Quick answer
Dig a fence post hole to a depth of one-third the above-ground post height, with a minimum depth of 600 millimetres for standard 1.8-metre fences. The hole diameter should be three times the post width, typically 200 to 300 millimetres. Corner and gate footings require 800 to 900 millimetres depth.
- Skill level
- Beginner
- Time
- 10-20 minutes per hole by hand, or 2-5 minutes per hole with a powered auger, plus set-out time
- Trade
- Earthmoving & Landscaping
- Updated
- 28 November 2026
Tools you will need
- Cyclone Heavy Duty Post Hole Pincer Digging Tool
- Atlas Trade 1.5m Point and Chisel Crow Bar
- Stihl BT 131 Earth Auger
- Empire 600mm True Blue Spirit Level
- Lufkin 8m Shockforce Tape Measure
- OX Trade Post Level
What is involved in digging a post hole for a fence?
Digging a post hole for a fence looks simple, but getting the depth, diameter and alignment right is what makes the fence stand straight and last in Australian conditions. This guide covers manual and powered digging methods, typical hole sizes for common residential fencing, and the correct way to prepare each hole before setting posts in soil, gravel or concrete.
What skill level is required to dig a post hole for a fence?
Beginner — Estimated time: 10-20 minutes per hole by hand, or 2-5 minutes per hole with a powered auger, plus set-out time
What tools are required to dig a post hole for a fence?
What materials are needed for digging a post hole for a fence?
Safety Requirements
Step-by-Step Guide
Step 1: Confirm the fence line and approvals
Before any digging, confirm exactly where the fence is going and whether it sits on a boundary, inside your property line, or along a retaining edge. Check local council rules for fence height, front boundary restrictions, and any easements or service corridors. If the fence is retaining soil or supporting a deck or pergola, you may need engineering advice rather than standard DIY post holes.
Step 2: Locate underground services
Submit a query through 1100 Before You Dig Australia and review all plans for electricity, gas, water, sewer, stormwater and communications. Mark the service locations on the ground with paint. If your hole location is within the marked service zone, do not use a mechanical auger until the services are safely exposed by hand.
Step 3: Set out the post positions
Run a string line tight between end pegs to establish the fence line. Measure and mark each post location along the line to suit your fence panel or rail spacing.
For common residential fences:
Mark each hole centre clearly with marking paint.
Step 4: Choose the correct hole size
Your hole diameter and depth depend on post size, fence height, wind load and soil conditions.
A practical guide for standard residential fencing:
General rule:
If in doubt, go slightly deeper and wider rather than undersizing the footing.
Step 5: Select the best digging method
Choose your digging method based on the number of holes, soil type and access.
Manual digging is best for:
Powered auger is best for:
Mini excavator with auger drive is best for:
Hire vs buy:
Step 6: Break the surface and start the hole
Use a shovel, mattock or crow bar to remove turf, mulch or compacted crust from the hole area first. Start at the marked centre and keep the opening neat so the hole stays true to size.
If digging by hand:
If using an auger:
Step 7: Keep the hole plumb and to depth
As the hole gets deeper, check alignment regularly with a tape measure from the string line and by eye from two directions. Keep the sides as straight as practical and the base relatively flat.
Target depths:
If the hole bells out at the top but is too narrow at the base, clean the sides so the concrete or compacted backfill bears properly around the post. Avoid leaving loose material at the bottom.
Step 8: Deal with roots, rocks and difficult ground
For roots:
For rocks:
For hard clay:
For sandy or collapsing holes:
Step 9: Prepare the base of the hole
Clean out all loose spoil from the bottom. Depending on the job, either:
For most DIY fence posts in residential yards, a small gravel base helps with levelling and drainage, especially for timber posts. Do not leave the post sitting in mud or loose spoil.
Step 10: Dry-fit the post and check the line
Stand the post in the hole and check:
This is the time to correct a hole that is slightly off-centre or not deep enough. It is much easier now than once concrete is mixed.
Step 11: Backfill or concrete the post
For standard fencing, concrete is the most common method.
Concrete set method:
Typical concrete use:
For some rural or lightweight fencing, posts may be backfilled with compacted soil or gravel instead of concrete:
Step 12: Final check and clean-up
Once the hole is complete and the post is set or ready to set, remove excess spoil from the work area and keep the site tidy. Recheck that all posts line through correctly before the footing hardens. If concreting, allow sufficient curing time before fixing rails or hanging gates.
As a guide:
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- How deep should a fence post hole be in Australia?
- A standard Australian residential fence post hole must be at least 600 mm deep, or roughly one-third of the total above-ground post height. For high-load areas such as end posts, gate posts, or corners, dig down to 800 mm to 900 mm to resist lateral wind load and gate pull.
- What diameter should a fence post hole be?
- A fence post hole should measure approximately three times the width of the post being installed. For a typical 100 mm timber post or 65 mm steel post, dig a 200 mm to 300 mm diameter hole. This ensures a minimum 75 mm concrete envelope around all sides.
- Do I need Before You Dig Australia before digging fence post holes?
- Yes, lodging an enquiry with Before You Dig Australia (BYDA on 1100) is essential before breaking ground on any fence line. Underground utility assets such as telecommunications fibre, low-voltage power, water mains, and gas lines frequently run close to boundary lines and shallow enough to be struck by a post hole shovel.
- How do you dig fence post holes in heavy Australian clay?
- Use a heavy 1.5-metre hex digging bar or crowbar to slice and break up dense clay before lifting it out with a scissor-style manual clam digger. If digging many holes in dry reactive clay, lightly soak the ground overnight or hire a hydraulic petrol post hole auger with a carbide pilot bit.
- Should you put gravel in the bottom of a post hole?
- Yes, adding 50 mm to 100 mm of crushed aggregate or drainage gravel to the base of the hole improves drainage under the post. This prevents moisture pooling around the timber end-grain, significantly reducing fungal decay and rot, while creating a stable footing before pouring concrete.
- What is the Australian standard for fencing post depth?
- While no standalone national standard mandates domestic post holes, AS 2159 (Piling - Design and installation) and AS 1604 (Preservative treatment for timber) govern structural footings and durability. Most Australian municipal councils mandate minimum 600 mm footing depths for boundary fences up to 1.8 metres tall.
Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.