How to install laminate flooring
Laminate flooring is one of the more achievable DIY flooring projects for Australian homeowners, provided the subfloor is flat, dry, and properly prepared. The key to a professional result is accurate measuring, careful expansion gaps, and following the board layout and locking system recommended by
- Skill level
- Intermediate
- Time
- 1 day for a small room or 1.5 to 2 days for a typical bedroom/living area
- Trade
- Carpentry & Joinery
- Updated
- 28 November 2026
Tools you will need
- Tape measure
- Laser level or 2 m straightedge
- Pencil and chalk line
- Combination square or speed square
- Laminate guillotine or drop saw/mitre saw with fine
- Jigsaw
- Multi
- Rubber mallet
- Tapping block suited to laminate click
- Pull bar for final rows
🪚 Laminate Flooring Installation Trade Guide for Australian DIY Renovators
What is involved in installing laminate flooring in Australia?
Laminate flooring is one of the more achievable DIY flooring projects for Australian homeowners, provided the subfloor is flat, dry, and properly prepared. The key to a professional result is accurate measuring, careful expansion gaps, and following the board layout and locking system recommended by the manufacturer.
This guide covers installation over common Australian subfloors including concrete slabs and timber sheet floors, with practical trade advice to help you avoid lipping, movement, and premature wear.
What skill level is required for laminate flooring installation?
Intermediate — Estimated time: 1 day for a small room or 1.5 to 2 days for a typical bedroom/living area
What tools are essential for laminate flooring installation?
What materials are needed for a laminate flooring project?
Safety Requirements
Step-by-Step Guide
Step 1: 1️⃣ Measure the Room and Plan the Layout
Measure the room length and width in mm, then calculate the total area in m². Add the appropriate wastage allowance before purchasing flooring.
Plan the direction of the boards before you start. In most rooms, laminate looks best laid parallel to the longest wall or in the direction of the main natural light source.
Check the width of the final row by dry calculating the board layout. If the last row will finish too narrow, rip the first row down so the first and last rows are balanced. A final row narrower than about 50 mm can look poor and be harder to install.
💡 A balanced layout is one of the first things that separates a trade-quality job from a rushed DIY install.
Step 2: 2️⃣ Acclimatise the Flooring
Bring the unopened laminate packs into the room and leave them flat for at least 48 hours, or as specified by the manufacturer.
Keep the room within normal living conditions during acclimatisation and installation. Avoid storing packs in garages, damp areas, or direct sun.
This step helps the boards stabilise to site conditions and reduces movement issues after installation.
Step 3: 3️⃣ Remove Existing Floor Coverings and Trims
Take up carpet, vinyl, or old floating floor materials. Remove scotia, quadrant, and, if required, skirting boards carefully so they can be reused or replaced.
Check whether doors will need trimming once the new floor and underlay are in place. It is far easier to deal with door clearances before the full floor is laid.
If you are keeping existing skirtings, plan to finish the perimeter with 12x18 mm or 18x18 mm scotia.
Step 4: 4️⃣ Inspect and Prepare the Subfloor
The subfloor must be clean, dry, structurally sound, and flat to the laminate manufacturer’s tolerance. In practical terms, most laminate systems require no more than about 3 mm variation over 1 m or similar, but always confirm with the product data sheet.
For concrete slabs:
For timber sheet subfloors:
If installing over timber framing, ensure the floor feels solid and there is no excessive bounce. Framing and sheet flooring should be suitable for the load and span conditions in line with AS 1684 principles.
💡 Most laminate failures come back to poor subfloor prep, not the boards themselves.
Step 5: 5️⃣ Install Moisture Barrier and Underlay
For concrete slabs, roll out a 200 micron polyethylene moisture barrier if the underlay does not already include one. Overlap joints as directed by the manufacturer, commonly around 200 mm, and tape them.
Then install the underlay in the same direction you intend to lay the boards, or as recommended by the supplier. Butt the underlay edges neatly without overlapping unless the product specifically requires it.
For timber subfloors, use the underlay type approved for laminate floating floors. In upper-level units or apartments, an acoustic underlay may be required.
Step 6: 6️⃣ Undercut Door Jambs and Test Clearance
Use an offcut of underlay and laminate as a height guide, then undercut door jambs and architraves with a multi-tool or undercut saw.
This allows the laminate to slide neatly underneath for a cleaner finish and better expansion movement. It also avoids awkward scribes around trims.
Vacuum all dust and debris before laying the first row.
Step 7: 7️⃣ Lay the First Row Straight
Start along the longest, straightest wall. Place spacers around the perimeter to maintain an expansion gap, typically 10 mm to 12 mm, or as specified by the manufacturer.
Lay the first row with the tongue or groove side oriented according to the locking system instructions. Keep the row perfectly straight, because every row after it will follow this line.
