Installing artificial grass in a backyard is a practical way to create a tidy, low-maintenance lawn that stands up well to Australian heat, drought, pets and heavy family use. The key to a professional result is not the turf itself, but the preparation underneath: correct excavation depth, drainage

Skill level
Intermediate
Time
1-3 days for 30-80 m²
Trade
Earthmoving & Landscaping
Updated
28 November 2026

Tools you will need

  • Tape measure, string line and marking paint for set
  • Plate compactor, 60
  • Spirit level or laser level for setting falls of 1
  • Utility knife with hook blades for trimming turf cleanly
  • Rubber mallet for edge work and paver/timber tapping
  • Optional: mini loader or 1.7
  • PPE: steel

What is involved in installing artificial grass in a backyard?

Installing artificial grass in a backyard is a practical way to create a tidy, low-maintenance lawn that stands up well to Australian heat, drought, pets and heavy family use. The key to a professional result is not the turf itself, but the preparation underneath: correct excavation depth, drainage fall, compaction and secure joining.

What skill level is required to install artificial grass in a backyard?

Intermediate — Estimated time: 1-3 days for 30-80 m²

What tools are required for artificial grass installation?

Tape measure, string line and marking paint for set-out
Shovel, rake and wheelbarrow for excavation and base spreading
Plate compactor, 60-90 kg minimum, preferably hire for DIY jobs
Screed rails or straight edges, 2 m aluminium screed recommended
Spirit level or laser level for setting falls of 1-2%
Utility knife with hook blades for trimming turf cleanly
Stiff outdoor broom or power broom for brushing pile upright
Joining trowel or notched adhesive spreader for seam adhesive
Hammer drill or driver for fixing edge restraints where required
Rubber mallet for edge work and paver/timber tapping
Garden hose or sprinkler for settling dust and checking drainage
Optional: mini loader or 1.7-2.5 t mini excavator for areas over 50 m² or heavy excavation; hire is usually more economical than buying for one-off work
PPE: steel-cap boots, gloves, safety glasses, hearing protection, P2 dust mask, knee pads, high-vis clothing and sunscreen

What materials are needed for artificial grass installation?

Artificial grass, UV-stabilised, typically 30-40 mm pile height for residential backyards; order total area plus 5-10% waste
Road base or crushed rock, 20 mm minus, typically 60-80 mm compacted depth
Crusher dust, granite dust or turf underlay fines, typically 10-20 mm compacted depth
Edge restraints as required:
Treated pine or composite edging, or
Aluminium/steel flexible turf edging
Galvanised turf pins or nails, typically 150-200 mm long
Joining tape, 200-300 mm wide, for turf seams
Turf seam adhesive, exterior grade polyurethane or manufacturer-approved adhesive
Kiln-dried silica sand infill, typically 5-10 kg/m² depending on turf specification
Optional pet odour-control infill such as zeolite for pet areas
Optional geotextile separation fabric for unstable or soft subgrades
Optional weed control spray for existing vegetation before excavation
Optional drainage materials for wet sites:
65-100 mm slotted ag pipe
Drainage gravel
Geotextile sock or wrap
Optional shock pad underlay where extra softness is desired for children’s play areas

Safety Requirements

Contact Dial Before You Dig on 1100 before any excavation, even in residential backyards, to identify underground power, gas, water, sewer and communications services.
Check local council requirements if you are changing site drainage, working near easements, adding retaining walls, or installing impermeable edging that may affect stormwater flow.
Wear full PPE: safety glasses, gloves, steel-cap boots, hearing protection, P2 dust mask and sun protection.
Use safe lifting techniques when handling turf rolls, base materials and compactors; artificial grass rolls are heavier than they look.
Keep excavation edges stable and do not undermine fences, footings or retaining walls.
Control dust during cutting and compaction, particularly in dry conditions.
Follow the artificial grass manufacturer’s installation instructions for seam adhesive, curing times and infill rates.
Keep children and pets off the area until adhesives have cured and the surface has been fully brushed and cleaned.

Step-by-Step Guide

Step 1: Plan the area, measure properly and choose the right turf

Measure the backyard length and width in metres, then sketch the area including paths, garden beds, sheds, drains and fixed edges. Decide how the turf rolls will be laid so the pile direction runs consistently; most lawns look best when viewed into the pile from the main entertaining area.

Choose a turf suited to the use:

30-35 mm pile for neat, low-maintenance family yards
35-40 mm pile for a softer look and feel
Pet-friendly perforated backing if dogs will use the area
Higher stitch rate and UV-stabilised yarn for better durability in Australian sun

When ordering, allow 5-10% extra for trimming and seam waste. If the area is irregular, have the supplier prepare a cutting plan.

Step 2: Check services, drainage and finished levels

Before any digging, lodge a Dial Before You Dig enquiry through 1100. Mark any services on the ground and keep clearances as required.

