How to lay driveway pavers

Learn how to lay driveway pavers across Australia. Follow AS 3727.1:2016 guidelines for excavation, road base compaction, screeding, and edge restraints.

Quick answer

To lay driveway pavers, excavate the site to a minimum depth of 240mm to accommodate 150mm of compacted Class 2 road base, 30mm of coarse bedding sand, and 60mm vehicular pavers. Install concrete haunching restraints, screed the sand, lay pavers in an interlocking herringbone pattern, and compact with jointing sand per AS 3727.1:2016.

Skill level
Intermediate
Time
2-4 days for 30-50 m²
Trade
Earthmoving & Landscaping
Updated
28 November 2026

Tools you will need

  • Kubota U17-3 - 1.7T Mini Excavator
  • Wacker Neuson DPU 4045He - Reversible Plate Compactor
  • Husqvarna K 770 - 350mm Power Cutter
  • Stabila LAR 160G - Rotating Laser Level
  • ScreedPro SP-30 - 3m Aluminium Screed Rail Kit
  • Ox Tools Pro Series - 900g Rubber Mallet

Why is proper preparation crucial for laying driveway pavers in Australia?

Laying driveway pavers is one of the best ways to upgrade street appeal while creating a durable, serviceable surface for everyday vehicles. The key to a long-lasting result is not the pavers themselves, but correct excavation, drainage, base compaction and edge restraint installation.

What skill level and time commitment are required for laying driveway pavers?

Intermediate — Estimated time: 2-4 days for 30-50 m²

What essential tools are needed for laying driveway pavers in Australia?

Tape measure, string line, timber pegs and marking paint
Rotating laser level or builder’s level with staff for setting falls accurately
Straight edge or screed board, 2.4-3.0 m long
Screed rails, such as 25 mm electrical conduit or aluminium rails
Shovel, rake, crow bar and wheelbarrow
Plate compactor:
75-100 kg plate compactor with rubber mat for bedding and final paver compaction
100-160 kg plate compactor for road base on larger driveways
Garden hose with spray nozzle for moisture conditioning during compaction
Rubber mallet for seating pavers
Brick saw, wet saw or cut-off saw with diamond masonry blade for edge cuts
Brick bolster and club hammer for minor trimming
Broom and soft broom for jointing sand
Mini excavator 1.7-2.5 t or skid steer/track loader for driveways over about 30 m² or deep excavation
Plate compactor trolley or ramps for safe loading/unloading
PPE:
Steel cap boots
Gloves
Safety glasses
Hearing protection
P2 dust mask or respirator for cutting and sweeping sand
Hi-vis shirt
Sunscreen and hat for outdoor work

What materials are essential for a durable Australian driveway paver installation?

Driveway pavers:
Minimum 60 mm thick for standard passenger vehicles on firm ground
Preferably 80 mm thick for heavier vehicles, SUVs, utes or frequent turning loads
Allow 5-10% extra for cuts and wastage
Road base, typically 20 mm minus DGB20 or equivalent:
100-150 mm compacted depth for cars on firm subgrade
150-200 mm compacted depth for heavier vehicles or softer ground
Bedding sand, washed coarse concrete sand:
20-30 mm screeded thickness
Jointing sand or polymeric paver sand:
Approximately 3-5 kg per m²
Edge restraints:
Concrete kerb, sleeper edge, steel/aluminium edging rated for paving, or soldier-course pavers haunched in concrete
Concrete for edge haunching:
20 MPa premix or bagged concrete
Geotextile separation fabric for weak, clayey or reactive subgrades
Drainage materials where required:
Channel drain
100 mm stormwater pipe
100 mm ag pipe in drainage gravel and sock for subsurface drainage
Crushed rock or drainage gravel for localised soft spots if needed

Safety Requirements

Before any excavation, contact Dial Before You Dig (1100) to locate underground services.
Check local council requirements before modifying a driveway crossover, verge, kerb or stormwater discharge point. Many councils require approval for new or altered crossovers.
Maintain finished falls away from the house and garage where practical. Stormwater work should comply with AS/NZS 3500.3.
Compaction and earthworks should follow good practice consistent with AS 3798.
For driveway widths, grades and vehicle access geometry, use local council rules and AS 2890.1 as a guide where applicable.
Wear full PPE at all times, especially eye, hearing and dust protection when cutting pavers.
Use wet cutting or dust suppression to reduce silica dust exposure.
Keep children, pets and vehicles off the work area until the driveway is fully compacted and edge restraints have cured.
Use correct lifting technique. Pavers, road base bags and compactors are heavy and can cause back injuries.
Never compact directly over pavers without a rubber mat fitted to the plate compactor.

