How to Dig Footings for a Deck or Extension

Learn to dig deck and extension footings accurately in Australia. Master set-out, depth, and founding on solid ground for structural integrity and NCC compliance.

Skill level
Intermediate
Time
1 day for a small deck, 2-3 days for larger decks or extension footings depending on access, soil type and inspection requirements
Trade
Earthmoving & Landscaping
Updated
28 November 2026

Tools you will need

  • Steel Blue Argyle Zip - Steel-cap Boots
  • Milwaukee M18 FUEL - Cordless Rotary Hammer Drill (for pilot holes in rock)
  • Husqvarna K 770 - Power Cutter (with diamond blade for concrete/rock)
  • Spectra Precision LL300N - Laser Level Kit (with receiver and staff)
  • Stanley FatMax Xtreme - Tape Measure (8m or 30m)
  • Cyclone Professional - Mattock/Pick (for manual excavation)
  • Dingo K9-3 - Mini Digger/Excavator (with 300mm bucket and optional rock breaker)
  • Sherpa Heavy-Duty - Wheelbarrow (site grade, 100L capacity)
  • ProChoice - P2 Dust Mask and Safety Glasses
  • Stabila Plate Level - 120cm (for checking plumb and level)

Why is accurate footing excavation critical for Australian decks and extensions?

Digging footings for a deck or small extension is all about accuracy, depth control and founding on solid, undisturbed ground. Get the set-out, depth and bearing right at this stage and the rest of the build becomes far easier; get it wrong and you can end up with movement, failed inspections or costly rework.

What skill level is required for digging footings for a deck or extension in Australia?

Intermediate — Estimated time: 1 day for a small deck, 2-3 days for larger decks or extension footings depending on access, soil type and inspection requirements

What essential tools are needed for digging footings in Australia?

PPE: steel-cap boots, gloves, hi-vis, safety glasses, hearing protection, P2 dust mask for dry soils
Dial Before You Dig plans via 1100 Before You Dig and site plans/engineering drawings
Tape measure 8-30 m, marker paint, timber pegs and string line
Laser level or rotating laser with staff for checking footing depths and finished levels
Builder’s square and line level for basic set-out checks
Shovel, trenching shovel, crow bar and post hole shovel/manual clamshell digger
Mattock or pick for hard ground
Mini excavator 1.7-2.5 t with 300 mm and 450 mm buckets for multiple footings or tight access sites
Auger attachment with suitable diameters such as 300 mm, 450 mm or 600 mm where round pier footings are specified
Skid steer or track loader only if access and volume justify it; not ideal for tight, precise footing work
Wheelbarrow or site dumper for spoil removal
Plate compactor for surrounding fill or slab prep areas if specified
Straight edge, spirit level and measuring rod
Temporary barricades, witches hats and warning tape
Hose or pump for groundwater or rainwater management if water is present
Camera or phone to photograph excavation before pour/inspection

What materials are required for Australian footing excavation projects?

Approved engineering drawings and footing schedule
Timber pegs and profiles/batter boards for set-out
String line and marking paint
Concrete or reinforcing materials if footing works continue after excavation, as per engineer’s details
Plastic or tarps for spoil containment if working in tight residential sites
Crushed rock or drainage stone only where specified for drainage treatment, not as a substitute for inadequate founding
Ag pipe and geofabric only if drainage is shown on plans or required by site conditions
Inspection forms or permit documentation where council/private certifier approval applies

Safety Requirements

Contact 1100 Before You Dig before any excavation and positively identify all underground services on site. Do not rely on old plans alone.
Check whether council approval, a private certifier or an engineer’s footing inspection is required before digging or before concrete is poured. This is especially critical for extensions.
Follow the engineer’s drawings, NCC requirements and relevant Australian Standards including AS 2870 for residential slabs and footings, AS 3600 for concrete structures and AS 1684 where timber framing interfaces with deck footings.
Never enter an unsupported excavation if it is deep enough to pose a collapse risk. As a rule, if excavation depth approaches 1.5 m or soil is unstable, stop and get professional advice on battering, benching or shoring.
Keep spoil piles, materials and machinery at least 600 mm back from the edge of footings and trenches to reduce collapse risk.
Do not excavate under the footing line of an existing structure without engineering advice.
Use a spotter when operating machinery near buildings, fences, overhead powerlines or service corridors.
Stop work in heavy rain, saturated ground or if excavation sides begin slumping.
Ensure safe access/egress to the work area and keep children and pets excluded from site.

Step-by-Step Guide

Step 1: Confirm approvals, design and footing sizes

Before putting a shovel in the ground, confirm exactly what you are building and whether it is a deck footing or an extension footing. For a deck, the plans may nominate pad footings, bored piers or strip footings. For an extension, footing depth, width, reinforcement and founding level should come from an engineer based on soil classification and loads.