Work out your finished level relative to:

Alfresco slabs
Paving
Door thresholds
Weep holes in brick walls

Do not bury or bridge weep holes. Keep finished levels at least 75 mm below damp-course or weep holes unless otherwise specified by the building details. Plan a fall of 1-2%, which is 10-20 mm per metre, away from the house or towards drainage points.

If the site holds water after rain, this is the time to include drainage such as ag pipe or a shallow spoon drain beneath the base.

Step 3: Remove existing grass, weeds and topsoil

Strip out existing turf, weeds, roots and soft organic topsoil. For most backyard artificial grass installations, excavate:

75-100 mm total below finished level for pedestrian/family use
100-150 mm total if the site is soft, clay-heavy or will see higher use

A typical build-up is:

60-80 mm compacted road base
10-20 mm compacted fines layer
Turf and infill on top

If you are on firm sandy ground, you may be able to stay closer to the lower end of the excavation range. On reactive clay or wet areas, excavate deeper and improve drainage.

Dispose of spoil properly or use a skip bin. For larger yards, hiring a mini excavator or track loader can save a lot of labour.

Step 4: Install drainage if the site is slow-draining

If the backyard gets boggy, smells in pet areas, or sits on clay, install drainage before base materials go in. A practical residential option is a 65-100 mm slotted ag pipe laid in drainage gravel with geotextile wrap.

Set the pipe to fall at around 1%, which is 10 mm per metre, to a legal discharge point such as:

Existing stormwater connection
Soak well, where permitted
Approved garden drainage area

Do not direct stormwater onto neighbouring properties. If you are unsure, check with council or a licensed plumber/drainer where required in your state.

Step 5: Compact the subgrade and set edge restraints

Once excavation is complete, rake the exposed soil level and compact the subgrade with a plate compactor. If the ground pumps, feels soft or contains clay pockets, remove those areas and replace with compactable fill.

Install edge restraints around open sides so the turf stays locked in place and the base does not creep. Good options include:

Treated pine edging fixed with stakes
Aluminium flexible edging for curved shapes
Concrete mowing strip if you want a permanent border

Set edges to the final height, taking the turf thickness into account so the finished surface sits flush with adjacent paving or slightly proud by only a few millimetres.

Step 6: Lay and compact the road base

Spread road base in layers no thicker than 50 mm loose at a time, then compact each layer thoroughly. Aim for:

60-80 mm compacted road base on most backyard jobs
Up to 100 mm in soft or heavily used areas

Use a laser level, screed rails or string lines to maintain the planned fall of 1-2%. This is one of the most important parts of the job. The base should feel hard and stable underfoot with no rocking or soft spots.

Lightly moisten the base if needed to assist compaction, but do not saturate it.

Step 7: Add the fine screed layer and finish the base accurately

Place 10-20 mm of crusher dust, granite dust or similar fine material over the compacted road base. Screed it smooth using straight edges and rails, then compact again lightly.

This layer is what gives you a smooth-looking lawn. Take your time and remove any:

High points
Footprints
Ruts
Stones larger than about 5-10 mm near the surface

Check the final levels again. A poorly finished base will show through the artificial turf once installed.

Step 8: Roll out the turf and let it relax

Unroll the artificial grass over the prepared area with the pile all running in the same direction. Allow it to sit for at least 1-2 hours in warm weather, or longer if it has been tightly rolled, so creases can relax.

Position each piece carefully before trimming. Avoid stretching the turf aggressively, as this can distort the backing and create visible seams later.

If you have multiple widths, dry-fit all sections first and confirm:

Pile direction matches
Seams are in the least visible locations
Cuts minimise waste
The turf sits correctly against hard edges and curves

Step 9: Trim neatly and join the seams

Trim the turf from the backing side using a sharp utility knife with hook blades. Cut in small passes rather than trying to force through in one cut.

For joins:

Fold both edges back
Trim so the stitch rows sit close together without overlapping
Place joining tape centred under the seam
Apply seam adhesive as per manufacturer’s spread rate
Fold both sides into the adhesive carefully and press down evenly

The goal is a tight, invisible join without glue squeezing up through the pile. Weight the seam lightly while curing if recommended by the adhesive supplier.

Step 10: Fix the turf perimeter securely

Once the turf is in final position, secure the perimeter using galvanised turf pins or nails at approximately 150-300 mm centres depending on the edge condition. Use closer fixing on curves and corners.

Fixings should sit firm into the backing without dimpling the surface. Along hard edges, some installers use adhesive instead of pins where mechanical fixing is unsuitable.

Walk the entire area and check that:

No edges are lifting
Seams are flat
There are no bubbles or tension points

Step 11: Apply infill and brush the pile upright

Spread kiln-dried silica sand evenly over the turf at the manufacturer’s specified rate, commonly 5-10 kg/m². For pet areas, use a pet-friendly odour-control infill if desired.

