How to install artificial turf in your backyard
This guide will walk you through the process of installing artificial turf in your backyard, transforming a tired lawn into a low-maintenance, evergreen space. Perfect for Australian conditions, artificial turf eliminates watering, mowing, and fertilising, providing a durable and aesthetically pleas
- Skill level
- Intermediate
- Time
- 1-3 days (depending on area size and site conditions)
- Trade
- Earthmoving & Landscaping
- Updated
- 28 November 2026
Tools you will need
- Shovel/Spade: For digging and spreading.
- Wheelbarrow: For moving soil and base materials.
- Plate Compactor: 60
- Hand Tamper: For compacting edges and small areas.
- Rake: Steel rake for spreading and levelling.
- Broom/Stiff Brush: For spreading infill.
- Turf Gripper/Carpet Kicker
- Line Marker/String Line: For establishing straight edges.
- Hammer/Rubber Mallet: For securing turf pins.
- Gloves: Heavy
What is involved in installing artificial turf in a backyard?
This guide will walk you through the process of installing artificial turf in your backyard, transforming a tired lawn into a low-maintenance, evergreen space. Perfect for Australian conditions, artificial turf eliminates watering, mowing, and fertilising, providing a durable and aesthetically pleasing solution for year-round enjoyment.
What skill level is required for artificial turf installation?
Intermediate — Estimated time: 1-3 days (depending on area size and site conditions)
What specific tools are required for artificial turf installation?
Shovel/Spade: For digging and spreading. Wheelbarrow: For moving soil and base materials. Measuring Tape: 5m or 8m for accurate measurements. Utility Knife/Box Cutter: With plenty of spare blades for cutting turf. Straight Edge/Long Level: At least 1.2m long for screeding. Plate Compactor: 60-80kg vibrating plate compactor for base compaction (hire recommended). Hand Tamper: For compacting edges and small areas. Spirit Level: 600mm or 1200mm for checking levels. Rake: Steel rake for spreading and levelling. Broom/Stiff Brush: For spreading infill. Turf Gripper/Carpet Kicker (optional): For stretching turf. Line Marker/String Line: For establishing straight edges. Hammer/Rubber Mallet: For securing turf pins. Gloves: Heavy-duty work gloves. Safety Glasses: Eye protection. Dust Mask: For working with base materials. Ear Protection: When operating plate compactor.What materials are essential for artificial turf installation?
Artificial Turf: Measure your area carefully, adding 10-15% for cuts and wastage. Road Base/Crusher Dust (e.g., DGB20 or similar): Approximately 80-100mm compacted depth. Calculate volume: Area (m²) x Depth (m) x 1.5 (compaction factor). Washed Sand/Decomposed Granite (DG): Approximately 20-30mm compacted depth for the final screed layer. Weed Barrier Fabric (Geotextile): Sufficient to cover the entire area, with 150mm overlaps. Turf Adhesive/Seaming Tape: For joining turf sections (if required). Galvanised Turf Pins/U-Pins: Approximately 1 pin every 300-500mm around the perimeter and along seams. Infill Material (Kiln-Dried Sand or Crumb Rubber): Approximately 5-10kg per square metre, depending on turf pile height. Timber Edging (optional): Treated pine sleepers or similar for a defined edge.Safety Requirements
Always wear appropriate PPE: gloves, safety glasses, dust mask, ear protection. Be mindful of lifting heavy materials; use proper lifting techniques or get assistance. Exercise caution when using sharp tools like utility knives. When using a plate compactor, ensure good ventilation and follow manufacturer's instructions. ⚠️ Safety — Before any excavation, no matter how shallow, always call 📞 Dial Before You Dig (1100) to locate underground services.Step-by-Step Guide
Step 1: 1️⃣ Site Preparation and Excavation
Clear the existing area of all grass, weeds, rocks, and debris. Use a shovel or a mini excavator for larger areas. Excavate the area to a depth of 100-120mm below your desired finished turf level. This accounts for 80-100mm of compacted road base and 20-30mm of compacted sand/DG. Ensure a slight fall of 1-2% away from structures for drainage.
Step 2: 2️⃣ Install Edging (Optional) and Weed Barrier
If you're installing timber edging, now's the time to do it, securing it firmly. Lay down the weed barrier fabric over the entire excavated area, ensuring 150mm overlaps between sections. This prevents weeds from growing through and helps stabilise the base. Secure the fabric with a few turf pins or small rocks to prevent it from shifting.
Step 3: 3️⃣ Lay and Compact Road Base
Spread the road base evenly over the weed barrier to a depth of approximately 80-100mm. Use a rake to level it roughly. Then, thoroughly compact the road base using a plate compactor. Make multiple passes in different directions until the base is firm and stable. Check for low spots and fill them, then re-compact. The goal is a solid, unyielding foundation.
Step 4: 4️⃣ Screed and Level Sand/Decomposed Granite Layer
Spread the washed sand or decomposed granite over the compacted road base to a depth of 20-30mm. Use a long straight edge or level to screed the sand, creating a perfectly smooth and level surface. Work in small sections, using guide rails if necessary. This layer is crucial for the final appearance and drainage of your turf. Lightly moisten the sand and compact it with a hand tamper or the plate compactor (if it's a light one) to create a firm, even surface.