Do not guess footing sizes. As a rough DIY reference only, small deck post footings are commonly in the 300-450 mm diameter range and 450-900 mm deep, but reactive clay sites, sloping blocks or heavy roofed decks often require larger and deeper footings. Extension footings are almost always engineered and frequently inspected.

If you are buying equipment for regular work, a machine or attachment package over $20,000 is usually worth comparing with equipment finance through Ding Financial. For a one-off home job, hire is almost always the better value.

Step 2: Locate services and inspect the site

Lodge a 1100 Before You Dig enquiry and review all service plans for power, water, gas, sewer, stormwater and NBN/communications. Walk the site and identify obvious service indicators such as meter boxes, inspection openings, taps, pits and downpipes.

Hand-dig carefully around any suspected service zone. Never use an excavator blindly in these areas. Also check access, overhead clearances, drainage paths, neighbouring structures and where spoil will go.

If the ground is wet, loose or filled, note it now. Footings should generally bear on natural, undisturbed ground or engineered fill, not loose topsoil or random fill.

Step 3: Set out the footings accurately

Mark the building line from your plans using pegs, profiles and string line. For decks, set out all post centres and cross-check diagonals so the structure is square. For extension footings, establish the wall lines and excavation width from the engineer’s plan, not from a rough sketch.

Use a laser level to establish:

Existing ground level
Finished floor level if known
Required footing depth relative to the set-out datum

Mark each footing location with spray paint. For bored pier footings, mark the centre point and the required diameter. For strip footings, mark both sides of the excavation so you know the actual trench width.

A good set-out saves a lot of grief. Recheck all dimensions before digging.

Step 4: Strip topsoil and clear the work area

Remove turf, mulch, topsoil, roots and loose organic matter from the footing area. Topsoil is not suitable bearing material. You want the footing to sit on firm, competent ground.

For a small deck, this may only be 100-150 mm of topsoil around each hole. For an extension, strip the full work zone so the excavator can work safely and the set-out remains visible.

Keep the site tidy and stockpile spoil separately from reusable topsoil. If working close to existing paving or lawns you want to protect, lay down boards or geofabric with crushed rock for access.

Step 5: Choose the right excavation method

Match the method to the job size and soil:

Manual digging: best for 1-6 small deck footings in accessible, softer ground
Post hole auger: good for round bored piers in uniform soils; less effective in rock, heavy clay with cobbles or where exact base cleaning is needed
Mini excavator 1.7-2.5 t: best all-round option for multiple footings, strip footings and tight access. Use a 300 mm bucket for precise trenching and a 450 mm bucket for wider footing cuts
Rock breaker or rock auger: required if you hit shale, sandstone or dense rock

For most DIY homeowners doing more than a few footings, hiring a 1.7-2.0 t mini excavator for a day is often faster and cheaper than hand digging. If you only have two or three deck pads and easy soil, hand digging can be perfectly practical.

Step 6: Excavate to the required width and depth

Dig each footing to the size shown on the drawings. The key rule is this: excavate down to solid, undisturbed bearing material and keep the base level. Do not leave loose spoil in the bottom.

For round pier footings:

Keep the hole vertical and to the specified diameter
Clean out loose material from the base
Check depth with a measuring rod from your string line or laser datum

For strip footings:

Keep trench sides neat and trench width consistent
Dig the base level unless the plans call for stepped footings on a slope
Step footings properly rather than sloping the base, unless engineered otherwise

Typical depth guidance:

Remove all topsoil and organic matter first
Minimum founding is often below seasonal surface movement and onto natural ground
Reactive clay sites may require significantly deeper founding under AS 2870 and engineering advice

Do not over-excavate. If you accidentally go too deep, do not backfill with loose soil. The usual fix is to bring the footing back up with concrete to the engineer’s approval.

Step 7: Check bearing, moisture and excavation condition

Once at depth, inspect the base of every footing. You are looking for:

Firm, natural ground
No soft spots, roots or buried rubble
No loose spoil left in the bottom
No standing water
No sidewall collapse or undercutting

If one footing goes deeper than the others because of soft ground, that is normal in some sites. The important thing is that each footing bears on suitable material at the depth directed by the engineer or inspector.

If groundwater or seepage appears, pump out the water and stabilise the area. In some cases drainage or a revised footing detail is required. Don’t pour into muddy slurry unless specifically allowed by the engineer and concrete supplier for the footing type.

Step 8: Trim, square and prepare for inspection

Clean up the excavation so it can be inspected easily. Footing bases should be flat, dimensions clear and set-out lines still visible. Recheck:

Centre-to-centre spacing of deck post holes
Distance from boundaries
Width and depth of strip footings
Step heights and locations on sloping sites
Relative level of all footings using the laser

For council or private certifier inspections, have plans on site and be ready to show depths and dimensions. Take photos with a tape measure in the frame before any reinforcement or concrete goes in.