Brush the turf with a stiff broom or power broom so the infill drops into the backing and the fibres stand upright. Work in multiple passes rather than trying to dump all infill at once.

Infill helps:

Stabilise the turf
Support the fibres
Improve appearance
Reduce movement and wrinkling
Improve wear performance in high-traffic areas

Do not overfill, as too much sand can flatten the grass and make it feel abrasive.

Step 12: Final tidy-up, water test and maintenance handover

Clean off all offcuts, pins and adhesive residue. Hose the surface lightly and check that water drains through and away as intended. If any low spots hold water, they usually point to base preparation issues that should be corrected early.

Brush the turf one final time and keep foot traffic off glued seams until fully cured. Ongoing maintenance is simple:

Remove leaves and debris regularly
Hose pet areas as needed
Brush high-traffic zones every few months
Top up infill if the pile starts to lay over

Common Mistakes to Avoid

1.Skipping proper excavation and laying turf straight over soil or old lawn, which leads to dips, weeds and poor drainage.
2.Not allowing enough fall, causing water to pond on the surface or against the house.
3.Under-compacting the base, which results in soft spots, movement and visible depressions.
4.Joining turf with mismatched pile direction or poorly trimmed seams, making the joins obvious.
5.Forgetting to keep finished levels below weep holes and adjacent building elements, which can create moisture issues.

Pro Tips

For most Australian backyards, the best result comes from a compacted road base topped with a fine screed layer; the smoother the base, the better the lawn will look.
In pet areas, spend extra time on drainage and consider zeolite or similar infill to help manage odours.
Lay seams parallel to the main viewing angle where possible, and keep joins away from the centre of the yard.
Hire a plate compactor rather than buying for a one-off job; if you are a contractor buying larger gear over $20,000, equipment finance through Ding Financial is worth considering.
If the area exceeds about 50 m² or access is tight but workable, a mini loader or 1.7-2.5 t mini excavator can save a full day of labour and produce a more consistent base.

Recommended Tools

60-90 kg plate compactor — essential for achieving a stable base that will not settle later
Laser level — the easiest way to maintain accurate falls of 10-20 mm per metre
Aluminium screed bar, 2 m — helps create a flat, even fine layer before turf goes down
Utility knife with hook blades — gives cleaner cuts on turf backing and reduces tearing
Stiff yard broom or power broom — needed to work in infill and stand the turf fibres upright

Frequently asked questions

What is involved in install artificial grass in a backyard?
Installing artificial grass in a backyard is a practical way to create a tidy, low-maintenance lawn that stands up well to Australian heat, drought, pets and heavy family use. The key to a professional result is not the turf itself, but the preparation underneath: correct excavation depth, drainage
What skill level do I need for install artificial grass in a backyard?
Intermediate — Estimated time: 1-3 days for 30-80 m²
What are common mistakes when install artificial grass in a backyard?
1. Skipping proper excavation and laying turf straight over soil or old lawn, which leads to dips, weeds and poor drainage. 2. Not allowing enough fall, causing water to pond on the surface or against the house. 3. Under-compacting the base, which results in soft spots, movement and visible depressions. 4. Joining turf with mismatched pile direction or poorly trimmed seams, making the joins obviou
What tools do I need for install artificial grass in a backyard?
This guide includes a comprehensive tools list. Key earthmoving & landscaping tools are detailed in the Tools Required section.
What is involved in installing artificial grass in a backyard?
Installing artificial grass in a backyard involves meticulous base preparation, ensuring correct excavation depth, drainage fall, and compaction. This creates a durable, low-maintenance lawn resistant to Australian conditions. The process includes laying and joining UV-stabilised turf over a prepared road base and crusher dust foundation, secured with specialised pins and adhesive.
What skill level do I need for installing artificial grass in a backyard?
An intermediate skill level is recommended for installing artificial grass in a backyard. This typically involves a good understanding of site preparation, levelling, and compaction techniques. While a DIY project is possible, professional landscapers often complete a 30-80 m² area in 1-3 days, leveraging specialised equipment and experience.
What are common mistakes when installing artificial grass in a backyard?
Common mistakes include insufficient excavation, leading to poor drainage and uneven surfaces. Under-compacting the base results in soft spots and movement. Incorrectly joining turf, such as mismatched pile direction or visible seams, compromises the aesthetic. Neglecting proper edge restraints can also lead to turf lifting over time, particularly in high-traffic areas.
What is the recommended base depth for artificial grass in Australia?
The recommended base depth for artificial grass in Australia typically involves a 60-80 mm compacted layer of 20 mm minus road base, topped with a 10-20 mm compacted layer of crusher dust or turf underlay fines. This multi-layer system provides optimal drainage and a stable, level foundation for the synthetic turf.

Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.