How to level ground for a trampoline or kids' play area

Level ground for a trampoline or kids' play area safely in Australia. Learn about DGB20 base material, compaction methods, and AS 4685.0:2017 safety principles for a stable, well-drained surface.

Skill level
Beginner to Intermediate
Time
4–8 hours for a small trampoline pad, 1–2 days for a larger play area or sites with more than 100 mm of fall.
Trade
Earthmoving & Landscaping
Updated
28 November 2026

Tools you will need

  • Spectra Precision LL100N - Laser Level Kit
  • Stanley FatMax 8m - Tape Measure
  • Cyclone 636100 - Square Mouth Shovel
  • Bailey 10L - Wheelbarrow
  • Wacker Neuson BS50-2 - Plate Compactor (approx. 60kg)
  • Trojan - Hand Tamper
  • Screed Bar 2.4m - Aluminium Straight Edge
  • Makita DHR242Z - Rotary Hammer Drill (for pegging)
  • Bunnings Timber Pegs - 450mm x 45mm

🏗️ Trade Guide: How to level ground for a trampoline or kids' play area

Why is proper ground levelling crucial for trampolines and play areas?

Levelling ground for a trampoline or kids’ play area is a straightforward earthworks job when you plan the site properly, control drainage, and compact the base in layers. The goal is to create a firm, flat, and well-drained surface so the equipment sits safely, doesn’t rock, and won’t turn into a muddy low spot after summer storms.

What skill level and time commitment are required for levelling ground?

Beginner to Intermediate — Estimated time: 4–8 hours for a small trampoline pad, 1–2 days for a larger play area or sites with more than 100 mm of fall.

What essential tools are needed for levelling ground for play equipment?

Laser level or rotating laser level with staff
Best for checking fall and finished levels accurately over 3–10 m
String line, line level, timber pegs, and marking paint
For setting out the pad and checking corners
Tape measure at least 5 m
Shovel, square-mouth shovel, rake, mattock/pick
Wheelbarrow
Plate compactor 60–90 kg for most backyard pads
Suitable for compacting crusher dust, road base, and bedding layers
Hand tamper for edges and tight corners
Mini excavator 1.7 t to 2.5 t with 300 mm bucket and clean-up bucket
Recommended if you need to cut/fill more than 100–150 mm or the area is larger than 15–20 m²
Skid steer or mini loader optional for larger sites and moving imported fill
Straight edge / screed rail 2–3 m
Garden hose with spray nozzle for moisture conditioning before compaction
Utility knife and staple pins if installing geotextile
PPE:
Safety boots
Gloves
Safety glasses
Hearing protection
High-vis clothing
Dust mask/P2 respirator when handling dry base materials
Sunscreen and hat

What are the recommended base materials for a trampoline or play area?

Road base / DGB20 or similar compactable base
Allow roughly 0.1 m³ per m² for a 100 mm compacted layer
Crusher dust or bedding sand
20–30 mm finishing layer if required
Geotextile fabric for soft, reactive, or weedy ground
Turf underlay / topsoil if restoring cut edges or surrounding lawn
Drainage gravel 10–20 mm if minor drainage improvement is needed
Slotted ag pipe 100 mm and sock, optional for wet sites
Timber pegs and string line
Turf staples / fixing pins for geotextile
Play area surfacing if required:
Softfall mulch
Engineered wood fibre
Washed sand
Synthetic turf over compacted base
Rubber softfall system for higher-risk equipment

Safety Requirements

⚠️ Safety — 📞 Dial Before You Dig (1100) before any excavation, even for shallow backyard works. Underground power, water, gas, NBN, stormwater, and irrigation are common in residential yards.
Wear full PPE including boots, gloves, eye and hearing protection.
Keep children and pets out of the work zone until the surface is finished and compacted.
Do not excavate close to:
House footings
Pool shells
Boundary retaining walls
Sewer inspection openings
Existing drainage pits

unless you know the construction and clearance requirements.

