Start by building corner leads at each end of the wall. Leads control the height, level, and plumb of the entire run, so take your time here.

Lay the first course on a full mortar bed, buttering perps adequately and maintaining the specified joint thickness, typically around 10 mm unless otherwise detailed. Use the level on every brick initially to establish the plane.

Build each lead up several courses, checking:

Plumb in both directions
Level across the course
Correct gauge against the rod
Bond pattern alignment
Opening set-out and return dimensions

For house extensions, stretcher bond is common in veneer work, while structural masonry may vary according to engineering and architectural documentation.

Step 5: Run the String Line and Lay Intermediate Courses

Fix the string line tight between leads using line blocks or pins. Keep the line just touching the arris of the bricks so each course runs true.

Spread a consistent mortar bed for 3–5 bricks at a time, depending on conditions. Furrow the bed slightly with the trowel if needed for bedding control, then place each brick firmly into position, tapping to line and level.

Butter the perp end fully before placing the next brick. Maintain even bed and perp joints, and avoid pushing mortar onto exposed faces. Regularly cut out excess mortar from the cavity side to prevent bridging.

On longer runs, continuously check:

Line
Level
Gauge
Wall thickness
Cavity width
Plumb of the face

💡 Don’t outrun your line. Fast bricklayers lose more time correcting bellied walls than they save by rushing.

Step 6: Maintain Bond, Gauge, and Joint Uniformity

Keep the chosen bond pattern consistent across all elevations, returns, piers, and junctions. Stretcher bond is typical for cavity brick veneer, while English or Flemish bond may be used for feature or structural work if specified.

Use your gauge rod every few courses to avoid cumulative error. Even a 2 mm deviation per course becomes a major problem by lintel height.

Keep bed joints and perps uniform, generally around 10 mm. Where closure bricks are required, cut them cleanly with a brick saw rather than relying on oversized joints.

Ensure face brick orientation, texture, and colour blending are controlled as you go. Draw from multiple packs to avoid noticeable batching or colour patching.

Step 7: Install Wall Ties, DPCs, Flashings, and Weeps

For cavity construction, install wall ties at the specified spacing and embedment in accordance with the wall system, exposure classification, and engineer/manufacturer requirements. Keep ties sloping slightly outward toward the external leaf to shed moisture.

Install DPCs, flashings, cavity trays, and weepholes exactly to the detail. Poor moisture management is one of the most common failure points in extension work, particularly where new brickwork ties into existing walls.

At door and window openings, provide flashings and weepholes above lintels where required. Keep cavities clean and free of mortar dags that could transfer moisture across the cavity.

Reference masonry detailing to AS 3700 Masonry Structures and project drawings.

Step 8: Form Openings, Lintels, and Articulation Joints

Set out openings accurately from the start and regularly confirm frame tolerances. Install lintels with the required end bearing, level and centred over openings in accordance with manufacturer data and engineering details.

Do not build loads onto unsupported lintels until they are correctly seated and stable. Check whether temporary propping is required.

Provide articulation or control joints where shown on the drawings or required by masonry movement provisions. Fill joints with the correct compressible backing and sealant system; do not mortar them solid.

When tying a new extension into an existing dwelling, use the specified wall starter or mechanical tie system. Differential movement between old and new work must be allowed for, especially on reactive clay sites.

Step 9: Tool the Joints and Finish the Face Work

Tool joints when the mortar reaches thumbprint hardness. The timing is critical: too early and joints smear; too late and they tear.

Use the specified joint profile, commonly ironed or concave for weather resistance. Ensure all joints are fully compacted and neatly finished for appearance and durability.

Brush down the wall lightly after jointing. Avoid aggressive cleaning while mortar is green, especially on porous face bricks. Final acid cleaning, if permitted for the brick type, should only be done in accordance with brick manufacturer recommendations.

💡 Trial any acid or proprietary cleaner on an offcut or hidden area first. Some bricks permanently mark or bleach.

Step 10: Carry Out Final Quality Checks

Before signing off the work area, inspect for:

Plumb walls
Straight lines and even gauge
Correct bond
Consistent joint thickness
Clean cavity
Proper flashing and weephole installation
Lintel seating
Joint finish quality
Alignment with frames and adjoining structure

Check tolerances against project requirements and normal trade expectations. Any out-of-plumb, bulging, or poorly bonded work is easier to correct immediately than after roof, render, or fit-off stages commence.

On structural or loadbearing masonry, confirm inspection requirements with the engineer or certifier before concealment.

