How to lay patio pavers for an outdoor entertaining area
Learn how to lay patio pavers for an outdoor entertaining area. Master excavation depth, road base compaction, screeding, and drainage to AS 3727.1 standards.
Quick answer
To lay patio pavers correctly, excavate 150 millimetres deep, establish a 1:100 fall away from building walls, and compact 100 millimetres of Class 2 road base. Screed 30 millimetres of washed bedding sand, place pavers with 3 millimetre joint gaps, install concrete edge haunching, and sweep polymeric sand into all joints.
- Skill level
- Intermediate
- Time
- 2-4 days for a 15-30 m² patio, depending on access, cutting, and ground conditions.
- Trade
- Earthmoving & Landscaping
- Updated
- 29 November 2026
Tools you will need
- Crommelins CC70R - 70kg Plate Compactor
- Stihl TS 420 - Wet Cut Concrete Demo Saw
- SupaBord or Marshalltown 2.4m - Aluminium Screed Rail Set
- Ox Tools Pro - 450mm Rubber Mallet
- Empire 1200mm e70 - Box Level
- Makita 18V LXT - Cordless Wet/Dry Dust Extractor
- Spear & Jackson - Square Mouth Post Hole Shovel
🏗️ Trade Guide: How to Lay Patio Pavers for an Outdoor Entertaining Area
Why should you lay patio pavers for an outdoor entertaining area?
Laying patio pavers is one of the best-value backyard upgrades for Australian entertaining areas, but the finish is only as good as the base underneath it. The key to a patio that stays level, drains properly, and lasts through summer barbecues and winter rain is correct excavation, compaction, and setting out.
This guide is written for Australian homeowners and DIYers tackling a pedestrian patio area, with practical advice on tools, materials, drainage, and the right construction sequence. It follows common Australian paving practice and is broadly aligned with AS 3727.1 for residential pavements.
What skill level is required to lay patio pavers in Australia?
Intermediate — Estimated time: 2-4 days for a 15-30 m² patio, depending on access, cutting, and ground conditions.
What tools are required to lay patio pavers in Australia?
🔧 Equipment Required
💡 Hire vs buy: For a one-off DIY patio, it is usually cheaper to hire the plate compactor, wet saw, and mini excavator. Buying makes more sense if you have multiple landscaping projects planned; new compactors are often $1,500-$3,500, while mini excavators and skid steers can exceed $20,000. If you are buying machinery over $20,000, consider equipment finance through Ding Financial to preserve cash flow.
Materials Required
Safety Requirements
⚠️ Safety
Step-by-Step Guide
Step 1: 1️⃣ Plan the patio size, layout, and drainage
Start by deciding how the entertaining area will be used. For a dining setting, barbecue, and circulation space, allow enough room so furniture does not crowd the edges.
Measure the area and choose your paver size early, because it affects the layout, cutting, and material quantities. Larger format pavers look great on modern patios, but they need a flatter base and more accurate screeding.
Set your finished paving height first. The patio should sit below the house floor level and clear any weep holes by at least 75 mm. Build in a fall of 1:80 to 1:100 away from the house so water drains off instead of ponding.
If the area is low-lying or traps water, plan drainage now. A simple channel drain along the house edge or a spoon drain to lawn can save major headaches later.
Step 2: 2️⃣ Mark out the area and calculate excavation depth
Set out the patio using pegs and string lines. Check the area is square by comparing diagonal measurements, or use the 3-4-5 method to establish right angles.
Work out the total excavation depth from the finished surface downward. A typical pedestrian patio build-up is:
That gives a typical excavation depth of around 160-240 mm below finished paving level. On firm ground, 180-200 mm is common. On soft or reactive clay soils, increase the compacted base to 150-200 mm.
Mark the excavation depth on your pegs so you can dig consistently.
Step 3: 3️⃣ Excavate and prepare the subgrade
Remove all turf, roots, topsoil, and loose organic material. Dig down to your required depth across the whole area, not just where the pavers sit.
Keep the subgrade reasonably even and follow the planned fall. Soft spots must be dug out and replaced with compacted road base, not just covered over.
Compact the exposed subgrade with the plate compactor. If the soil is very soft, clayey, or previously filled, lay a geotextile separation fabric before placing road base. This helps stop the base pumping into the soil over time.
💡 For areas over 20 m², or where access allows, a hired 1.7-2.5 t mini excavator will save a huge amount of labour and usually pays for itself in time saved.
Step 4: 4️⃣ Install and compact the road base
Spread the road base in layers, not all at once. Compact in lifts of around 50-75 mm to achieve proper density.
Lightly moisten dusty base material if needed, but do not soak it. Compact each layer with multiple overlapping passes until it feels tight underfoot and the machine no longer leaves visible marks.
For a standard backyard entertaining patio, aim for a final compacted road base thickness of:
Keep checking levels and fall with a laser or straightedge as you go. The compacted base should already reflect the final drainage slope before the sand goes down.
