How to install a soakwell in your backyard
Install a backyard soakwell in Australia to manage stormwater runoff effectively. This guide covers sizing, regulations, tools, and step-by-step installation for tradies and DIYers.
- Skill level
- Intermediate
- Time
- 1-2 days (depending on soil conditions and soakwell size)
- Trade
- Earthmoving & Landscaping
- Updated
- 28 November 2026
Tools you will need
- Kubota U17-3 Mini Excavator - 1.7t Mini Excavator
- Fiskars Solid Digging Spade - Shovel
- Whirlaway 85L Wheelbarrow - Heavy-Duty Wheelbarrow
- Stanley FatMax I-Beam Spirit Level (600mm) - Spirit Level
- Stanley FatMax Auto-Lock Tape Measure (8m) - Measuring Tape
- Milwaukee M18 FUEL Utility Knife - Utility Knife
- Wacker Neuson BS50-2i Compaction Plate - Wacker Packer
- Bahco 300mm Hacksaw - Hacksaw
- Ryobi RPD1200-G Hammer Drill with Sutton Tools Hole Saw Kit - Drill with Hole Saw Attachment
- Bosch GLL 3-80 C Line Laser Level - Laser Level
What is a soakwell and why install one in your backyard?
This guide details the process of installing a soakwell in your backyard to manage stormwater runoff and alleviate pooling water issues. A soakwell is an underground chamber designed to temporarily store and then slowly disperse stormwater into the surrounding soil, preventing surface water accumulation and protecting your property from water damage.
What skill level is required to install a backyard soakwell?
Intermediate — Estimated time: 1-2 days (depending on soil conditions and soakwell size)
What tools are essential for installing a soakwell?
Mini Excavator (1.7t - 2.5t): Essential for efficient excavation. Consider hiring for this task, as purchasing is only viable for frequent, large-scale projects (Ding Financial can assist with finance over $20k). Look for models with a 300mm and 450mm GP bucket. Shovel (Square Mouth & Pointed): For fine-tuning excavation and backfilling. Pickaxe/Crowbar: For breaking up compacted soil or small rocks. Wheelbarrow: For moving excavated soil and aggregate. Spirit Level (1200mm): For checking trench and base levels. Measuring Tape (8m): For accurate measurements. Utility Knife/Snips: For cutting geotextile fabric. Compaction Plate/Wacker Packer (Petrol): For compacting the base and backfill. Hire is recommended. Hacksaw/PVC Pipe Cutter: For cutting stormwater pipes. Drill with Hole Saw Attachment (matching pipe diameter): For creating inlet/outlet holes in the soakwell. Marker Paint/String Line & Pegs: For marking out excavation area. Laser Level (Optional but Recommended): For precise grading and depth control.What materials are needed for a typical soakwell installation?
Soakwell Kit: Pre-fabricated plastic or concrete soakwell chambers (e.g., Atlantis Flo-Tank, Graf Carat, or concrete rings). Size will depend on roof area and rainfall intensity. Consult a local plumber or engineer for sizing recommendations. For a typical residential downpipe, a 1000L - 2000L capacity is common. Geotextile Fabric (Non-woven, 200gsm+): Sufficient to line the excavation pit and wrap the soakwell. Aggregates (Washed, 20-40mm drainage gravel): Approximately 1-2 cubic metres, depending on soakwell size, for bedding and surrounding the soakwell. Stormwater Pipe (PVC, 90mm or 100mm DWV): Sufficient length to connect downpipe to soakwell. Stormwater Fittings: Elbows, reducers, T-junctions as required. PVC Primer and Cement: For joining stormwater pipes. Sand (Washed River Sand): Approximately 0.25 cubic metres for pipe bedding. Topsoil: For final backfill and turfing. Turf/Garden Materials: As required for reinstatement.Safety Requirements
Personal Protective Equipment (PPE): Safety Glasses (AS/NZS 1337.1): Mandatory for all excavation and cutting tasks. Hearing Protection (AS/NZS 1270): Mandatory when operating machinery (excavator, wacker packer). Steel-capped Boots (AS/NZS 2210.3): Mandatory for foot protection. Gloves (Heavy-duty work gloves): For hand protection. High-visibility Clothing: Recommended, especially when operating machinery. Dial Before You Dig (1100): MANDATORY before any excavation. Submit a request at least 2 business days prior to digging to identify underground services (water, gas, electricity, communications). Excavation Safety: Never enter an unsupported trench deeper than 1.5m. Ensure stable ground around the excavation. Keep children and pets away from the work area. Be aware of overhead power lines when operating machinery. Machinery Operation: Only operate machinery if you are competent and have read the operator's manual. Manual Handling: Lift with your legs, not your back. Get assistance for heavy items.Step-by-Step Guide
Step 1: Planning and Approvals
