How to repair mortar joints in a brick wall
Repairing mortar joints, often called repointing, involves removing loose or deteriorated mortar and replacing it with fresh mortar to restore strength, improve appearance, and reduce water ingress. For Australian homeowners, this is a practical maintenance job on aging brickwork, provided the wall
- Skill level
- Intermediate
- Time
- 4–8 hours for a small wall area of around 5–10 m², plus curing time
- Trade
- Building & Construction
- Updated
- 29 November 2026
Tools you will need
- Brick bolster and club hammer for removing loose mortar
- Joint raker or mortar raking tool with depth guide
- Pointing trowel, margin trowel, and small brick trowel
- Mortar hawk or hand board
- Stiff nylon brush and masonry brush
- Bucket or mixing tub, plus measuring bucket
- Drill with paddle mixer for consistent mortar mixing
- Spray bottle or low
- Sponge and clean rags for final cleanup
- Ladder or scaffold platform for higher wall sections
🧱 Repairing Mortar Joints in a Brick Wall: DIY Repointing Guide for Australian Homes
What is repointing and why is it important for Australian brick walls?
Repairing mortar joints, often called repointing, involves removing loose or deteriorated mortar and replacing it with fresh mortar to restore strength, improve appearance, and reduce water ingress. For Australian homeowners, this is a practical maintenance job on aging brickwork, provided the wall is not structurally compromised and the damage is limited to the joints rather than the bricks themselves.
What skill level is required for repointing brickwork in Australia?
Intermediate — Estimated time: 4–8 hours for a small wall area of around 5–10 m², plus curing time
What essential tools are needed for repointing mortar joints in Australia?
What materials are necessary for repointing brick walls in Australia?
What safety precautions should Australian tradies take when repointing?
Step-by-Step Guide
Step 1: Inspect the Wall and Confirm It’s Suitable for Repointing
Check whether the issue is limited to surface mortar loss, hairline cracking, or shallow gaps between bricks. Repointing is suitable where bricks are generally sound and the wall is stable.
Look for warning signs that indicate a larger structural problem, such as bulging brickwork, major stepped cracks, leaning walls, or recurring separation around openings. If you see these, stop and get a bricklayer or structural engineer involved.
As a guide, if mortar is loose, powdery, cracked, or missing to a depth of more than 10–15 mm, it is usually worth repairing. Tap around the joints with a tool handle and mark hollow or weak areas.
Step 2: Match the Existing Mortar
Before mixing anything, work out the likely type and colour of the original mortar. Older Australian homes often used softer lime-rich mortars, while newer homes may use cement-lime-sand blends.
Using mortar that is too hard can damage older bricks by trapping moisture or causing the bricks to take the stress instead of the joint. For many non-structural repointing jobs, a typical site-mixed mortar for brickwork is around 1:1:6 cement:lime:sand, though matching the existing mortar is more important than using a one-size-fits-all mix.
If you are working on modern brick veneer or more exposed locations, a proprietary mortar mix may be the easiest option. Test a small sample first and let it dry, because mortar usually cures lighter than it looks when wet.
Step 3: Remove the Damaged Mortar
Rake out the defective mortar carefully to a minimum depth of about 15–20 mm, or until you reach firm material. This gives the new mortar enough depth to bond properly.
For small DIY jobs, use a joint raker, plugging chisel, or brick bolster. If using an angle grinder, be very careful not to chip the brick arrises. Cut into the centre of the joint only and avoid widening the joint unnecessarily.
Work methodically in small sections. Bed joints are generally easier than perpend joints, so take your time around vertical joints and corners.
Step 4: Clean Out the Joints Thoroughly
Brush out all dust, loose grit, and crumbly mortar with a stiff brush. Any debris left in the joint will weaken the bond of the new mortar.
If needed, use compressed air or a vacuum, but brushing is usually enough for small domestic jobs. The cleaner the joint, the better the result.
Do not leave powdery surfaces in the back of the joint. Fresh mortar needs a sound, slightly rough substrate to key into.
Step 5: Pre-Dampen the Brickwork
Lightly mist the joints and surrounding bricks with clean water before pointing. The bricks should be damp, not dripping wet.
This step is especially important in hot, dry, or windy Australian conditions because dry bricks will suck moisture out of the fresh mortar too quickly. Rapid drying can lead to poor curing, shrinkage cracking, and weak joints.
On very absorbent bricks, you may need to dampen twice, allowing surface water to soak in before applying mortar.