If you are changing site drainage or directing runoff toward a neighbour, street, or easement, check local council requirements.
For larger play equipment, fall zones and impact surfaces should align with the intent of AS 4685 (playground equipment) and AS 4422 (playground surfacing).
If you are using powered equipment, follow manufacturer operating instructions and safe work practices for compaction and excavation plant.
Avoid working on saturated soil, steep batters, or unstable fill.
If any equipment purchase is over $20,000, finance options such as Ding Financial may be worth considering rather than tying up cash.

Step-by-Step Guide

Step 1: 1️⃣ Choose the right location

Pick a spot with enough clearance around the trampoline or play equipment for safe access and fall zones. As a minimum, choose a site clear of tree roots, clotheslines, fences, retaining walls, and overhead branches.

A good backyard site should:

Be naturally as level as possible
Drain away from buildings
Not sit in a known boggy or low area
Have enough extra working room around the pad

For trampolines, allow the manufacturer’s footprint plus at least 1 m of clear access around the outside while you work. For play areas, allow for the equipment footprint plus softfall or circulation zones.

💡 Starting on the flattest part of the yard saves time, reduces spoil, and often avoids needing imported fill.

Step 2: 2️⃣ Set out the area and check levels

Mark the perimeter with pegs and string line. For a round trampoline, mark a square or circle slightly larger than the frame. For a play area, set out the full pad plus edging if used.

Use a laser level or string line to measure the existing fall across the site. Record the high side and low side. This tells you how much material you need to cut or fill.

As a guide:

Up to 50 mm difference across the pad is usually easy by hand
50–150 mm difference may need cut-and-fill plus compaction
More than 150 mm difference is where a mini excavator becomes worthwhile

For most play surfaces, aim for the finished surface to be level across the equipment area, with the surrounding ground falling away at about 1:100 to 1:80 to shed water.

Step 3: 3️⃣ Decide on cut, fill, or a combination

The best result usually comes from a cut-and-fill balance rather than simply building up the low side. Cut the high side down and use suitable compactable fill on the low side.

General rule:

If you only fill the low side with loose topsoil, it will settle and the equipment may tilt later
If you cut too deep into reactive clay without rebuilding the base, the area can hold water

For stable DIY jobs:

Strip turf and topsoil first
Keep topsoil separate from structural fill
Use road base or approved compactable fill for build-up areas
Reuse topsoil only for surrounding lawn or garden reinstatement

💡 Topsoil is not a structural base. It is for plants, not for trampolines or swing sets.

Step 4: 4️⃣ Strip turf and remove soft topsoil

Remove grass and topsoil across the entire area plus at least 150–300 mm extra around the perimeter. Strip to firm subgrade.

Typical stripping depth:

Turf and topsoil: 50–100 mm
More if the topsoil is soft, organic, or full of roots

You can do this by hand with a spade and mattock for small sites. For larger areas, a 1.7 t mini excavator with a clean-up bucket makes the job much faster and cleaner.

Dispose of spoil, reuse it elsewhere in the garden, or stockpile it for edge reinstatement.

Step 5: 5️⃣ Shape the subgrade

Once the soft layer is removed, trim the subgrade to the target level. Cut the high side and lightly fill the low side with compactable material as needed.

Check levels continuously with the laser. The subgrade should be:

Even and firm
Free of roots, buried timber, and loose organic matter
Slightly below final height to allow for base and surfacing thickness

Typical build-ups:

For a basic trampoline pad on stable ground: 75–100 mm compacted base
For a play area with synthetic turf or mulch edging: 100–150 mm compacted base depending on site softness and traffic

If the native soil is soft or clayey, lay geotextile fabric before placing base material. This helps stop the base punching into the soil and improves long-term stability.

Step 6: 6️⃣ Fix drainage before you compact

If the site is wet, shaded, or low in the yard, solve drainage now rather than after the first storm. A level pad can still drain well if the surrounding ground falls away and the base is free-draining.

Options include:

Regrade the surrounding lawn so water moves away from the pad
Add a shallow spoon drain nearby
Install 100 mm slotted ag pipe in gravel on the low side if water regularly sits in the area
Use a permeable top finish such as mulch or synthetic turf over a free-draining base

Do not trap water by creating a flat “dish” with raised edges. The finished area should not become the lowest point in the backyard.

Council approval may be required if you are connecting drainage into legal points of discharge or materially altering stormwater flow.

