How to install timber architraves around a door

Installing timber architraves around a door is a standard finishing carpentry task that requires accurate set-outs, clean mitres and consistent reveals to achieve a professional result. On new builds, fit-outs and renovation work, the quality of architrave installation has a direct impact on the vis

Skill level
Intermediate
Time
1.5 to 3 hours per door
Trade
Carpentry & Joinery
Updated
28 November 2026

Tools you will need

  • Compound mitre saw with fine
  • Tape measure 5 m
  • Combination square and sliding bevel
  • Sharp pencil and marking knife
  • Spirit level 1200 mm minimum
  • Block plane or low
  • Coping saw for internal profile refinement where required
  • Caulking gun
  • Hammer and nail punch for hand
  • Utility knife

🪚 Installing Timber Architraves Around a Door — Professional Trade Guide

What is involved in installing timber architraves around a door?

Installing timber architraves around a door is a standard finishing carpentry task that requires accurate set-outs, clean mitres and consistent reveals to achieve a professional result. On new builds, fit-outs and renovation work, the quality of architrave installation has a direct impact on the visual finish, particularly where walls are out of plumb or jambs are not perfectly flush.

This guide covers trade-standard methods for measuring, scribing, cutting and fixing timber architraves around a single hinged door set, with reference to Australian good practice and relevant provisions under AS 1684 Residential Timber-Framed Construction where framing alignment affects the installation.

What skill level is required to install timber architraves?

Intermediate — Estimated time: 1.5 to 3 hours per door

What tools are essential for architrave installation in Australia?

Compound mitre saw with fine-tooth blade suitable for finished timber mouldings
23-gauge pin nailer or 15/16-gauge finish nailer with compressor
Tape measure 5 m
Combination square and sliding bevel
Sharp pencil and marking knife
Spirit level 1200 mm minimum
Block plane or low-angle trimming plane
Coping saw for internal profile refinement where required
Caulking gun
Hammer and nail punch for hand-fixing
Utility knife
Multi-tool or chisel for trimming proud plaster or jamb packers
Sanding block or random orbital sander with 120 grit to 180 grit

What materials are needed for a standard architrave installation?

Timber architrave profile to suit project specification, typically:
42 x 18 mm
66 x 18 mm
67 x 12 mm
92 x 18 mm
Matching pre-primed pine, MDF architrave, clear pine, tasmanian oak, or nominated hardwood species
Door jamb installed and fixed plumb, with lining thickness matched to wall finish
Fixing nails:
32 mm to 50 mm brads/pins for architrave to jamb
50 mm to 64 mm finish nails where fixing through to stud/blocking is required
Construction adhesive or PVA trim adhesive where specified
Acrylic gap sealant / paintable no-more-gaps type product
Timber filler colour-matched where clear finished
Undercoat/primer and topcoat if site-finished
Packers/shims for minor wall irregularities
Back-blocking or nogging if the opening lacks fixing support

Safety Requirements

Wear PPE including safety glasses, hearing protection and dust mask/P2 respirator when cutting, sanding or trimming MDF/timber products.
Use safe handling procedures for powered mitre saws, nail guns and compressors. Follow manufacturer instructions and site SWMS requirements.
Confirm door openings are stable and jambs are securely fixed before applying pressure during fitting.
Check for concealed services before trimming wall linings or nailing near switch locations.
Comply with applicable state and territory WHS requirements and site induction procedures.
Where surrounding framing has been modified, ensure work aligns with engineering details and AS 1684 framing tolerances and fixing expectations.

Step-by-Step Guide

Step 1: Inspect the Opening and Confirm Jamb Set-Out

Start by checking the door jamb is properly installed, plumb and adequately fixed. Use a 1200 mm spirit level on both jamb legs and the head. Check the jamb face sits either flush with the finished plasterboard or can be brought flush with minimal trimming or packing.

Measure for any wall bow or proud plaster edges. If the wall sheeting sits proud of the jamb, plane the rear edge of the architrave, undercut the plaster slightly with a multi-tool, or use a controlled bead of sealant only as a last resort. If the jamb is proud of the wall, trim the jamb back carefully or plant out the wall side where practical.

💡 A clean architrave job starts with the lining. Do not try to force mouldings to hide a badly set jamb without first correcting the substrate.

Step 2: Mark the Reveal Lines

Set out a consistent reveal on the jamb. Standard trade practice is typically 5 mm from the inside edge of the jamb to the inner edge of the architrave, unless project details nominate otherwise.

