How to repair sinking concrete

Repair sinking concrete slabs in Australia using mudjacking (slab jacking). This guide covers techniques for paths, patios, and driveways, ensuring stability and eliminating trip hazards.

Skill level
Intermediate
Time
1-2 days (depending on slab size and number of injection points)
Trade
Building & Construction
Updated
28 November 2026

Tools you will need

  • Milwaukee M18 FHM - Rotary Hammer Drill (SDS Max)
  • Makita HR2630 - Rotary Hammer Drill (SDS Plus)
  • DeWalt D25733K - Rotary Hammer Drill (SDS Max)
  • Bunnings Flexi Tub - 80L (for mixing)
  • Ozito PDM-1000 - Paddle Mixer
  • Stanley FatMax - 1200mm Spirit Level
  • Cyclone Square Mouth Shovel - Fibreglass Handle
  • Ramset ChemSet - Injection Nozzles (reusable)

G'day mate! Bricko here, ready to help you sort out that sinking concrete. It's a common problem, especially after a good downpour or if you've got some thirsty tree roots nearby. We'll get that trip hazard sorted and your concrete looking schmick again.

What is mudjacking for concrete repair in Australia?

This guide will walk you through the process of repairing sinking concrete slabs using a mudjacking (also known as slab jacking or concrete lifting) technique, which involves injecting a slurry beneath the slab to lift and stabilise it. This method is suitable for paths, patios, and driveways where the sub-base has settled, creating trip hazards. For significant structural issues or very large areas, professional engineering advice and specialised equipment may be required.

What skill level is required for mudjacking concrete repair?

Intermediate — Estimated time: 1-2 days (depending on slab size and number of injection points)

What tools are essential for mudjacking concrete slabs?

Rotary Hammer Drill: 1000W+ with a 25mm diameter, 400mm long masonry drill bit. Mixing Drill/Paddle Mixer: Heavy-duty, 1200W+ with a helical mixing paddle for thoroughly mixing the slurry. Wheelbarrow: 80-100L capacity for mixing and transporting slurry. Buckets: 20L capacity for water and measuring materials. Shovel: Square mouth for scooping and mixing. Trowel: Pointed or brick trowel for finishing injection holes. Spirit Level: 1200mm long for checking slab level. Straight Edge: 2.4m aluminium or timber straight edge for checking larger areas. Rubber Mallet: For tapping down injection nozzles. Garden Hose with Nozzle: For cleaning and adding water. Safety Glasses: AS/NZS 1337.1 compliant. Hearing Protection: AS/NZS 1270 compliant. Dust Mask/Respirator: P2 rated for concrete dust. Gloves: Heavy-duty work gloves. Knee Pads: For comfort during drilling and finishing. Measuring Tape: 8m retractable. Marking Crayon/Chalk: For marking drill points. Tarpaulin/Plastic Sheeting: For protecting surrounding areas from slurry. Pressure Washer (optional): For cleaning the slab before and after.

Materials Required

Cement: General Purpose (GP) Cement, 20kg bags. Approximately 1-2 bags per square metre of slab, depending on void size. Washed Sand: Fine to medium grade, 20kg bags or bulk. Approximately 2-3 bags per square metre. Water: Clean potable water. Non-Shrink Grout (optional): For filling injection holes if a stronger, more aesthetic finish is desired. Concrete Repair Mortar: For patching any existing cracks or spalls before lifting. Injection Nozzles/Pipes: PVC pipes (e.g., 25mm diameter, 300mm long) or purpose-made mudjacking nozzles. Quantity depends on slab size (approx. 1 per 0.5-1m²). Timber Wedges/Shims (optional): For temporary support if the slab lifts unevenly.

Safety Requirements

Personal Protective Equipment (PPE): Always wear safety glasses, hearing protection, dust mask, gloves, and sturdy footwear. Manual Handling: Cement bags and sand can be heavy. Lift with your legs, not your back. Consider using a trolley for bulk materials. Electrical Safety: Ensure all power tools are in good condition, have current test and tag, and are connected to a Residual Current Device (RCD). Dust Control: Drilling concrete creates silica dust. Wear a P2 mask and consider wetting the area slightly to suppress dust. Underground Services: Before drilling, always check for underground services (water, gas, electricity, communication lines). Contact Dial Before You Dig (1100) at least two business days prior to commencing work. Scaffolding/Ladders: Not typically required for this task, but ensure stable footing if working on uneven ground.