Step 7: 7️⃣ Place base material in layers

Spread road base or other compactable granular fill in thin layers rather than one thick dump. This is the step that determines whether the surface stays level.

Recommended layer thickness:

Loose layers of 50 mm
Compact each layer before adding the next
Build to a total compacted thickness of 75–150 mm depending on site conditions

Lightly wet dry material before compaction. It should be damp, not saturated. Compact each layer with a plate compactor in overlapping passes until it feels firm underfoot and no longer ruts easily.

For deeper fill on the low side:

Bench into the existing ground if needed
Compact every layer thoroughly
Do not exceed 100 mm loose thickness per pass for DIY compaction

💡 Hire vs buy: for a one-off backyard job, a plate compactor is almost always better to hire. Buying only starts to make sense if you regularly do paving, shed pads, or landscaping work. A mini excavator is also generally a hire item for homeowners, while ownership suits contractors or acreage users with ongoing projects.

Step 8: 8️⃣ Screed and fine-level the surface

Once the main base is compacted, apply a 20–30 mm layer of crusher dust or bedding material if you need a finer finish. Screed it using a straight edge to remove bumps and hollows.

Check level in multiple directions:

Side to side
Front to back
Corner to corner

Target tolerance for a trampoline or small play frame:

Within 10 mm across the full footprint if possible

This step is important because a slightly uneven base often shows up once the frame is assembled.

Step 9: 9️⃣ Compact the finished surface and test stability

Compact the final surface again and walk the entire area. There should be no rocking, soft spots, or visible pumping underfoot.

Test by placing a long straight edge or the actual equipment legs/frame layout on the pad. Check whether all legs or support points will sit evenly without packing random pavers underneath.

If the area is for a larger play set, test for:

Twist across the pad
Edge softness
Local low spots where water may pond

Correct any defects now. Small imperfections are much easier to fix before installation.

Step 10: 🔟 Install edging, surfacing, and tidy the surrounds

For a dedicated play area, install edging to hold mulch, sand, or turf neatly in place. Reinstate surrounding lawn with topsoil and turf where you cut into the yard.

Suitable finishes include:

Bare compacted base for under many trampolines
Synthetic turf over compacted base for a neat look
Softfall mulch or engineered wood fibre for play zones
Washed sand where appropriate for play and drainage

If the play equipment has a fall height that needs impact attenuation, choose surfacing that meets the intended performance requirements under AS 4422.

Step 11: 1️⃣1️⃣ Final safety check before use

Before the kids jump in:

Confirm the frame sits flat with no wobble
Check all drainage still runs away from the area
Make sure there are no exposed rocks, stakes, or sharp edges
Confirm the surface around the equipment is tidy and not slippery

If the ground settles after the first few weeks, top up and recompact early before the tilt becomes worse.

Common Mistakes to Avoid

1.Using topsoil as fill

It settles, stays soft, and becomes muddy. Always use compactable base material under the equipment area.

2.Skipping compaction in layers

Dumping 100–150 mm all at once and compacting only the top leads to future settlement.

3.Ignoring drainage

A level pad without drainage planning often turns into a puddle after rain.

4.Setting out too small an area

Not allowing extra room around the trampoline or play set makes installation and maintenance harder.

5.Not checking services first

Backyard service strikes are more common than people think. Always use 📞 Dial Before You Dig (1100) before excavating.

Pro Tips

Use a laser level if possible. It is much faster and more accurate than relying on a string line alone, especially if the yard has more than 50 mm of fall.
Strip all organic material first. Grass roots, old mulch, and soft topsoil are the main reasons backyard pads settle later.
For clay sites, geotextile is cheap insurance. It separates the base from the clay and improves long-term performance.
Hire smart. For most homeowners, hire a plate compactor and, if needed, a 1.7 t mini excavator for the weekend. Buying only makes sense if you will reuse the machine regularly. Anything over $20,000 is usually contractor territory, and that’s where finance through Ding Financial may be worth considering.
Build slightly larger than the equipment footprint. An extra 150–300 mm around the perimeter gives you cleaner edges and easier future maintenance.

