Skip to main content

How to Build a Ground-Level Deck

Complete guide to building a ground-level timber deck with bearer and joist construction, including site preparation, frame assembly, and board fixing.

Skill level
Intermediate
Time
2-3 days
Trade
Carpentry & Joinery
Updated
28 November 2026

Tools you will need

  • Circular saw
  • Impact driver
  • Spirit level (1200mm)
  • String line and pegs
  • Speed square
  • Tape measure (8m)
  • Chalk line

What is a ground-level deck and why build one?

Complete guide to building a ground-level timber deck with bearer and joist construction, including site preparation, frame assembly, and board fixing.

This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.

Skill Level: Intermediate | Estimated Time: 2-3 days

How do you prepare for building a ground-level deck in Australia?

Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.

Read through the entire guide first so you understand the full scope of work
Gather all tools and materials listed below before you begin
Check weather conditions if working outdoors -- avoid starting if rain is forecast within your estimated time window
If working near existing structures, check for electrical cables, plumbing, and gas lines before cutting or drilling
Ensure you have adequate lighting in your work area
Wear appropriate PPE: safety glasses, hearing protection, gloves, and steel-cap boots where required

What essential tools are needed for building a ground-level deck?

Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.

Circular saw -- Essential for this project. Check your existing kit before purchasing.
Impact driver -- Essential for this project. Check your existing kit before purchasing.
Spirit level (1200mm) -- Essential for this project. Check your existing kit before purchasing.
String line and pegs -- Essential for this project. Check your existing kit before purchasing.
Speed square -- Essential for this project. Check your existing kit before purchasing.
Tape measure (8m) -- Essential for this project. Check your existing kit before purchasing.
Chalk line -- Essential for this project. Check your existing kit before purchasing.

Step-by-Step Guide

Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.

Step 1: Mark out the deck area and check for services (call 1100)

This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.

Step 2: Prepare the ground with weed mat and drainage gravel

With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.

Step 3: Set concrete pier footings at 1200mm centres

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 4: Install bearers (140x45 treated pine or merbau) on stirrups

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 5: Attach joists at 450mm centres with joist hangers

You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.

Step 6: Fix decking boards with 8g x 50mm stainless screws

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 7: Leave 3-5mm expansion gaps between boards

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 8: Sand edges and apply decking oil or stain

This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.

Safety Notes

Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.

Wear safety glasses, gloves, and hearing protection when cutting -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Check for underground services before digging (Dial Before You Dig 1100) -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Use treated timber rated H3 minimum for ground contact -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.

Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.

Pro Tips from the Trade

These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.

Tip 1: Pre-drill hardwood to prevent splitting. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 2: Stagger board joins across different joists for strength. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 3: Start laying from the house wall outward for a clean edge. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.

Common Mistakes to Avoid

Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.

Mistake 1: Not allowing adequate drainage under the deck. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 2: Using untreated timber in ground-contact situations. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 3: Spacing joists too far apart causing board flex. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.

Materials List

Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.

Treated pine bearers 140x45mm -- Confirm grade and specifications match the requirements described in the steps above.
Treated pine joists 90x45mm -- Confirm grade and specifications match the requirements described in the steps above.
Merbau or spotted gum decking 90x19mm -- Confirm grade and specifications match the requirements described in the steps above.
Galvanised stirrups and joist hangers -- Confirm grade and specifications match the requirements described in the steps above.
Stainless steel decking screws 8g x 50mm -- Confirm grade and specifications match the requirements described in the steps above.
Weed mat and 20mm drainage gravel -- Confirm grade and specifications match the requirements described in the steps above.

When to Call a Professional

While this guide covers a intermediate-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:

If you encounter structural elements that you are not confident assessing
If the project requires council permits or engineering certification
If you discover hidden hazards such as asbestos, faulty wiring, or damaged plumbing
If the scope grows beyond what you originally planned

Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.

Frequently asked questions

What tools do I need for build a ground-level deck?
You will need: Circular saw, Impact driver, Spirit level (1200mm), String line and pegs, Speed square, Tape measure (8m), Chalk line.
How long does it take to build a ground-level deck?
Expect approximately 2-3 days for this project.
What safety precautions should I take?
Wear safety glasses, gloves, and hearing protection when cutting. Check for underground services before digging (Dial Before You Dig 1100). Use treated timber rated H3 minimum for ground contact.
What are the best tips for success?
Pre-drill hardwood to prevent splitting. Stagger board joins across different joists for strength. Start laying from the house wall outward for a clean edge.
What mistakes should I avoid?
Not allowing adequate drainage under the deck. Using untreated timber in ground-contact situations. Spacing joists too far apart causing board flex.
What is the Australian standard for timber treatment in ground-level decks?
The Australian standard for timber treatment in ground-level decks is AS 1604.1:2012. This standard specifies that timber in ground contact must be H3 treated or higher to resist fungal decay and insect attack. For bearers and joists directly on the ground, H4 or H5 treatment is often recommended for longevity.
Do I need council approval for a ground-level deck in Australia?
Generally, small ground-level decks (under 1 metre high and not roofed) may not require council approval in many Australian jurisdictions, but this varies by state and local council. Always check with your local council's planning department or a building certifier before commencing work to ensure compliance with the National Construction Code (NCC) and local planning schemes.
What is the recommended spacing for deck joists in Australia?
The recommended spacing for deck joists in Australia typically ranges from 450mm to 600mm, depending on the decking material and its thickness, as well as the design load. According to AS/NZS 1170.1:2002, this spacing ensures the deck can safely support its intended load without excessive deflection. Always refer to timber span tables for precise calculations.

Written by Chippy, the Carpentry & Joinery specialist at VIC.Tools.