Step-by-Step Guide

Step 1: Assess the Slab and Plan Injection Points

Carefully inspect the sinking concrete slab. Identify the lowest points and the areas where the most lift is required. Use your spirit level and straight edge to confirm the extent of the settlement. Plan your injection points in a grid pattern, typically 500mm to 1000mm apart, starting from the lowest point and working outwards. Mark these points clearly with chalk or crayon. For a typical path, you might have two rows of holes. For a wider patio, you might need more. Avoid drilling too close to the slab edges (minimum 150mm).

Step 2: Prepare the Slab and Drill Injection Holes

Clean the slab surface thoroughly, removing any loose debris, dirt, or moss. Patch any existing cracks or spalls with concrete repair mortar and allow it to cure. Using your rotary hammer drill with the 25mm masonry bit, drill vertically through the slab at each marked injection point. The depth should be just enough to penetrate the slab thickness (typically 75-100mm for paths/patios, 100-150mm for driveways). Ensure you don't drill into any underlying services. Clear any dust or debris from the drilled holes.

Step 3: Prepare the Slurry Mix

The slurry mix is crucial for effective lifting. A common general-purpose mix ratio is 1 part cement to 2-3 parts washed sand, with enough water to create a thick, pourable consistency – like a pancake batter or thick milkshake. Start with a small batch in your wheelbarrow. Add the sand, then the cement, and mix thoroughly dry. Gradually add water while mixing with your shovel and mixing drill until you achieve the desired consistency. The mix should be fluid enough to flow under the slab but thick enough to hold its shape and not simply drain away. A structural mix (1:1.5:2.5 cement:sand:aggregate) is not typically used for mudjacking as the aggregate would block the injection holes.

Step 4: Insert Injection Nozzles and Begin Lifting

Insert your PVC pipes or purpose-made injection nozzles into the drilled holes. They should fit snugly. If they are loose, you can use a small amount of quick-set cement around the base to seal them. Begin pouring the slurry into the lowest injection point. Use a funnel if necessary to prevent spillage. As you pour, the slurry will flow into the void beneath the slab. Continuously monitor the slab with your spirit level and straight edge. You will see the slab slowly begin to lift.

Step 5: Monitor Lifting and Adjust Slurry Flow

As the slab lifts, move to adjacent injection points. The goal is to lift the slab slowly and evenly. If one side lifts too quickly, stop pouring into that hole and move to another. You may need to temporarily stop pouring into a hole and allow the slurry to spread before continuing. If the slab is stubborn, you can gently tap the slab near the injection point with a rubber mallet to encourage slurry flow. Continue this process, moving between holes and adding slurry, until the slab is level or slightly above the desired level (allowing for minor settlement). Be patient; slow and steady wins the race here.

Step 6: Final Levelling and Curing

Once the slab is level, stop injecting slurry. Allow the slurry to cure for at least 24-48 hours before placing any significant weight on the slab. During this time, the slurry will harden and provide a stable new sub-base. The curing time will depend on the weather conditions and the type of cement used. Keep the area moist during the initial curing phase to prevent rapid drying and cracking of the slurry.

Step 7: Remove Nozzles and Finish Holes

After the slurry has cured sufficiently, carefully remove the injection nozzles. You may need to gently twist or tap them. Clean out any excess slurry from the holes. Fill the holes with a non-shrink grout or a strong concrete repair mortar. Trowel the repair material flush with the existing concrete surface, matching the texture as closely as possible. Allow these patches to cure fully before use.

Common Mistakes to Avoid

1.Drilling into Services: Not checking Dial Before You Dig is a critical error that can lead to serious injury or costly repairs.
2.Too Thin/Thick Slurry: A slurry that's too thin will just drain away, while one that's too thick won't flow properly under the slab. Get the consistency right.
3.Lifting Too Fast/Unevenly: Pumping too much slurry into one point too quickly can crack the slab or cause it to lift unevenly, creating new problems.
4.Insufficient Curing Time: Walking or driving on the slab too soon after lifting can compromise the new sub-base and cause the slab to resettle.
5.Ignoring Existing Cracks: Not patching existing cracks before lifting can cause them to widen or new cracks to form under pressure.