Recommended Tools

Wacker Neuson or Weber MT plate compactor, 60–90 kg — ideal for compacting backyard base material properly
1.7 t mini excavator with 300 mm bucket and mud bucket — best hire option for cut-and-fill jobs with more than 100 mm of level difference
Topcon or Spectra laser level kit — accurate set-out and finished height control
Dingo / mini loader with 4-in-1 bucket — useful for larger play areas, moving spoil, and spreading base quickly

Frequently asked questions

What is the best base material for levelling ground under a trampoline or play area in Australia?
The best base material for levelling ground under a trampoline or play area in Australia is a well-compacting aggregate like DGB20 (Dense Graded Base, 20mm minus) or crushed rock. These materials offer excellent stability, drainage, and compaction properties, preventing settlement and ensuring a firm, safe surface for play equipment that complies with local council recommendations for hardstand bases.
How deep should the compacted base be for a trampoline or kids' play area?
For a stable and durable base for a trampoline or kids' play area, aim for a compacted depth of at least 100-150mm using suitable aggregate. This depth provides adequate structural support and prevents future settlement, especially when compacted in 50-75mm layers with a Wacker Neuson BS50-2 plate compactor, ensuring long-term stability for equipment like a Vuly Ultra trampoline.
What Australian safety standards apply to levelling ground for children's play equipment?
While there isn't a specific Australian Standard solely for ground levelling for domestic play equipment, AS 4685.0:2017 (Playgrounds and playground equipment – General safety requirements and test methods) outlines general safety principles. Ensuring a level, stable, and well-drained surface free from trip hazards is crucial for meeting these broader safety objectives and preventing injuries, particularly around equipment like a Springfree trampoline.
How do I ensure proper drainage when levelling ground for a play area?
To ensure proper drainage when levelling ground for a play area, establish a slight fall of 1-2% (e.g., 10-20mm per metre) away from the centre or primary structure, directing water to a suitable run-off area or ag-pipe system. This prevents water pooling, which can lead to muddy conditions, equipment instability, and mosquito breeding, protecting your investment in a Plum Play swing set.
What is the recommended compaction method for a stable trampoline base?
The recommended compaction method for a stable trampoline base involves compacting the chosen aggregate (e.g., DGB20) in layers of no more than 75mm using a plate compactor, such as a Wacker Neuson BS50-2 or similar 60kg model. Each layer should be moistened slightly before compaction to achieve optimal density and prevent future settlement, ensuring the base can support dynamic loads from jumping.
Can I use a hand tamper instead of a plate compactor for small areas?
Yes, a Trojan hand tamper can be used for very small areas or tight corners (e.g., less than 1 square metre) where a plate compactor cannot reach, but it requires significantly more effort and may not achieve the same consistent compaction density. For areas larger than 1 square metre, a hired plate compactor is strongly recommended for superior and more consistent results, crucial for a long-lasting base.
What Australian standard applies to the fall zone around domestic play equipment?
While there isn't a specific Australian Standard solely for domestic fall zones, AS 4685.0:2017 (Playgrounds and playground equipment – General safety requirements and test methods) provides general safety principles. This standard recommends a clear, impact-absorbing fall zone around equipment, free from obstructions, to minimise injury risk. For specific dimensions, always consult the play equipment manufacturer's instructions, such as those provided by Vuly or Springfree.
How do you calculate the amount of road base needed for a level pad?
To calculate the amount of road base, multiply the length by the width of the area by the desired compacted depth, then add 10-15% for compaction. For example, a 4m x 4m pad at 0.15m compacted depth requires (4m x 4m x 0.15m) 1.15 = approximately 2.76 cubic metres of DGB20. This calculation ensures sufficient material after compaction with a Wacker Neuson BS50-2 plate compactor.
What is the recommended moisture content for compacting road base in Australia?
The recommended moisture content for compacting road base, such as DGB20, is typically between 6-10% of its dry weight, known as 'optimum moisture content'. According to general civil engineering practices in Australia, this allows for maximum compaction density. Applying water with a garden hose and allowing it to soak in for 30-60 minutes before using a plate compactor like the Wacker Neuson BS50-2 is a common method to achieve this.

Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.