Extensions commonly require inspection before pouring. Decks may or may not depending on your local council and permit conditions.

Step 9: Manage spoil and protect the excavation

Move spoil at least 600 mm back from the edge. If rain is expected, cover the excavation area or provide temporary drainage to stop water running into the footings.

Do not leave open holes unprotected where people can fall in. Use barricades, covers or warning tape. If the excavation will remain open overnight, make it obvious and secure.

If the soil is fragile, avoid repeatedly driving machinery close to footing edges as vibration and surcharge loads can cause collapse.

Step 10: Final checks before reinforcement or concrete

Before proceeding to the next stage, confirm:

Footing positions match the plan
Depths and sizes match the footing schedule
Bearing material is acceptable
Any required inspection is complete
Water, loose spoil and organic matter are removed
Penetrations, hold-downs or starter bars are planned if needed

For deck work, this is the point where you typically install reinforcement or stirrups if specified, set any post anchors accurately and organise the concrete pour. For extensions, follow the engineer’s reinforcement details exactly and do not substitute sizes or cover requirements.

Common Mistakes to Avoid

1.Digging before checking services through 1100 Before You Dig and on-site service locations.
2.Using generic footing sizes from the internet instead of the approved plan or engineer’s design.
3.Founding on topsoil, loose fill or wet, soft material rather than natural, undisturbed ground.
4.Over-excavating and then backfilling the bottom with loose dirt to “make up” depth.
5.Letting rainwater fill the footings and then pouring without cleaning out mud and loose material.

Pro Tips

Set a single site datum with a laser before you start. Measuring every footing from the same reference point keeps the whole job consistent.
On sloping blocks, stepped footings are usually cleaner and stronger than trying to follow the slope with one uneven trench base.
If you are boring round deck footings with an auger, always clean the bottom by hand after drilling. Augers often leave loose spoil that reduces bearing quality.
For one-off homeowner jobs, hire a mini excavator or auger rather than buying. Purchase only makes sense for repeat work; if you are stepping into regular contracting and the package is over $20,000, compare finance options through Ding Financial.
Take photos of every footing with dimensions visible before concrete. It helps with inspections and future records when selling the property.

Recommended Tools

Kubota KX018-4 or similar 1.7-2.0 t mini excavator — ideal size for residential access and accurate footing excavation
Digga auger drive with 300 mm/450 mm augers — fast option for deck pier footings in suitable soils
Leica Rugby rotating laser level — reliable for checking depth, stepped footings and finished levels
Spear & Jackson post hole shovel/clamshell digger — useful for cleaning and trimming bored pier footings by hand
Husqvarna submersible site pump — handy when footings take on water after rain or from seepage

Frequently asked questions

What are the essential steps for accurately setting out deck or extension footings in Australia?
Accurate set-out for deck or extension footings in Australia involves establishing precise corner points and string lines, referencing the engineer's plans and AS 2870. Use a laser level, tape measure, and builder's square to mark out the footing locations, ensuring all dimensions and angles are correct before any excavation begins.
How do I determine the correct footing depth and width for an Australian deck or extension?
The correct footing depth and width for an Australian deck or extension are specified in the engineer's structural drawings, informed by the site's soil classification under AS 2870. Typically, footings must extend into undisturbed natural ground, often 450-600mm deep for reactive clays (e.g., Class H1 or E) to mitigate soil movement.
What is the best method for excavating footings in hard ground or rock in Australia?
For hard ground or rock in Australia, the best excavation method involves using a combination of a mini excavator with a rock bucket, a hydraulic breaker attachment, or a power cutter with a diamond blade. For example, a Dingo K9-3 with a breaker or a Husqvarna K 770 power cutter can effectively break up stubborn material, followed by manual removal.
How do I ensure the footing base is on undisturbed natural ground, as required by AS 2870?
To ensure the footing base is on undisturbed natural ground, as required by AS 2870, excavate until you reach firm, consistent soil that has not been previously disturbed or backfilled. A geotechnical engineer may confirm this, or a builder can perform a dynamic cone penetrometer (DCP) test to verify bearing capacity and stability.
What are the safety requirements for trenching and excavation for footings in Australia?
Safety requirements for trenching and excavation in Australia include consulting 'Dial Before You Dig' (1100) for underground services, wearing full PPE (e.g., Steel Blue Argyle Zip boots, ProChoice safety glasses), and implementing trench support if excavations exceed 1.5 metres or are in unstable ground, as per SafeWork Australia guidelines.
What specific tools are recommended for achieving level and plumb footings in Australia?
For achieving level and plumb footings in Australia, a Spectra Precision LL300N laser level kit is essential for accurate height transfer, alongside a Stanley FatMax Xtreme 8m tape measure and a Stabila Plate Level 120cm for checking vertical alignment. A builder's square ensures 90-degree corners.

Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.