Pro Tips

Test the Sub-Base: Before you start, you can try pouring some water into the lowest point of the void to see how quickly it drains. This gives you an idea of the void size and the permeability of the underlying soil. Use a Funnel: A large, sturdy funnel will make pouring the slurry into the injection nozzles much cleaner and more efficient. Work with a Helper: Having an extra pair of hands to mix slurry or monitor the level while you pour can make the job much easier and safer. Consider a Pump for Large Jobs: For very large areas or multiple slabs, hiring a small grout pump can save a lot of manual effort and provide more consistent pressure. This is where the economics of hire vs. purchase come in – a pump might be $100-$200/day to hire, whereas buying one is thousands.
Clean Up Immediately: Slurry is much easier to clean up when wet. Have a bucket of water and a sponge handy for spills.

Recommended Tools

1.Ozito Rotary Hammer Drill (from Bunnings): Good value for DIY, powerful enough for concrete drilling, often comes with a basic set of bits.
2.Makita Paddle Mixer (from trade suppliers): Robust and reliable for mixing heavy materials like concrete slurry, with variable speed control.
3.Nylex 80L Wheelbarrow (from hardware stores): Durable and a good size for mixing batches of slurry without being too cumbersome.
4.Stanley FatMax Anti-Vibe Hammer: Reduces fatigue and vibration when tapping down nozzles or for any light demolition.
5.Sika Concrete Repair Mortar: A trusted brand for patching and repairing concrete, ensuring a strong bond and good finish.

Frequently asked questions

What is mudjacking for concrete repair?
Mudjacking, also known as slab jacking or concrete lifting, is a technique that involves injecting a specialised slurry mixture beneath a sunken concrete slab to hydraulically lift and stabilise it. This process fills voids and compacts the sub-base, restoring the slab to its original level and eliminating trip hazards on paths, patios, and driveways.
What materials are used for mudjacking concrete?
For mudjacking, a common slurry mixture consists of Portland cement (e.g., Boral Cement GP Cement), fine sand (e.g., washed river sand), and water, often with a small amount of bentonite clay (e.g., CETCO Volclay) to improve flow and stability. The exact ratio varies but typically involves 1 part cement to 3-5 parts sand, mixed to a pourable consistency similar to a thick milkshake.
How do you prepare a concrete slab for lifting?
Before lifting, the concrete slab requires thorough preparation, including marking injection points in a grid pattern, typically 300-600mm apart, and drilling 25-30mm diameter holes through the slab using a rotary hammer drill. Ensure all underground services are located via 'Dial Before You Dig' (1100) to prevent damage during drilling.
What safety precautions are essential when mudjacking?
Essential safety precautions for mudjacking include wearing AS/NZS 1337.1 compliant safety glasses, AS/NZS 1270 compliant hearing protection, and a P2 rated dust mask (e.g., 3M 8812) to protect against concrete dust and slurry splashes. Always check for underground services using 'Dial Before You Dig' before drilling to prevent serious injury or infrastructure damage.
How do I know if my concrete slab can be repaired with mudjacking?
Your concrete slab is suitable for mudjacking if it exhibits minor to moderate sinking, has no significant structural cracks or crumbling, and the underlying cause is sub-base settlement rather than major structural failure. This method is ideal for relatively intact concrete paths, patios, and driveways where the slab itself is still in good condition.
What are common mistakes to avoid when mudjacking?
Common mistakes include failing to check 'Dial Before You Dig' for underground services, using a slurry that is too thin or too thick, and lifting the slab too quickly or unevenly. Pumping too much slurry into one point too rapidly can cause the slab to crack, while an incorrect slurry consistency will either not lift effectively or drain away without stabilising.
What is the Australian standard for eye protection on a worksite?
The Australian standard for eye protection on a worksite is AS/NZS 1337.1:2007, which specifies requirements for eye and face protectors for occupational applications. Compliance ensures protection against hazards like impact, dust, and chemical splashes, crucial for tradies drilling concrete.
How do you ensure safety when drilling into concrete in Australia?
To ensure safety when drilling into concrete in Australia, always contact 'Dial Before You Dig' (1100) to locate underground services before commencing work. Wear appropriate Personal Protective Equipment (PPE) including AS/NZS 1337.1 compliant safety glasses, AS/NZS 1270 compliant hearing protection, and a P2 rated dust mask to mitigate risks from concrete dust and noise.
What is the typical curing time for mudjacking slurry in Australia?
The typical curing time for mudjacking slurry in Australia depends on the specific cement mix and environmental conditions, but initial set can occur within 24-48 hours, with full strength achieved over 7 to 28 days. It's advisable to restrict heavy traffic for at least 3-7 days to allow adequate strength development.

Written by Bricko, the Building & Construction specialist at VIC.Tools.