Common Mistakes to Avoid

1.Building off an out-of-level slab or footing and trying to correct it with thick mortar beds instead of proper set-out and rectification.
2.Failing to maintain gauge, resulting in sill, lintel, and ceiling lines finishing out by 10–30 mm or more.
3.Inadequate perp filling and poor bedding, which weakens the wall and reduces weather resistance.
4.Leaving mortar droppings in cavities, causing moisture bridging and long-term damp issues.
5.Incorrect placement or omission of ties, flashings, weepholes, and articulation joints.
6.Using inconsistent mortar batching, leading to colour variation and variable bond strength.
7.Cutting corners on lead accuracy, which causes bowed runs and misaligned openings.

Pro Tips

Use a dedicated gauge rod for every job and mark key heights such as slab, sill, lintel, top plate, and flashing levels before laying starts.
Blend bricks from at least 3 packs at once on face jobs to avoid obvious colour banding.
In hot weather, control suction by lightly managing brick moisture where appropriate for the product type, but never over-wet the units.
Keep the cavity clean as you go with regular strike-off and inspection; don’t leave cleanup until the end.
For extension tie-ins, confirm existing wall condition and movement history before fixing wall starters—older homes often have hidden settlement or irregular coursing.
Hire a quality brick saw and scaffold for medium-to-large jobs rather than purchasing if usage is occasional; the economics generally favour hire once maintenance, transport, and storage are considered.

Recommended Tools

OX Pro Brick Trowel 280–300 mm — reliable balance and blade stiffness for daily laying
Stabila 1200 mm Spirit Level — accurate for checking plumb and level on leads and openings
Husqvarna Wet Masonry Saw — clean, accurate cuts with better dust control on face brickwork
Belle Minimix or equivalent mortar mixer — consistent mortar batching and reduced labour on larger runs
Adjustable bricklayers profiles/corner poles — speeds up accurate lead setup and line control

Frequently asked questions

What is involved in lay bricks for a house extension?
Laying bricks for a house extension requires accurate set-out, compliant footings, consistent mortar control, correct bonding patterns, and ongoing checks for line, level, plumb, and gauge. For Australian residential and commercial work, masonry must be constructed in accordance with AS 3700 Mason
What skill level do I need for lay bricks for a house extension?
Advanced — Estimated time: 3–10 days depending on wall area, height, openings, site access, weather, and complexity of ties, articulation joints, and structural details.
What are common mistakes when lay bricks for a house extension?
1. Building off an out-of-level slab or footing and trying to correct it with thick mortar beds instead of proper set-out and rectification. 2. Failing to maintain gauge, resulting in sill, lintel, and ceiling lines finishing out by 10–30 mm or more. 3. Inadequate perp filling and poor bedding, which weakens the wall and reduces weather resistance. 4. Leaving mortar droppings in cavities, caus
What tools do I need for lay bricks for a house extension?
This guide includes a comprehensive tools list. Key building & construction tools are detailed in the Tools Required section.
What is the Australian Standard for bricklaying in residential extensions?
The primary Australian Standard is AS 3700-2018 (Masonry Structures) alongside AS 4773 (Masonry in Small Buildings). These standards dictate cavity dimensions, mortar classifications (typically M3 for external brickwork), wall tie placement, and minimum bed and perp joint alignments. Compliance ensures the structural integrity and weatherproofing required under NCC 2022.
How do you tie a brick extension to an existing brick wall?
To tie a new brick wall to an existing structure, install stainless steel or galvanised expansion-anchored wall ties or stainless steel starter tracks into the existing mortar beds or brickwork every 3 to 4 courses (maximum 300 mm to 600 mm vertically). This permits regulated movement while providing lateral stability per AS 4773.1.
What is the correct mortar mix ratio for Australian residential bricklaying?
The standard Australian M3 mortar mix ratio is 1 part General Purpose (GP) cement, 1 part hydrated lime, and 6 parts washed brickies sand (1:1:6). For coastal or high-durability zones (M4), the standard requires 1 part GP cement, 0.5 parts hydrated lime, and 4.5 parts sand, mixed with clean potable water.
What is the minimum cavity width for brick veneer extensions in Australia?
Under the National Construction Code and AS 4773, the clear cavity width between the external brick leaf and internal frame or existing wall must be between 25 mm and 50 mm. A 40 mm to 50 mm clear cavity is standard practice to prevent water bridging and allow clean fall of mortar droppings.

Written by Bricko, the Building & Construction specialist at VIC.Tools.