Skip to main content

How to install window reveals and timber architraves

Install window reveals and timber architraves correctly. Master set-out, packing, 5mm margins, and tight 45-degree mitres to meet AS 1684 standards.

Quick answer

Window reveals and timber architraves must be packed square and plumb, sitting 1 mm to 2 mm proud of the plasterboard lining. Architraves are then scribed with a 4 mm to 6 mm reveal margin, fixed with 16-gauge brads into the studs, and joined with glued 45-degree mitres under AS 1684 tolerances.

Skill level
Intermediate
Time
2–4 hours per window depending on reveal type, wall condition, and finish standard
Trade
Carpentry & Joinery
Updated
28 November 2026

Tools you will need

  • Makita LS1019L - 255mm Slide Compound Mitre Saw
  • Milwaukee M18 FN16GA - 16-Gauge Angled Finish Nailer
  • Stabila R-Beam 1200mm - Spirit Level
  • Empire E250 - 300mm Combination Square
  • Stanley 1-12-060 - Low Angle Block Plane
  • Paslode Duo-Fast - 3-Piece Hand Nail Punch Set
  • Bostik HG3 - Heavy Duty Caulking Gun

What is involved in installing window reveals and timber architraves in Australia?

🪚 Installing window reveals and timber architraves is a standard fit-off task that needs accurate set-out, clean fixing, and tight mitres to achieve a professional finish. On Australian new builds and renovation work, the process generally involves checking the window frame and wall lining, packing and fixing the reveal square and plumb, then scribing, cutting and installing architraves to suit the jamb projection and finished wall surface.

Done properly, reveals provide the correct trim-out for plasterboard or masonry openings and create a straight, stable fixing ground for the architraves. The work should align with manufacturer installation details, NCC requirements, and relevant structural framing tolerances under AS 1684 Residential Timber-Framed Construction where applicable.

What skill level is required for installing window reveals and timber architraves?

Intermediate — Estimated time: 2–4 hours per window depending on reveal type, wall condition, and finish standard

What tools are essential for installing window reveals and timber architraves?

Tape measure 5 m or 8 m with clear mm graduations
Combination square and sliding bevel for checking jamb projection and mitres
Spirit level 1200 mm and/or laser level
Pencil and fine marker for set-out
Compound mitre saw with fine-tooth timber blade
Table saw or track saw for ripping reveal stock where required
Block plane or low-angle hand plane for trimming proud edges
18-gauge brad nailer or 16-gauge finish nailer
Drill/driver with countersink bits if hand-fixing or screwing reveals
Nail punch for hand-driven finishing nails
Clamps for holding reveals during assembly or fixing
Multi-tool or sharp chisel for trimming plaster or lining irregularities
Caulking gun for gap sealer or paintable acrylic
Random orbital sander with 120 grit and 180 grit abrasives

What materials are needed for window reveal and architrave installation?

Timber reveal stock in suitable species and profile, commonly DAR pine, primed finger-jointed pine, or clear hardwood where specified
Typical reveal/jamb sizes:
66x18 mm
92x18 mm
138x18 mm
140x30 mm for deeper wall builds or custom joinery finish
Timber architraves to project specification, common widths:
42x12 mm
66x18 mm
92x18 mm
Architrave profiles as specified:
Single bevel
Colonial
Lambs tongue
Victorian
Square-set style flat board
Packer strips/shims for plumbing and squaring reveals
Construction adhesive or PVA where required for assembled reveal boxes
32 mm to 50 mm brads for architraves depending on substrate thickness
50 mm to 65 mm finish nails for fixing reveals into studs/trimmers where required
8g timber screws if screw-fixing reveal sets
Wood filler or two-part filler for nail holes and minor defects
Paintable acrylic gap sealant
Primer/undercoat and finishing paint, stain or clear sealer as specified
Masking tape and surface protection