Using a combination square, mark the reveal along both vertical jamb legs and across the head. Extend the lines clearly enough to remain visible during fitting. Confirm all three sides are visually consistent and parallel.

Where the jamb is not perfectly square, work off the reveal rather than the wall edge. The reveal is what the eye picks up first once the door is operational.

Step 3: Measure the Head and Legs

Measure each piece individually. Do not assume both legs are identical, particularly in renovation work or where floor finishes vary.

For the head piece, measure from reveal line to reveal line across the top jamb. Then add the required horn length based on the profile width and mitre arrangement. For standard 45° mitres, the overall length is taken to the long points.

For the legs, measure vertically from the underside of the head mitre intersection down to the finished floor level or nominated stopping point. If skirtings are already installed, decide whether the architrave butts onto the skirting, dies into it, or is undercut around sequencing requirements.

💡 On repaint and reno work, dry-fit one leg first and physically mark the mating mitre rather than relying purely on tape measurements.

Step 4: Cut the Mitres

Cut the head and both leg pieces on a compound mitre saw with a fine-finish blade to minimise breakout. Standard external corners at the top of the architrave are cut at 45°, but always verify with a bevel if the jamb or wall is out of square.

Cut the top piece first, then one leg, and offer them up dry. If the mitres open at the face or back, adjust the saw angle slightly to suit site conditions. In older buildings, a true 45° is often not exact.

For stained or clear-finished timber, cut slightly proud and trim to final fit. For pre-primed painted work, minor adjustments can be made with a block plane and sanding block before fixing.

💡 Keep the profiled face tight to the saw fence and support long mouldings properly. Any twist during cutting will show immediately in the mitre line.

Step 5: Dry-Fit and Fine-Tune

Dry-fit all three pieces before nailing. Position the head piece to the reveal line, then bring in each leg to check mitre closure and wall contact.

Inspect:

Mitre face alignment
Back edge contact to wall
Consistent reveal
Bottom leg termination at floor or skirting
Any spring in the timber that may require extra fixing

If a wall is bellied or hollow, lightly plane the rear arris or relieve the back edge so the face remains seated properly. Avoid pulling architraves hard to an uneven wall if it will open the mitre.

Where the profile is complex and the mitre is slightly irregular, refine the joint using a coping saw, file or sharp chisel.

Step 6: Fix the Head Piece

Fix the top architrave first. Align it exactly to the reveal marks and pin or nail it off lightly to the jamb, then secure outer edges back to framing or lining support where available.

Typical fixing pattern:

One fixing into the jamb at each end and one or two through the centre depending on width
Outer edge fixings into studs, trimmers or backing at approximately 450 mm to 600 mm centres as required

For painted work, a 23-gauge pin nailer gives a cleaner finish, but where the architrave has spring or the wall is uneven, use 15/16-gauge finish nails for better holding power.

Apply adhesive sparingly if specified, but do not rely on adhesive alone where mechanical fixing is required.

Step 7: Fix the Side Legs

Install the hinge-side leg first, then the strike-side leg. Bring each mitre tightly into the head and check the reveal line all the way down before fixing off.

Place initial fixings near the mitre to hold the joint closed, then continue down the leg. A typical method is:

Fix inner edge to jamb first
Recheck reveal
Fix outer edge back to stud or wall support
Add additional fixings at 450 mm to 600 mm centres

If the bottom of a leg wants to kick out due to floor irregularity or wall bow, scribe the underside slightly or relieve the rear edge rather than forcing the whole piece out of line.

💡 On clear-finished hardwood architraves, pre-drill near mitre ends if hand-fixing to reduce the risk of splitting.

Step 8: Secure and Tighten the Mitres

Once all pieces are fixed, inspect the mitre joints for flushness and closure. If needed, add a discreet fixing close to the mitre using pins angled across the joint to help lock it together.

For premium painted finish work, some trades apply a small amount of PVA or mitre adhesive to the mitres before assembly. Wipe any squeeze-out immediately. On natural timber, use only appropriate glue and avoid face contamination that may affect stain uptake.

Where movement is likely due to seasonal change, ensure the architrave is well fixed to stable backing and not left spanning hollows unsupported.

Step 9: Fill, Caulk and Finish

Punch and fill nail holes if using hand-driven or heavier finish nails. Apply paintable acrylic sealant sparingly to the wall edge and jamb edge only where required. Do not over-caulk; excessive sealant telegraphs poor set-out and looks substandard under paint.