Step 5: 5️⃣ Install edge restraints
Edge restraints stop the pavers creeping sideways and opening up joints over time. They are essential on almost every patio.
Common options for DIY patios include:
Install the edging to the correct line and height before screeding the sand, or immediately after laying if the system allows it. If using concrete haunching, allow it to firm up before compacting the pavers.
💡 Do not rely on the pavers themselves to hold the patio together. Without a proper edge restraint, movement is almost guaranteed.
Step 6: 6️⃣ Screed the bedding sand
Place screed rails on the compacted base and set them to the correct height and fall. Spread bedding sand between the rails and pull a straightedge over it to create a smooth, even bed.
The bedding sand should be 20-30 mm thick after screeding. Do not use thick sand to correct poor levels in the base; if the base is wrong, fix the base.
Only screed as much area as you can pave without disturbing it. Do not walk on the prepared sand bed.
Washed concrete sand or proper paving sand is preferred. Very fine brickies sand can hold too much moisture and is less stable under pavers.
Step 7: 7️⃣ Lay the pavers
Start from a straight, fixed edge such as the house-side drain line, a kerb, or a well-set string line. Lay the pavers hand-tight, using the built-in spacer nibs if the product has them.
Work forward on the laid pavers, not on the screeded sand. Check line and bond regularly so any drift is corrected early rather than at the end.
Use a rubber mallet to gently tap pavers into position. Avoid hammering them deep into the sand. The compactor will bed them in later.
If your pavers come from multiple packs, blend from several packs at once. This helps avoid visible colour banding, especially with natural stone or concrete pavers.
Step 8: 8️⃣ Cut in the perimeter and awkward areas
Once the full pavers are laid, measure and cut the edge pieces. A wet saw gives the best finish and much better dust control than a dry grinder.
Aim to avoid tiny slivers at the perimeter. If you are ending up with cuts less than about one-third of a paver width, adjust the starting line earlier in the job if possible.
Cut around posts, downpipes, inspection openings, and drains neatly. Maintain access to any service lids rather than paving them permanently shut.
Step 9: 9️⃣ Compact the pavers and fill the joints
Sweep dry jointing sand across the surface so the joints are partly filled. Then compact the pavers with a plate compactor fitted with a neoprene mat to avoid scratching or chipping the surface.
Make a few light passes in different directions. This settles the pavers into the bedding sand and helps lock the surface together.
Sweep more sand into the joints and repeat until the joints are completely filled. If using polymeric sand, follow the manufacturer’s instructions exactly for dry conditions, filling, and watering.
Do a final clean-up and check the finished fall with a hose. Water should run off cleanly without pooling.
Step 10: 🔟 Final checks and aftercare
Keep foot traffic light for the first 24 hours, especially if edge concrete or polymeric sand is still curing. Refill any joints that settle after the first week.
Inspect the patio after the first decent rain. If any low spots or drainage issues appear, address them early before furniture goes back in place.
For long-term performance, keep the joints topped up, clean organic matter off the surface, and pressure wash carefully so you do not blast the joint sand out.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
🔧 Recommended Equipment
Frequently asked questions
- How deep should you excavate when laying patio pavers?
- Excavate between 150 mm and 180 mm deep for a residential pedestrian patio. This total depth allows for a compacted 75 mm to 100 mm road base layer, a 25 mm to 30 mm washed bedding sand layer, and standard 40 mm to 50 mm thick paving units. Ensure you maintain adequate clearance below the finished weep holes.
- What is the correct drainage fall for outdoor patio paving in Australia?
- A minimum drainage fall of 1:100, or 10 mm per linear metre, directed away from the dwelling is standard under AS 3727.1:2018. For split-face stone or textured pavers, increase the fall to 1:60 or approximately 15 mm per metre to stop surface water from ponding against walls and footings.
- What type of sand should be used under patio pavers?
- Use coarse, washed concrete sand or bedding sand, not brickies loam or fine plasterers sand. Washed river sand allows excess water to drain freely and does not wash out or compress unevenly over time. Screed the bedding sand evenly across the compacted road base at a consistent depth of 25 mm to 30 mm.
- Can you cut concrete patio pavers with a standard angle grinder?
- Yes, you can cut pavers using an angle grinder fitted with a continuous or segmented diamond blade, provided you use water suppression. SafeWork Australia mandates on-tool water suppression or an M-class dust extraction system to manage hazardous respirable crystalline silica, combined with an AS/NZS 1716 compliant P2 respirator.
- How do you stop patio pavers from moving at the edges?
- Install a continuous concrete edge beam or haunching bedded into the sub-base, sloped downwards at a 45-degree angle beneath finished ground level. Alternatively, secure heavy-duty PVC or aluminium landscape edging with galvanised steel spikes. Edge restraints prevent lateral movement and spreading across the sand bed as the patio settles under foot traffic.
Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.