Safety Requirements

Wear AS/NZS-approved PPE including safety glasses, hearing protection, and P2 dust mask when cutting or sanding timber.
Use push sticks, guards and safe cutting procedures on mitre saws and table saws.
Confirm wall openings are clear of concealed services before trimming or fixing near framing members.
For renovation work, assess for lead paint, silica dust, and asbestos-containing materials before disturbance in accordance with state WHS requirements.
Use compliant access equipment when working above shoulder height.
Follow site SWMS requirements where applicable and manufacturer instructions for nailers, adhesives and sealants.
In bushfire, coastal or high-moisture areas, confirm the specified timber species, treatment level and finish system are suitable for the exposure conditions.
State and territory WHS rules apply; ensure pneumatic tools, electrical leads and dust extraction comply with site requirements.

Step-by-Step Guide

Step 1: Check the opening and confirm the trim-out dimensions

1️⃣ Inspect the window frame and wall condition

Check the installed window for square, plumb and level before starting any trim-out. Measure diagonals if needed and confirm the window frame has been installed within acceptable tolerances. If the frame is significantly out, the reveal and architrave will only disguise so much, so rectify upstream where possible.

Measure the wall thickness from the window frame to the finished face of plasterboard, fibre cement lining or render line. This determines the required reveal depth and whether standard reveal stock will suit or whether you need to rip custom widths.

Confirm the architrave size and profile from the plans, finish schedule or builder’s selections. Also determine the required margin or quirk between the inside edge of the architrave and the reveal, commonly 3 mm to 5 mm.

💡 On renovation work, always check whether the wall face is true. Existing masonry, old set plaster and patched linings often vary enough that equal margins and tight mitres depend on local scribing rather than assuming the opening is symmetrical.

Step 2: Prepare and size the reveal components

2️⃣ Cut the reveal legs, head and sill where applicable

If the reveal is being made as a box set, cut the two jamb legs and the head to size from 18 mm or 30 mm stock as specified. In some installations, the sill reveal is omitted where the window system already incorporates a finished internal stool or where the detail calls for only side and head reveals.

Allow for the actual opening size and the window frame profile. If the reveals sit into a groove in the window frame, measure the insertion depth accurately and deduct or add accordingly. If the reveal is face-fixed to the frame, size to finished visible dimensions.

Dry-fit all components first. Check for bow, wind and edge straightness. Reject or re-machine any stock that will telegraph into the finished trim-out.

Where wall depth varies, rip the reveal stock on a table saw so the reveal projects slightly proud of the finished lining, typically 1 mm to 2 mm proud. This gives you material to plane back flush after fixing if needed.

💡 A reveal sitting slightly proud is easier to finish cleanly than one set back behind plasterboard. Set-back reveals usually leave an inconsistent caulk line and a visibly poor fit-off.

Step 3: Assemble the reveal set if required

3️⃣ Join the reveal box square and true

For pre-assembled reveal sets, clamp the components on a flat bench and join them using PVA, brads, screws, or proprietary connectors depending on workshop practice. Keep all joints tight and ensure the assembly remains square by checking diagonals.

If using butt joints, predrill near ends to reduce splitting, especially on hardwood reveals. If the reveal detail will be stained or clear-finished, keep all fasteners concealed or position them where they will not show after architrave installation.

For site-built work, some carpenters install individual reveal members directly into the opening rather than pre-assembling the box. This is acceptable where openings are irregular and individual members need scribing for best fit.

Reference the builder’s detail and the window manufacturer’s installation method. Some aluminium and timber window systems have specific reveal groove dimensions and fixing requirements that must be followed.

Step 4: Pack, plumb and fix the reveals into the opening

4️⃣ Install the reveals with correct projection and alignment

Position the reveal set into the opening and use packers behind the jambs and head at fixing points. Bring the reveal flush or slightly proud to the finished wall surface as required.

Check each jamb leg for plumb with a 1200 mm spirit level. Check the head for level. Confirm the internal opening is square by checking diagonals and by measuring across the head, centre and sill positions.

Fix the reveal through to the surrounding frame, typically into studs, trimmers and lintel framing. Use 50 mm to 65 mm finish nails or suitable screws depending on the reveal thickness and substrate. Keep fixings neat and set back from visible arrises to avoid breakout.