Step-by-Step Guide

Step 1: Plan the driveway layout and confirm approvals

Measure the driveway length and width, then calculate the total area in m². Choose a paver rated for vehicular use, with 60 mm as the bare minimum for light domestic traffic and 80 mm preferred for better durability.

If you are changing the driveway width, crossover, verge levels or drainage connection, check with your local council first. Before digging, lodge a Dial Before You Dig (1100) enquiry and mark any service locations on site.

For driveways, a 45-degree or 90-degree herringbone pattern is the best option because it locks the pavers together under braking and turning loads better than stretcher bond.

Step 2: Set finished levels and drainage falls

Establish the final finished height at the garage, path, kerb or street tie-in. From there, set string lines and use a laser level to create the required fall.

As a rule of thumb:

Aim for a fall of 1:80 to 1:60 away from buildings
That equals about 12.5-16.5 mm fall per metre
Avoid flat spots where water can pond

Do not simply follow existing ground if it sends water toward the house. If the driveway runs toward a garage or dwelling, plan for a channel drain connected to legal stormwater.

Step 3: Excavate to the correct depth

Excavate below finished paving level by the full construction depth.

Typical domestic driveway build-up:

60 mm paver
20-30 mm bedding sand
100-150 mm compacted road base

Typical excavation depth for cars on firm ground:

180-240 mm below finished level

For heavier domestic vehicles or softer subgrade:

80 mm paver
20-30 mm bedding sand
150-200 mm compacted road base
Total excavation depth about 250-310 mm

Allow an extra 10-15 mm for final compaction and bedding settlement. Remove all topsoil, roots, mud and soft patches. Organic material left under the driveway will cause settlement later.

For a one-off project, hiring a 1.7-2.5 t mini excavator is usually more economical than buying. If you are purchasing larger earthmoving or paving equipment over $20k for ongoing work, consider equipment finance through Ding Financial.

Step 4: Trim and compact the subgrade

Once excavation is complete, rake the exposed subgrade level to the planned falls. Lightly moisten dry material, then compact the subgrade with a plate compactor.

Do not continue if the subgrade is pumping, boggy or visibly soft. Dig out soft spots and replace with compacted crushed rock. On reactive clay or poor ground, lay a geotextile separation fabric before placing road base.

A stable subgrade is critical. If the bottom is soft, the driveway will rut even if the pavers look perfect on day one.

Step 5: Install drainage before the base goes in

Install any required drainage now, not after paving starts. Common examples include:

Channel drain across garage entries
Stormwater line to a legal point of discharge
Ag pipe along retaining walls or waterlogged edges

Set drains slightly lower than adjacent paving so water enters the drain, not the garage. Check invert levels carefully with the laser before backfilling.

Step 6: Place the road base in layers and compact properly

Spread the road base in layers no thicker than 50-75 mm loose depth per pass. Compact each layer separately rather than dumping the whole depth at once.

Target compacted base depth:

100-150 mm for standard domestic cars
150-200 mm for heavier vehicles or weaker ground

Use the plate compactor with several overlapping passes. The base should be firm, dense and follow the final falls. Add a small amount of water if the material is too dry to bind, but do not saturate it.

This stage does most of the structural work. If the base is uneven, your pavers will mirror those imperfections.

Step 7: Install edge restraints

Edge restraints stop the pavers spreading under traffic. They are mandatory on driveways.

Suitable options include:

Concrete kerbs
Soldier-course pavers bedded and haunched in concrete
Heavy-duty steel or aluminium edging suitable for vehicular paving

Set the restraints to finished level and alignment before screeding bedding sand. If using concrete haunching, allow it to cure properly before compacting against it, typically 24-48 hours depending on weather and product.

Step 8: Screed the bedding sand

Spread washed coarse concrete sand over the compacted road base and screed it to a uniform thickness of 20-30 mm. Use screed rails and a straight edge to get an even bed.

Important points:

Do not use the bedding sand to fix low spots in the base
Do not compact the bedding sand before laying pavers
Only screed as much area as you can lay the same day

Once screeded, avoid walking on it. Any footprints or wheelbarrow tracks will telegraph into the finished surface.

Step 9: Lay the pavers in the selected pattern

Start from a straight edge, such as the garage threshold, a restrained side, or a 90-degree corner. Lay the pavers hand-tight on the screeded sand, working forward from the laid area so you do not disturb the bed.

For driveways:

Use a herringbone pattern where possible
Keep joints consistent, usually 2-4 mm depending on the paver
Check alignment every 1-2 m with a string line
Blend pavers from multiple pallets to reduce colour banding

Use a rubber mallet only for minor adjustment. Do not hammer pavers down hard into the bed.