If the starting wall is not straight, scribe and trim the first row to suit while still maintaining the required expansion gap.
💡 Take extra time here. If the first row wanders, the entire room will show it.
Step 8: 8️⃣ Continue the Main Field Installation
Stagger board end joints according to the manufacturer’s minimum offset, commonly 300 mm or more. Avoid repeating patterns that make the floor look artificial.
Click the long edge in first, then engage the short edge using the method specified for your flooring system. Some products angle-lock, while others require tapping with a block.
Use offcuts efficiently, but do not create rows with very short starter pieces unless they still meet the minimum length requirement. Keep checking every few rows that the floor remains square and the joints are fully closed.
Step 9: 9️⃣ Cut Around Obstacles and Doorways
Measure carefully around door frames, cupboards, vents, islands, or nib walls. Transfer measurements accurately and cut with a jigsaw or fine-tooth saw.
At doorways, leave the required expansion gap and install the correct transition trim if the laminate meets another floor finish or a separate room. In larger areas, some laminate systems require control or transition breaks at nominated lengths and widths.
Always check the manufacturer’s maximum continuous run limits before laying through multiple rooms without a break.
Step 10: 🔟 Install the Final Row
Measure from the face of the second-last row to the wall in several positions, then deduct the expansion gap. Rip the final row to width as needed.
Use a pull bar to engage the final boards where there is not enough room for a tapping block. Take care not to damage the board edge or the wall lining.
Double-check that the final row is fully locked along its full length.
Step 11: 1️⃣1️⃣ Fit Trims, Scotia, and Transitions
Remove the spacers once the floor is complete. Install skirting boards or scotia to cover the perimeter expansion gap.
Important: fix trims to the wall or skirting, not down through the laminate flooring. Laminate is a floating system and must be free to expand and contract.
Install transition trims at doorways, exposed ends, or where the floor meets tiles, carpet, or lower floor finishes.
Step 12: 1️⃣2️⃣ Clean, Inspect, and Protect the Finished Floor
Vacuum and dry-mop the floor. Do not wet-mop a new laminate floor unless the manufacturer specifically allows it.
Inspect all joints for gaps, chipped edges, or raised boards. Fit felt pads to furniture before moving items back in, and avoid dragging appliances or lounges across the surface.
Leave any manufacturer-required curing or settling period before heavy traffic, if applicable.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What is involved in install laminate flooring?
- Laminate flooring is one of the more achievable DIY flooring projects for Australian homeowners, provided the subfloor is flat, dry, and properly prepared. The key to a professional result is accurate measuring, careful expansion gaps, and following the board layout and locking system recommended by
- What skill level do I need for install laminate flooring?
- Intermediate — Estimated time: 1 day for a small room or 1.5 to 2 days for a typical bedroom/living area
- What are common mistakes when install laminate flooring?
- 1. Skipping subfloor preparation — even premium laminate will fail or sound poor over an uneven or damp base. 2. Forgetting the expansion gap — tight installation against walls, kitchen panels, or door frames often causes tenting or peaking. 3. Fixing trims through the floor — this locks the floating floor and prevents normal movement. 4. Using the wrong underlay — unsuitable under
- What tools do I need for install laminate flooring?
- This guide includes a comprehensive tools list. Key carpentry & joinery tools are detailed in the Tools Required section.
- What is the Australian standard for subfloor preparation before laying laminate?
- The Australian standard for subfloor preparation before laying laminate is AS 1884-2021 'Floor coverings – Resilient and textile – Laying and maintenance practices'. This standard specifies requirements for flatness, moisture content, and cleanliness to ensure optimal performance and longevity of the flooring. Adhering to this standard prevents common issues like cupping or delamination.
- How much expansion gap is required for laminate flooring in Australia?
- An expansion gap of 10 mm to 12 mm is typically required around the perimeter of the room and against any fixed objects like door frames or kitchen islands. This gap, as recommended by most Australian laminate manufacturers, accommodates the natural expansion and contraction of the flooring due to temperature and humidity changes, preventing tenting or buckling.
- What type of underlay should be used for laminate flooring on a concrete slab in Australia?
- For concrete slabs in Australia, a combination underlay with an integrated 200 micron polyethylene moisture barrier is essential. If the underlay does not include this, a separate 200 micron polyethylene sheet must be laid first, as specified by AS 1884-2021, to prevent moisture migration from the slab affecting the laminate.
- Are there specific safety regulations for using power tools during laminate installation in Australia?
- Yes, SafeWork Australia guidelines mandate the use of appropriate Personal Protective Equipment (PPE) such as safety glasses, hearing protection, and dust masks when operating power tools like drop saws or jigsaws. All electrical tools must be tested and tagged according to AS/NZS 3760:2022 standards for in-service safety inspection and testing of electrical equipment.
Written by Chippy, the Carpentry & Joinery specialist at VIC.Tools.