For stained or clear-coated timber, use a matching filler and avoid visible caulk lines. Sand all filled areas smooth with 120 grit then 180 grit as needed. Prime any bare cut ends, filled sections or site-worked areas before top coating.

If the architrave is pre-finished, protect the face during installation and keep adhesive and filler off the surface.

Step 10: Final Quality Check

Carry out a final inspection from both close range and standing-back viewing distance. Check:

Mitres are tight and aligned
Reveals are even
Bottoms are level relative to floor finish
No visible damage to arrises or profile
Nail holes are properly finished
Wall junctions are neat without excessive sealant

Operate the door to confirm hardware clearance and visual balance of the finished trim around the opening.

What are common mistakes to avoid when installing architraves? to Avoid

1.Inconsistent reveals due to poor marking or fixing one leg before confirming the full set-out.
2.Assuming all cuts are true 45°, particularly in renovation work where jamb heads are often out of square.
3.Over-fixing or poorly placed nails that split slender architraves or distort the profile.
4.Using caulk to hide poor fit-up, especially at mitres and wall junctions.
5.Ignoring proud plaster or bowed walls, which results in architraves rocking or mitres opening after fixing.

Pro Tips

1.Cut and fit the head first, then measure each leg to suit actual site conditions rather than nominal jamb height.
2.Use a 23-gauge pinner for delicate profiles and a 15/16-gauge nailer where extra holding power is needed against uneven walls.
3.Back-prime or seal cut ends on solid timber architraves in damp-prone areas to reduce moisture uptake and movement.
4.Keep mitres slightly hollow-backed on painted work if needed so the visible front arris closes tightly.
5.Check for solid fixing behind the outer edge. If there is no stud or backing, install support before final trim-out for a more durable finish.

Recommended Tools

Makita 305 mm Compound Mitre Saw — accurate repeat mitre cuts on wider architrave profiles
Paslode 16-gauge Finish Nailer — strong fixing where jambs or walls need more holding pressure
Bostitch 23-gauge Pin Nailer — minimal surface marking on fine mouldings
Stanley 1200 mm Spirit Level — reliable reveal and jamb alignment checks
Veritas Low-Angle Block Plane — precise trimming of mitres and rear arrises

💡 If you are upgrading nailers, saws or dust extraction for trim-out work, higher-value tool purchases may be worth reviewing against the EOFY instant asset write-off arrangements with your accountant, particularly for tools exceeding $300.

Frequently asked questions

What is involved in install timber architraves around a door?
Installing timber architraves around a door is a standard finishing carpentry task that requires accurate set-outs, clean mitres and consistent reveals to achieve a professional result. On new builds, fit-outs and renovation work, the quality of architrave installation has a direct impact on the vis
What skill level do I need for install timber architraves around a door?
Intermediate — Estimated time: 1.5 to 3 hours per door
What are common mistakes when install timber architraves around a door?
1. Inconsistent reveals due to poor marking or fixing one leg before confirming the full set-out. 2. Assuming all cuts are true 45°, particularly in renovation work where jamb heads are often out of square. 3. Over-fixing or poorly placed nails that split slender architraves or distort the profile. 4. Using caulk to hide poor fit-up, especially at mitres and wall junctions. 5. Ig
What tools do I need for install timber architraves around a door?
This guide includes a comprehensive tools list. Key carpentry & joinery tools are detailed in the Tools Required section.
What is the Australian standard for timber framing that affects architrave installation?
The primary Australian standard for timber framing that influences architrave installation is AS 1684 Residential Timber-Framed Construction. This standard outlines requirements for framing alignment and tolerances, which directly impact how plumb and square door jambs are, thus affecting the final fit of architraves.
How much reveal should be left when installing architraves in Australia?
A consistent reveal of 5mm to 10mm is standard practice for architrave installation in Australia. This gap allows for minor movement, accommodates slight imperfections in the jamb, and creates a clean visual line. Maintaining this reveal consistently around the entire door frame is crucial for a professional finish.
What is the best type of nailer for architrave installation?
For architrave installation, a 23-gauge pin nailer or a 15/16-gauge finish nailer is generally recommended. Pin nailers create minimal holes, ideal for pre-primed or painted architraves, while finish nailers offer stronger holding power for heavier profiles or hardwood. Always use appropriate nail lengths to penetrate both architrave and jamb securely.

Written by Chippy, the Carpentry & Joinery specialist at VIC.Tools.