Determine Location: Choose a location at least 1.5m away from building foundations, property boundaries, and large trees. Ensure it's in a low-lying area where water naturally collects or can be directed. Sizing: Consult a local plumber or engineer to correctly size the soakwell based on your roof area, local rainfall data, and soil percolation rates. Council Approval: Check with your local council regarding any specific requirements or permits for stormwater management and soakwell installation. Some councils may require engineering designs or specific setback distances. Dial Before You Dig (1100): Submit your request and wait for all service plans. Mark out identified services clearly on the ground.Step 2: Site Preparation and Excavation
Mark Out: Using marker paint or string lines, mark the exact dimensions of the soakwell pit, allowing for at least 300mm clearance on all sides for aggregate backfill. Also, mark the trench line for the connecting stormwater pipe. Excavate the Trench: Using your mini excavator with a 300mm bucket, excavate the trench from the downpipe connection point to the soakwell pit. Ensure a minimum fall of 1:100 (10mm drop per 1m run) towards the soakwell for effective drainage. Excavate the Soakwell Pit: Switch to a 450mm bucket (or use a shovel for smaller pits) and excavate the main pit to the required depth. The depth should allow for a 100-150mm compacted aggregate base, the height of the soakwell, and at least 300mm of soil cover over the top of the soakwell. Use your spirit level or laser level to ensure a level base. Compact the Base: Once excavated, compact the base of the soakwell pit using the plate compactor.Step 3: Laying the Geotextile Fabric and Aggregate Base
Line the Pit: Line the entire excavation pit (base and sides) with the geotextile fabric. Ensure there's enough overlap at the top to completely wrap the soakwell later. The fabric prevents soil ingress into the aggregate and soakwell, maintaining drainage efficiency. Lay Aggregate Base: Spread a 100-150mm layer of washed 20-40mm drainage gravel evenly over the geotextile-lined base of the pit. Compact Aggregate: Compact the aggregate base using the plate compactor.Step 4: Soakwell Assembly and Placement
Assemble Soakwell: If using a modular plastic soakwell, assemble it according to the manufacturer's instructions. Ensure all connections are secure. Create Inlet/Outlet Holes: Using a drill with a hole saw, create the necessary inlet hole(s) for your stormwater pipe(s) and any overflow outlet if required, as per the manufacturer's recommendations. Position Soakwell: Carefully lower the assembled soakwell onto the compacted aggregate base in the pit. Ensure it is level using your spirit level.Step 5: Connecting Stormwater Pipes
Lay Pipe Bedding: In the excavated trench, lay a 50mm bed of washed river sand. Lay Stormwater Pipe: Lay the 90mm or 100mm DWV stormwater pipe in the trench, maintaining the required fall. Connect to Downpipe: Connect the stormwater pipe to your existing downpipe system using appropriate fittings (e.g., pop-up drain, leaf diverter, or direct connection). Connect to Soakwell: Connect the stormwater pipe to the inlet hole(s) of the soakwell. Use PVC primer and cement for all pipe joins to ensure a watertight seal. Backfill Trench: Carefully backfill the trench around the pipe with washed river sand to protect the pipe, then compact in layers with excavated soil.Step 6: Backfilling and Finishing
Aggregate Around Soakwell: Backfill around the sides of the soakwell with washed 20-40mm drainage gravel, ensuring the geotextile fabric remains in place. Fill up to the top of the soakwell. Wrap Soakwell: Fold the excess geotextile fabric over the top of the soakwell and aggregate, completely encasing it. This prevents soil from entering the soakwell system. Final Backfill: Carefully backfill over the wrapped soakwell with excavated soil, compacting in layers (150-200mm lifts) with the plate compactor. Leave enough space for topsoil and turf. Topsoil and Reinstatement: Spread a layer of good quality topsoil, level it, and then lay turf or plant garden beds as desired. Ensure the finished surface is slightly mounded to shed surface water away from the immediate soakwell area.Common Mistakes to Avoid
1.Not Dialling Before You Dig: This is the most critical mistake. Hitting underground services can be dangerous, costly, and illegal.
2.Incorrect Sizing: An undersized soakwell will quickly overflow, defeating its purpose. An oversized one is an unnecessary expense.
3.Poor Compaction: Inadequate compaction of the base and backfill can lead to subsidence and structural failure of the soakwell or surrounding ground.