Step 10: Cut and fit edge pavers

Leave edge cuts until the main field is laid. Measure each cut individually, especially around drains, curved edges and garage rebates.

Use a wet saw or diamond blade saw for clean, accurate cuts. Try to avoid very small slivers at the edges. As a guide, keep cut pieces larger than one-third of a full paver where possible.

Wear eye, hearing and dust protection during cutting, and use water suppression to reduce airborne silica dust.

Step 11: Compact the pavers and fill joints

Once all pavers are laid and cuts are in place, sweep jointing sand over the surface and run the plate compactor over the area with a rubber mat fitted.

Typical process:

First pass with light layer of jointing sand
Sweep more sand into joints
Compact again with 2-3 overlapping passes
Top up joints until completely full

The pavers should settle slightly into the bedding sand and lock together. If using polymeric sand, follow the manufacturer’s instructions exactly for dry conditions, activation and cure time.

Step 12: Final checks and handover

Check the finished driveway for:

Consistent falls
Full joint sand coverage
Tight edge restraints
No rocking or loose pavers
Clean tie-ins at garage, paths and kerb

Keep vehicles off the driveway for at least 24 hours after final compaction, and longer if concrete edge restraints or polymeric sand are still curing. Re-sand any joints that settle after the first week of use.

Common Mistakes to Avoid

1.Using pavers that are too thin for vehicle traffic, especially 40 mm pedestrian pavers on a driveway.
2.Skipping proper excavation depth and trying to save money on road base.
3.Using bedding sand to level out an uneven base instead of correcting the base first.
4.Laying the driveway flat or with fall toward the garage, which causes ponding and water ingress.
5.Forgetting edge restraints or compacting pavers without a rubber mat, leading to spread or surface damage.

Pro Tips

For driveways, 45-degree herringbone generally performs best under vehicle turning forces.
Hire a plate compactor and brick saw for a weekend if this is a one-off project. Buying only makes sense if you expect repeated paving jobs.
Blend pavers from at least three packs at once to avoid obvious shade variation.
Compact the road base in thin layers; deep loose fills nearly always settle later.
On soft or reactive sites, spend extra on subgrade improvement and geotextile. It is far cheaper than relaying a failed driveway.

Recommended Tools

Husqvarna LF 75 LAT plate compactor — good size for bedding, paver compaction and small-to-medium domestic jobs
Wacker Neuson WP1550A plate compactor — stronger option for compacting driveway road base
Stihl TSA 230 or Husqvarna K 770 with diamond blade — reliable paver cutting with clean, accurate edge work
Bosch GRL 300 HV or similar rotating laser level — makes setting driveway falls much easier and more accurate
Marshalltown aluminium screed board with 25 mm screed rails — helps achieve a consistent 20-30 mm bedding layer

Frequently asked questions

What is the correct base depth for driveway pavers in Australia?
A residential driveway requires a minimum compacted sub-base depth of 100mm to 150mm of Class 2 crushed rock, road base, or crushed concrete for light vehicle traffic. Heavy vehicle crossovers require 150mm to 200mm. Compact the material in 75mm lifts using a vibrating plate compactor to achieve standard density.
What thickness of paver is required for Australian driveways?
Driveway pavers must have a minimum thickness of 50mm for domestic cars, though 60mm to 80mm interlocking concrete or clay pavers conforming to AS/NZS 4456 are standard across Australia. Standard 30mm to 40mm patio pavers will crack under dynamic vehicle axle loads and must not be used on driveways.
How much fall does a paved driveway need for drainage?
A paved driveway requires a minimum crossfall or gradient of 1:100 (10mm per metre), though 1:50 to 1:60 (15mm to 20mm per metre) is recommended to prevent surface ponding. Fall must direct stormwater away from the garage and home foundations toward council-approved drainage or discharge pits per AS 3727.1:2016.
What sand do you use under driveway pavers?
Use a 25mm to 30mm layer of uncompacted, washed, coarse concrete river sand complying with AS 2758.1. Never use fine brickies loam or plasterers sand, as fine sands hold moisture and wash away. After screeding, lay pavers directly onto the loose sand before plate-compacting the entire surface.
How do you stop driveway pavers from moving?
Paver movement is prevented by installing continuous concrete haunching along all perimeter edges before or during paver installation. Haunching should consist of a 100mm wide by 100mm deep concrete edge bedded at a 45-degree angle against the outer paver row, finishing below the paver bevel to allow for turf or mulch.
What Australian standards govern driveway paving?
Driveway paving is governed by AS 3727.1:2016 (Pavements - Residential) for design and sub-base thickness, AS/NZS 4455 for masonry units and pavers, and AS/NZS 4456 for structural testing methods. Installation must also comply with the National Construction Code (NCC) and local municipal council crossover specifications.

Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.