Step 6: Mix the Mortar
Mix only as much mortar as you can use in about 30–45 minutes. For general small repairs, a pre-blended mortar is the easiest option for beginners and gives more consistent results.
If mixing your own, carefully batch ingredients by volume and keep the mix consistent across the whole repair area. The mortar should be workable and firm enough to stay on the trowel without slumping.
For reference, general-purpose concrete ratios like 1:2:3 and structural concrete like 1:1.5:2.5 are not used for repointing brick joints. Mortar for brickwork is a different blend and should be suited to masonry repair, not concrete placement.
Step 7: Pack the New Mortar into the Joints
Use a pointing trowel or tuck pointer to press mortar firmly into the back of the joint. Fill deeper joints in layers if required rather than trying to pack in too much at once.
Start with the vertical perpend joints, then complete the horizontal bed joints. Compact the mortar tightly so there are no voids behind the face.
Keep mortar off the brick faces as much as possible. Smearing mortar across porous bricks can stain them and make cleanup difficult.
Step 8: Finish the Joint to Match the Existing Profile
Allow the mortar to firm up slightly, then tool the joint to match the original finish. Common profiles include flush, ironed, weather-struck, or slightly recessed joints.
Tooling compacts the surface and improves weather resistance. A properly finished joint also gives the repair a much neater, more consistent appearance.
Use the correct jointing tool width to suit the joint size, usually around 10 mm on standard brickwork, though this varies by age and brick type.
Step 9: Clean the Brick Face
Once the mortar is thumbprint firm, brush off crumbs with a soft or medium masonry brush. Avoid scrubbing too early, or you may drag mortar out of the joints.
Do not wash the wall heavily during early curing. If needed, use a barely damp sponge for small smears only.
For stubborn haze after curing, use a suitable masonry cleaner as per manufacturer instructions, but test it first because aggressive acid cleaning can damage mortar and some brick finishes.
Step 10: Cure and Protect the Repair
Fresh mortar needs time to cure properly. Protect the repaired area from direct sun, strong wind, and heavy rain for at least 48–72 hours.
In warm weather, lightly mist the wall over the first 1–2 days to slow drying. Do not saturate it.
Avoid painting, sealing, or pressure washing the wall until the mortar has properly cured. Good curing improves strength, durability, and colour consistency.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What is involved in repair mortar joints in a brick wall?
- Repairing mortar joints, often called repointing, involves removing loose or deteriorated mortar and replacing it with fresh mortar to restore strength, improve appearance, and reduce water ingress. For Australian homeowners, this is a practical maintenance job on aging brickwork, provided the wall
- What skill level do I need for repair mortar joints in a brick wall?
- Intermediate — Estimated time: 4–8 hours for a small wall area of around 5–10 m², plus curing time
- What are common mistakes when repair mortar joints in a brick wall?
- 1. Using mortar that is harder than the original mortar, especially on older brick homes. 2. Raking out joints too shallow; anything less than about 15 mm often leads to poor adhesion. 3. Repointing without cleaning out dust and loose material first. 4. Applying mortar to dry, hot brickwork, which causes rapid moisture loss and weak joints. 5. Smearing mortar over brick faces and leaving it to
- What tools do I need for repair mortar joints in a brick wall?
- This guide includes a comprehensive tools list. Key building & construction tools are detailed in the Tools Required section.
- What is the Australian standard for mortar mixes in repointing?
- The Australian standard for mortar mixes in repointing is generally guided by AS 3700:2018 Masonry structures, which recommends matching the existing mortar's properties. For heritage buildings, specific guidelines from state heritage bodies like Heritage NSW may apply, often favouring lime-based mortars.
- How deep should mortar joints be raked out for repointing in Australia?
- Mortar joints should be raked out to a minimum depth of 15-20 mm, or until sound mortar is reached, whichever is greater. This ensures sufficient depth for the new mortar to bond effectively and provide structural integrity, as recommended by industry best practices.
- What PPE is mandatory for repointing work in Australia?
- Mandatory PPE for repointing work in Australia includes safety glasses, P2 dust masks to protect against silica dust, hearing protection when using power tools, and gloves. According to SafeWork Australia guidelines, these measures are crucial for preventing workplace injuries and long-term health issues.
- Can I use an angle grinder for raking out mortar in Australia?
- Yes, an angle grinder fitted with a diamond mortar raking blade and a dust shroud can be used for efficient mortar removal on larger jobs, particularly in Australia. However, it requires careful handling to avoid damaging bricks and generates significant dust, necessitating appropriate respiratory protection and dust control measures.
Written by Bricko, the Building & Construction specialist at VIC.Tools.