4.No Geotextile Fabric: Without geotextile, fine soil particles will wash into the aggregate and soakwell, clogging the system and reducing its effectiveness over time.
5.Insufficient Fall on Pipes: If the connecting pipes don't have enough fall, water will sit in them, leading to blockages and reduced flow.
Pro Tips
Test Soil Percolation: Before committing to a soakwell, dig a small test pit (e.g., 300x300x300mm) and fill it with water. Time how long it takes to drain. If it drains very slowly (e.g., more than 24 hours), a soakwell might not be the most effective solution, and alternative drainage might be needed. Consider an Overflow: For very heavy rainfall events, consider installing an overflow pipe from the soakwell to a less critical area, a larger drainage system, or a second soakwell further down the line. Leaf Diverters: Install leaf diverters on your downpipes before the connection to the stormwater system. This prevents leaves and debris from entering and clogging your pipes and soakwell. Machinery Hire: When hiring a mini excavator, ask for a tilt hitch if available. It makes grading and levelling much easier, especially for trenches with a consistent fall.Access: Plan your access for the mini excavator and materials. Ensure you have enough space to manoeuvre and dump excavated soil.
Recommended Tools
1.Kubota U17-3 Mini Excavator: Reliable, compact, and powerful enough for most residential soakwell excavations. Easy to operate for DIYers.
2.Wacker Neuson WP1550AW Plate Compactor: A robust and efficient petrol plate compactor for achieving excellent compaction results on base and backfill.
3.Spectra Precision GL412N Single Grade Laser Level: While an investment, a good laser level ensures precise falls and level bases, crucial for effective drainage.
4.Atlantis Flo-Tank Modules: These modular plastic soakwell systems are lightweight, easy to assemble, and offer good capacity for their footprint.
5.Husqvarna K 770 Power Cutter (with diamond blade): If you encounter significant rock during excavation, this will make light work of it, but ensure you have proper training and PPE (AS/NZS 2727 for cutting equipment).
Frequently asked questions
- What is a soakwell and why is it important for Australian backyards?
- A soakwell is an underground drainage system designed to temporarily store stormwater runoff from impervious surfaces like roofs and driveways, then slowly release it into the surrounding soil. This prevents surface water pooling, reduces erosion, recharges groundwater, and protects property foundations from water damage, which is crucial for managing heavy rainfall events common in Australia.
- What Australian standards and regulations apply to soakwell installation?
- Soakwell installations in Australia must comply with AS/NZS 3500.3:2021 Plumbing and drainage – Stormwater drainage, which sets out design, material, and installation requirements. Additionally, local council regulations and planning schemes, such as those from Sydney Water or Melbourne Water, often dictate specific setbacks from boundaries, buildings, and wastewater systems, as well as minimum capacity requirements.
- How do I correctly size a soakwell for an Australian residential property?
- Correctly sizing a soakwell in Australia requires calculating the roof area draining to it, considering the local average rainfall intensity (e.g., 1-in-20 year storm event data from the Bureau of Meteorology), and assessing the soil's percolation rate. For a typical 150m² roof area in a moderate rainfall zone with good soil, a minimum 1500L capacity soakwell, like a 'Reln Soakwell' or 'Everhard EasyDrain', is often recommended, but a hydraulic engineer's assessment is best.
- What are the essential steps for installing a soakwell in an Australian backyard?
- The essential steps for installing a soakwell involve first contacting 'Dial Before You Dig' (1100), then excavating a pit to the required dimensions, preparing a stable base with 100mm of compacted aggregate (e.g., 20mm crushed rock), assembling and positioning the soakwell unit, connecting it to the stormwater pipework (e.g., 90mm or 100mm PVC DWV pipe), backfilling with permeable material like 20-40mm aggregate, and finally compacting the backfill in layers.
- What type of geotextile fabric should be used around a soakwell in Australia?
- For soakwell installations in Australia, a non-woven geotextile fabric with a minimum weight of 150-200 GSM (grams per square metre) should be used to prevent soil ingress into the soakwell and aggregate. Brands like 'Geofabrics' or 'Polyfabrics' offer suitable products, ensuring the fabric is permeable enough to allow water flow while effectively filtering out fine soil particles.
- What are common mistakes to avoid when installing a soakwell in Australia?
- Common mistakes when installing a soakwell in Australia include failing to contact 'Dial Before You Dig' (1100) before excavation, incorrect sizing leading to overflow or underperformance, inadequate compaction of the base and backfill causing subsidence, and not using a suitable geotextile fabric which can lead to the soakwell silting up prematurely. Always ensure compliance with AS/NZS 3500.3 and local council requirements.
Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.