How to Install a Timber Fence
Guide to building a standard 1800mm paling fence with posts, rails, and paling boards.
- Skill level
- Intermediate
- Time
- 1-2 days per 10m
- Trade
- Carpentry & Joinery
- Updated
- 28 November 2026
Tools you will need
- Post hole digger
- Circular saw
- Impact driver
- Spirit level
- String line and pegs
- Tape measure
- Hammer
What is a standard timber fence and how is it built?
Guide to building a standard 1800mm paling fence with posts, rails, and paling boards.
This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.
Skill Level: Intermediate | Estimated Time: 1-2 days per 10mWhat essential steps should you take before installing a timber fence?
Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.
What specific tools are required for timber fence installation in Australia?
Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.
Step-by-Step Guide
Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.
Step 1: Mark out post positions at 2400mm centres
This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.
Step 2: Dig post holes 600mm deep and 300mm wide
With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.
Step 3: Set corner and end posts first in concrete, check plumb
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 4: Run string line between posts for intermediate posts
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 5: Allow concrete to cure 24 hours
You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.
Step 6: Fix rails (2 or 3) between posts with rail brackets
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 7: Nail or screw palings to rails starting from one end
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 8: Cap the fence and apply stain or paint
This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.
Safety Notes
Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.
Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.
Pro Tips from the Trade
These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.
Tip 1: Set posts 50mm higher than needed, trim to string line after. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 2: Alternate palings face-in face-out to reduce warping pressure. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 3: Use a spacer block for consistent paling gaps. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.Common Mistakes to Avoid
Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.
Mistake 1: Not checking boundary accurately before building. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 2: Setting posts too shallow for the fence height. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 3: Not bracing posts while concrete cures. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.Materials List
Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.
When to Call a Professional
While this guide covers a intermediate-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:
Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.
Frequently asked questions
- What tools do I need for install a timber fence?
- You will need: Post hole digger, Circular saw, Impact driver, Spirit level, String line and pegs, Tape measure, Hammer.
- How long does it take to install a timber fence?
- Expect approximately 1-2 days per 10m for this project.
- What safety precautions should I take?
- Confirm boundary lines with neighbour before building. Call 1100 before digging to check for services. Check local council for fence height regulations.
- What are the best tips for success?
- Set posts 50mm higher than needed, trim to string line after. Alternate palings face-in face-out to reduce warping pressure. Use a spacer block for consistent paling gaps.
- What mistakes should I avoid?
- Not checking boundary accurately before building. Setting posts too shallow for the fence height. Not bracing posts while concrete cures.
- What is the Australian standard for timber fence construction?
- While there isn't one single 'Australian Standard' specifically for timber fence construction, AS 1720.1:2010 'Timber structures – Design methods' provides guidelines for timber use in structural applications. Additionally, AS/NZS 1170.2:2021 addresses wind loads, which are crucial for fence stability. Local council regulations often dictate specific height and material requirements.
- How do I check for underground services before digging a fence post hole?
- Before any excavation, you must contact Dial Before You Dig (DBYD) by calling 1100 or visiting their website. This free service provides information on the location of underground utilities like electricity, gas, water, and telecommunications. According to SafeWork Australia's 'Excavation Work Code of Practice' (2020), this is a mandatory safety step to prevent serious injury or infrastructure damage.
- What are the typical council regulations for fence height in Australia?
- Fence height regulations vary significantly between local councils across Australia. Generally, front fences are limited to 1.2m, while side and rear boundary fences can be up to 1.8m or 2.0m without council approval. Always consult your specific local council's planning scheme or development control plan before commencing work, as non-compliance can lead to costly rectification orders.
- Are timber fence posts required to be treated in Australia?
- Yes, timber fence posts in ground contact in Australia should be treated to a minimum H4 hazard level according to AS 1604.1:2012 'Specification for timber preservation'. This treatment protects against fungal decay and insect attack, significantly extending the lifespan of the fence. Untreated timber posts will rapidly deteriorate in Australian soil conditions.
Written by Chippy, the Carpentry & Joinery specialist at VIC.Tools.