How to Build a Raised Deck on Piers

Construct a raised deck on concrete piers for uneven terrain, hillside blocks, or elevated entertaining areas.

Skill level
Advanced
Time
2-3 days
Trade
Earthmoving & Landscaping
Updated
28 November 2026

Tools you will need

  • Post hole digger or auger
  • Circular saw
  • Drill driver
  • Spirit level (1800mm)
  • String line
  • Socket set
  • Laser level

What is a raised deck on piers and why would you build one?

Construct a raised deck on concrete piers for uneven terrain, hillside blocks, or elevated entertaining areas.

This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.

Skill Level: Advanced | Estimated Time: 2-3 days

What essential preparations are needed before building a raised deck?

Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.

Read through the entire guide first so you understand the full scope of work
Gather all tools and materials listed below before you begin
Check weather conditions if working outdoors -- avoid starting if rain is forecast within your estimated time window
If working near existing structures, check for electrical cables, plumbing, and gas lines before cutting or drilling
Ensure you have adequate lighting in your work area
Wear appropriate PPE: safety glasses, hearing protection, gloves, and steel-cap boots where required

What specific tools are required to build a raised deck on piers?

Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.

Post hole digger or auger -- Essential for this project. Check your existing kit before purchasing.
Circular saw -- Essential for this project. Check your existing kit before purchasing.
Drill driver -- Essential for this project. Check your existing kit before purchasing.
Spirit level (1800mm) -- Essential for this project. Check your existing kit before purchasing.
String line -- Essential for this project. Check your existing kit before purchasing.
Socket set -- Essential for this project. Check your existing kit before purchasing.
Laser level -- Essential for this project. Check your existing kit before purchasing.

Step-by-Step Guide

Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.

Step 1: Check council requirements for elevated decks (usually need approval)

This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.

Step 2: Set out pier positions based on engineering span tables

With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.

Step 3: Dig pier holes to required depth (600mm minimum)

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 4: Pour concrete piers with galvanised stirrup brackets cast in

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 5: Allow concrete to cure 48 hours

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 6: Install posts in stirrups, check plumb and brace

You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.

Step 7: Fix bearers to posts at calculated level

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 8: Install joists on bearers at 450mm centres with joist hangers

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 9: Fix decking boards with stainless screws leaving 3-5mm gaps

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 10: Install balustrade and handrail to code (required over 1m height)

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 11: Apply finish (oil, stain, or paint)

This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.

Safety Notes

Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.

Elevated decks over 1m height require balustrade to BCA standards -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Engineering certification is usually required for elevated decks -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Check for underground services before digging pier holes -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Use fall protection when working above 2m -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.

Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.

Pro Tips from the Trade

These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.

Tip 1: Galvanised stirrup brackets keep timber out of ground contact. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 2: Pre-stain all surfaces before assembly for full protection. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 3: Use a laser level to transfer consistent height across all posts. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 4: Stainless steel fixings are essential in coastal areas. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.

Common Mistakes to Avoid

Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.

Mistake 1: Not getting required council approval for elevated structures. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 2: Under-sizing bearers and joists for the span causing bounce. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 3: Not installing adequate bracing for lateral stability. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 4: Using non-structural timber for load-bearing components. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.

Materials List

Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.

Concrete for piers -- Confirm grade and specifications match the requirements described in the steps above.
Galvanised stirrup brackets -- Confirm grade and specifications match the requirements described in the steps above.
Structural timber for posts, bearers, and joists -- Confirm grade and specifications match the requirements described in the steps above.
Decking boards (merbau, spotted gum, or treated pine) -- Confirm grade and specifications match the requirements described in the steps above.
Joist hangers and structural brackets -- Confirm grade and specifications match the requirements described in the steps above.
Stainless steel screws -- Confirm grade and specifications match the requirements described in the steps above.
Balustrade system (if over 1m) -- Confirm grade and specifications match the requirements described in the steps above.

When to Call a Professional

While this guide covers a advanced-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:

If you encounter structural elements that you are not confident assessing
If the project requires council permits or engineering certification
If you discover hidden hazards such as asbestos, faulty wiring, or damaged plumbing
If the scope grows beyond what you originally planned

Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.

Frequently asked questions

What tools do I need for build a raised deck on piers?
You will need: Post hole digger or auger, Circular saw, Drill driver, Spirit level (1800mm), String line, Socket set, Laser level.
How long does it take to build a raised deck on piers?
Expect approximately 2-3 days for this project.
What safety precautions should I take?
Elevated decks over 1m height require balustrade to BCA standards. Engineering certification is usually required for elevated decks. Check for underground services before digging pier holes. Use fall protection when working above 2m.
What are the best tips for success?
Galvanised stirrup brackets keep timber out of ground contact. Pre-stain all surfaces before assembly for full protection. Use a laser level to transfer consistent height across all posts. Stainless steel fixings are essential in coastal areas.
What mistakes should I avoid?
Not getting required council approval for elevated structures. Under-sizing bearers and joists for the span causing bounce. Not installing adequate bracing for lateral stability. Using non-structural timber for load-bearing components.
What safety precautions should I take when building a raised deck?
Elevated decks over 1 metre require balustrades compliant with NCC 2022 standards. Always check for underground services via Dial Before You Dig before excavating pier holes. Use fall protection for work above 2 metres, as mandated by SafeWork Australia guidelines, and wear appropriate PPE at all times.
What is the Australian standard for deck structural design?
The primary Australian standard for deck structural design is AS/NZS 1170.1:2002, which specifies design actions including permanent, imposed, and other loads. For timber framing, AS 1720.1:2010 Timber structures – Design methods is also critical. Always consult a structural engineer for specific project compliance.

Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.