Do not overdrive fixings, as this can pull the reveal out of plane. If the wall lining bellies or dips, adjust with local packing so the reveal face remains straight and the architrave will sit flat.

In masonry openings, reveals may be fixed to treated timber grounds, plugs, or adhesive systems depending on the specification. Confirm moisture separation and fixing method where the reveal is adjacent to masonry.

💡 Check the reveal projection at all four corners before final fixing. A minor variation here will become obvious once the architraves are installed and margins start wandering.

Step 5: Plane, sand and prepare the reveal face

5️⃣ Bring the reveal to finished line

Once fixed, check whether any part of the reveal is proud of the plasterboard or wall lining. Use a sharp block plane or low-angle hand plane to carefully bring the timber flush where required.

Lightly sand arrises and faces with 120 grit followed by 180 grit if the finish is to be clear-coated or stained. For painted work, avoid over-rounding the arris where the architrave margin will be marked, as this makes the quirk inconsistent.

If there are small gaps between the reveal and wall lining that will be covered by the architrave, leave them alone unless they affect the architrave seating. Any exposed defects, splits or dents should be filled before the finishing stage.

Mark the architrave margin evenly around the reveal using a combination square, typically 3 mm to 5 mm back from the internal edge of the reveal.

Step 6: Measure and cut the timber architraves

6️⃣ Set out mitres and dry-fit all pieces

Measure the opening based on the marked margin lines, not the raw reveal size. The long point of each mitre should align with the intersection of the margin lines.

Cut the side architraves first, then the head. Use a compound mitre saw with a fine-tooth blade to produce clean mitres with minimal breakout. Standard internal window architraves are generally cut at 45°, but always verify if the opening is true. Where walls are badly out, slight mitre adjustment may be needed for a tight joint.

Dry-fit the two legs and head before fixing. Check for:

consistent margin
flat bearing to wall and reveal
tight mitre closure
no twist or bow in the selected pieces

If the wall is uneven, lightly scribe the back edge of the architrave or relieve high points in the wall lining rather than forcing the trim into place.

💡 On stained or clear-finished work, cut mitres fractionally long and fine-tune them. Painted work is more forgiving, but exposed hardwood trim should be treated like joinery, not rough fit-off.

Step 7: Fix the architraves

7️⃣ Install the side legs first, then the head piece

Apply a small amount of adhesive at the mitres if appropriate for the finish standard and builder preference. Position the first side architrave to the marked margin and fix it off with 32 mm to 50 mm brads or finish nails depending on trim thickness and substrate.

Use one line of fixings near the reveal/jamb side and one near the outer edge where there is framing behind. Keep nail positions consistent and avoid placing fasteners too close to profile details where they will be difficult to fill invisibly.

Install the second leg, then fit the head piece tight between the two mitres. Adjust for perfect margin before final nailing. Re-check mitre closure and face alignment as you go.

Punch any hand-driven nails just below the surface, taking care not to bruise the timber. On premium clear-finished timber, minimise visible fixing wherever possible and consider glue-and-pin methods with careful nail placement.

Step 8: Fill, seal and finish

8️⃣ Complete the fit-off to paint or stain standard

Fill all nail holes with a suitable wood filler matched to the finish system. For painted trim, a quality paintable filler followed by sanding is standard. For stained or clear-finished timber, use colour-matched filler sparingly and keep it off surrounding grain.

Apply paintable acrylic gap sealant only where needed between architrave and wall, especially where wall surfaces vary. Do not over-caulk the inside margin against the reveal unless the detail specifically calls for it; a clean timber quirk usually presents better.

Final-sand filled areas and check all margins, mitres and surface condition under raking light. Prime any raw timber or cut ends before painting. For hardwood or stain-grade joinery, apply the specified oil, stain or clear finish in accordance with the coating manufacturer’s system.

If working as part of a larger fit-off package, protect finished reveals and architraves from follow-on trades with masking tape and removable film where appropriate.

