How to Pour a Concrete Slab

Learn how to pour a concrete slab to Australian standards. Step-by-step trade guide covering excavation, formwork, SL72 mesh placement, pouring, and finishing.

Quick answer

Pouring a concrete slab involves preparing a compacted roadbase sub-grade, installing timber formwork, laying plastic bar chairs with SL72 or SL82 reinforcement mesh, and placing minimum 25 MPa premixed concrete. Screed, consolidate, and bull float the surface immediately. AS 2870:2011 requires maintaining a minimum slab depth of 100 mm for standard residential applications.

Skill level
Advanced
Time
1-2 days
Trade
Building & Construction
Updated
28 November 2026

Tools you will need

  • Crommelins CC70 - 70kg Petrol Plate Compactor
  • Flextool FVE-1 - Submersible Concrete Vibrator
  • Marshalltown QLT 1200mm - Magnesium Bull Float
  • Masterfinish 2400mm - Aluminium Screed Bar
  • Marshalltown 141D - 280mm x 115mm Carbon Steel Finishing Trowel
  • Ox Tools Pro - 150mm x 75mm Bronze Edger
  • Husqvarna Soff-Cut 150 - Early Entry Concrete Saw

What is involved in pouring a concrete slab?

Complete guide to pouring a concrete slab including site preparation, formwork, reinforcement, pouring, and finishing.

This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.

Skill Level: Advanced | Estimated Time: 1-2 days

What preparations are essential before pouring a concrete slab?

Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.

Read through the entire guide first so you understand the full scope of work
Gather all tools and materials listed below before you begin
Check weather conditions if working outdoors -- avoid starting if rain is forecast within your estimated time window
If working near existing structures, check for electrical cables, plumbing, and gas lines before cutting or drilling
Ensure you have adequate lighting in your work area
Wear appropriate PPE: safety glasses, hearing protection, gloves, and steel-cap boots where required

What tools are required to pour a concrete slab?

Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.

Concrete mixer or ready-mix delivery -- Essential for this project. Check your existing kit before purchasing.
Screeding board -- Essential for this project. Check your existing kit before purchasing.
Bull float or magnesium float -- Essential for this project. Check your existing kit before purchasing.
Steel trowel -- Essential for this project. Check your existing kit before purchasing.
Edging tool -- Essential for this project. Check your existing kit before purchasing.
Vibrator (optional) -- Essential for this project. Check your existing kit before purchasing.
Spirit level -- Essential for this project. Check your existing kit before purchasing.
String line -- Essential for this project. Check your existing kit before purchasing.

Step-by-Step Guide

Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.

Step 1: Excavate to required depth: 100mm slab + 100mm compacted base

This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.

Step 2: Compact subgrade and lay 100mm of compacted road base

With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.

Step 3: Build timber formwork to required shape and check level/falls

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 4: Install steel reinforcement mesh on chairs at mid-depth

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 5: Install control joints at maximum 3m centres

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 6: Order ready-mix concrete: 25MPa for paths, 32MPa for driveways

You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.

Step 7: Pour concrete and level with screeding board

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 8: Use bull float for initial smoothing

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 9: Wait for bleed water to disappear then finish with steel trowel

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 10: Cut control joints within 24 hours

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 11: Apply curing compound or keep wet for 7 days

This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.

Safety Notes

Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.

Wet concrete is caustic - wear rubber boots, gloves, long sleeves -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Concrete is heavy - arrange adequate labour -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Start early in hot weather to avoid rapid drying -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Reinforcement mesh edges are sharp -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.

Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.

Pro Tips from the Trade

These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.

Tip 1: Order 10% extra concrete for waste and uneven excavation. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 2: Pour in one continuous operation. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 3: Steel trowel finishing should start when you can stand without sinking. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 4: Exposed aggregate: spray retarder and wash off top layer next day. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.

Common Mistakes to Avoid

Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.

Mistake 1: Not compacting the base adequately causing cracking. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 2: Leaving reinforcement mesh on the ground instead of on chairs. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 3: Over-trowelling causing dusting. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 4: Not installing control joints resulting in random cracking. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.

Materials List

Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.

Ready-mix concrete (25-32MPa) -- Confirm grade and specifications match the requirements described in the steps above.
Road base for sub-base -- Confirm grade and specifications match the requirements described in the steps above.
Reinforcement mesh SL72 or SL82 -- Confirm grade and specifications match the requirements described in the steps above.
Bar chairs for mesh support -- Confirm grade and specifications match the requirements described in the steps above.
Formwork timber and stakes -- Confirm grade and specifications match the requirements described in the steps above.
Curing compound -- Confirm grade and specifications match the requirements described in the steps above.

When to Call a Professional

While this guide covers a advanced-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:

If you encounter structural elements that you are not confident assessing
If the project requires council permits or engineering certification
If you discover hidden hazards such as asbestos, faulty wiring, or damaged plumbing
If the scope grows beyond what you originally planned

Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.

Frequently asked questions

What is the minimum thickness for a residential concrete slab in Australia?
Under AS 2870:2011, the minimum thickness for a standard residential concrete slab on ground is typically 100 mm for footpaths, sheds, and patios. Driveways and structural house slabs generally require a minimum thickness of 100 mm to 125 mm using 25 to 32 MPa concrete, depending on soil classification and expected vehicle loads.
How much extra concrete should I order for a slab?
Always order an additional 10 to 15 percent of concrete beyond your measured cubic volume to account for site irregularities. Sub-base variations, ground deflection, formwork bowing, and spillage during the pour routinely consume extra volume. Running short mid-pour creates cold joints, compromising the structural integrity of your slab.
What Australian Standard governs concrete slabs and footings?
Residential concrete slabs in Australia are governed by AS 2870:2011 (Residential Slabs and Footings), which dictates site classification, slab thickness, and steel reinforcement requirements. General concrete supply and structural procedures must also comply with AS 1379 for concrete manufacturing and AS 3600 for concrete structures to ensure engineering compliance.
How long after pouring a slab should I cut control joints?
Control joints should be cut between 12 and 24 hours after pouring, once the concrete is hard enough to resist surface ravelling. Saw-cut joints must be one-quarter to one-third of the total slab depth and spaced at intervals no greater than 24 to 30 times the slab thickness.
What reinforcement mesh do I need for a 100mm shed slab?
A standard 100 mm shed or patio slab typically requires SL72 steel reinforcing mesh elevated on 50/65 mm plastic bar chairs spaced every metre. The mesh must sit in the top half of the slab, with a minimum of 30 mm concrete cover to comply with Australian durability standards.
How long does a concrete slab take to cure before building on it?
A concrete slab reaches approximately 70 percent of its structural strength at 7 days and full design strength at 28 days. While foot traffic is permissible after 24 to 48 hours, structural framing, heavy vehicle traffic, and brickwork should not commence until at least 7 to 14 days of curing.

Written by Bricko, the Building & Construction specialist at VIC.Tools.