Step 5: 5️⃣ Roll Out and Position Artificial Turf
Unroll your artificial turf over the prepared base. Allow it to sit in the sun for a few hours to relax and flatten out, which makes it easier to work with. Ensure the pile direction (the way the blades lean) is consistent across all pieces and generally facing towards the main viewing area for the best aesthetic. Trim excess turf roughly with a utility knife, leaving a small overhang.
Step 6: 6️⃣ Cut, Join, and Secure Turf
Carefully trim the turf to fit the exact shape of your area, using a sharp utility knife from the underside of the turf. For joining multiple pieces, butt the edges together tightly without overlapping. Apply turf adhesive to seaming tape placed underneath the join, or use specialised seaming tape that adheres directly. Press the turf firmly onto the tape. Along the perimeter and every 300-500mm along seams, secure the turf with galvanised turf pins, pushing them deep into the base.
Step 7: 7️⃣ Apply and Brush Infill
Once the turf is secured, spread the infill material (kiln-dried sand or crumb rubber) evenly over the entire surface. Use a stiff broom or power broom to brush the infill deep into the turf fibres. This helps to weigh down the turf, support the blades, and improve drainage. Repeat this process until the infill is evenly distributed and the turf blades stand upright.
Step 8: 8️⃣ Final Inspection and Clean-Up
Inspect the entire area for any loose fibres, uneven infill, or visible seams. Brush the turf one last time to ensure all fibres are standing upright. Clean up any excess materials and debris.
Common Mistakes to Avoid
Pro Tips
💡 Hire, Don't Buy: For a one-off project, hiring a 1.7t mini excavator for initial excavation and a plate compactor will save significant time and effort compared to manual labour. 💡 Sun Orientation: When laying turf, ensure the pile direction faces the primary viewing angle (e.g., from your patio) for the most natural look. 💡 Water Test: After compacting your base layers, lightly spray the area with water to check for proper drainage and identify any low spots that need filling before laying turf. 💡 Sharp Blades: Always use a fresh, sharp utility knife blade when cutting turf. Dull blades will fray the turf and make clean cuts difficult. 💡 Infill Spreading: For large areas, consider hiring a broadcast spreader for infill to ensure even distribution.Recommended Tools
🔧 Wacker Neuson BS50-2i Rammer: Excellent for compacting edges and tight spots where a plate compactor can't reach. 🔧 Husqvarna LF 75 L Plate Compactor: A reliable and robust plate compactor for efficient base compaction. 🔧 Stanley FatMax Retractable Utility Knife: Durable and easy to change blades, essential for clean turf cuts.Frequently asked questions
- What is involved in install artificial turf in your backyard?
- This guide will walk you through the process of installing artificial turf in your backyard, transforming a tired lawn into a low-maintenance, evergreen space. Perfect for Australian conditions, artificial turf eliminates watering, mowing, and fertilising, providing a durable and aesthetically pleas
- What skill level do I need for install artificial turf in your backyard?
- Intermediate — Estimated time: 1-3 days (depending on area size and site conditions)
- What are common mistakes when install artificial turf in your backyard?
- 1. Insufficient Base Preparation: Not excavating deep enough or failing to compact the base properly will lead to an uneven, sinking, or poorly draining turf surface. 2. Ignoring Drainage: Failing to create a slight fall for drainage can lead to water pooling under the turf, causing odours or mould. 3. Incorrect Turf Direction: Laying turf sections with different pile directions wil
- What tools do I need for install artificial turf in your backyard?
- This guide includes a comprehensive tools list. Key earthmoving & landscaping tools are detailed in the Tools Required section.
- What is involved in installing artificial turf in your backyard?
- Installing artificial turf involves site preparation, base layer compaction, weed barrier installation, turf laying, seaming, and infill application. This process transforms a lawn into a low-maintenance, evergreen space, ideal for Australian conditions by eliminating watering and mowing. The total project typically takes 1-3 days for an intermediate-skilled tradie.
- What skill level do I need for installing artificial turf in your backyard?
- An intermediate skill level is recommended for artificial turf installation, as it requires precision in base preparation, levelling, and turf cutting. While not highly complex, attention to detail is crucial for a professional finish and long-term durability. The estimated time for completion is 1-3 days, depending on the area's size and site conditions.
- What are common mistakes when installing artificial turf in your backyard?
- Common mistakes include insufficient base preparation, such as inadequate excavation or compaction, leading to an uneven surface. Failing to establish proper drainage can cause water pooling and odours. Incorrect turf direction, where pile directions don't align, results in visible seams and an inconsistent appearance. Always ensure a slight fall for water runoff and consistent pile orientation.
- How deep should the base be for artificial turf in Australia?
- According to Australian industry best practices, the compacted base for artificial turf should be 80-100mm of road base (e.g., DGB20), followed by 20-30mm of compacted washed sand or decomposed granite. This depth ensures adequate drainage, stability, and a firm foundation for the turf, preventing future undulations or sinking.