Common Mistakes to Avoid

1.Installing reveals before checking the window frame for plumb, level and square, which results in uneven margins and difficult architrave fitment.
2.Cutting reveals exactly flush with the wall lining instead of leaving them 1 mm to 2 mm proud, making it harder to achieve a clean finished line.
3.Measuring architraves from the raw opening instead of from the marked margin lines, which throws out mitres and visible quirks.
4.Forcing architraves onto uneven walls without scribing or relieving high spots, causing open mitres and springing trim.
5.Overdriving brads or finish nails, which distorts the trim profile and creates unnecessary filling and rectification work.

Pro Tips

💡 Set a consistent margin using a combination square rather than measuring each point independently. It is faster and far more accurate.
💡 For irregular renovation openings, install reveal members individually and scribe to suit instead of trying to force a factory-square box into a non-square opening.
💡 Prime all cut ends on finger-jointed pine and MDF-based trim products immediately to reduce moisture uptake and edge swelling.
💡 Select the straightest architrave stock for the head piece. Any bow in the head is more noticeable than in the legs.
💡 If you are upgrading tools for regular fit-off work, a quality 18-gauge brad nailer and compound mitre saw are worthwhile investments. If either item is over $300, review current EOFY instant asset write-off eligibility with your accountant for business purchases.

Recommended Tools

Makita LS1040 or similar 255 mm compound mitre saw — reliable for clean, repeatable architrave mitres
Paslode 18Ga Brad Nailer — efficient fixing for architraves with minimal surface damage
Stanley FatMax 5 m Tape Measure — durable and easy-to-read mm graduations for fit-off work
Sutton Viper Combination Square — accurate margin marking and reveal set-out
HNT Gordon Low Angle Block Plane or equivalent — ideal for trimming reveals flush to plasterboard and refining proud edges

Frequently asked questions

What is the standard margin for timber architraves on window reveals?
The standard margin for timber architraves in Australia is 4 mm to 6 mm back from the inside face of the reveal. Scribe a continuous pencil line using an Empire combination square to maintain visual symmetry, allow clearance for window hardware, and prevent nail fixings from blowing out the timber reveal edge.
Should window reveals sit flush with the plasterboard lining?
Window reveals should finish 1 mm to 2 mm proud of the plasterboard wall lining rather than perfectly flush. This intentional projection ensures the timber architrave bridges the plasterboard edge tightly without rocking on high plasterboard joints, eliminating gaps beneath the internal mitre joints and simplifying finishing caulking.
What Australian standards apply to window reveals and internal trim installation?
Window reveals and architrave installations are governed by AS 2047 for window compliance and AS 1684 for residential timber-framed construction tolerances. Wall framing plumb tolerances must not exceed plus or minus 5 mm over a 2.4-metre wall height, while timber moulding materials and moisture tolerances must satisfy AS 2796.
What fixings should I use to install timber architraves?
Fix timber architraves using 16-gauge finish nails fired at 300 mm to 400 mm centres along the timber framing. Drive 32 mm brads into the reveal edge and 50 mm brads through the profile into the structural timber studs, using construction adhesive like Bostik Ultraset to eliminate timber movement.
How do you achieve tight mitre joints on internal timber architraves?
Achieve tight mitres by cutting 45-degree angles on a calibrated compound mitre saw with a slight 1-degree back-bevel. Apply PVA or polyurethane timber adhesive across the end grain, align the external corners flush, and cross-pin the mitres using 23-gauge headless pins to prevent joints opening during seasonal timber movement.
What timber species are commonly used for Australian window reveals?
Australian window reveals typically use finger-jointed pine (FJP) or moisture-resistant MDF for painted internal finishes due to dimensional stability. Stained internal joinery requires kiln-dried Australian hardwoods such as Victorian Ash, Tasmanian Oak, or Spotted Gum to coordinate directly with architectural timber flooring and interior trim profiles.

Written by Chippy, the Carpentry & Joinery specialist at VIC.Tools.