How to Plan a Backyard Landscaping Project

Learn how to plan a backyard landscaping project in Australia. Step-by-step design guide covering site analysis, drainage, zoning, hardscaping, and permits.

Quick answer

Planning an Australian backyard landscape involves conducting a site analysis, mapping existing utilities through Before You Dig Australia, and designing functional zones to scale on graph paper. Drainage slopes must direct water away from footings in accordance with building codes, while retaining walls exceeding one metre require engineered structural compliance.

Skill level
Beginner
Time
2-4 hours planning
Trade
Earthmoving & Landscaping
Updated
28 November 2026

Tools you will need

  • Lufkin 30m Pro Series Fibreglass Long Tape Measure
  • Stabila 1200mm Type 80 AS-2 Double Plumb Spirit Level
  • Nylex 30m Heavy Duty Garden Hose (for visualising curved layout lines)
  • Spear & Jackson Traditional Border Spades and Soil Probes
  • Sperian By Honeywell Class 5 Ear Protection & Safety Glasses
  • Empire 300mm Combination Square and Metric Graph Paper

What is involved in planning a backyard landscaping project?

Design a complete backyard landscape plan including zones, levels, drainage, planting, and hardscaping.

This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.

Skill Level: Beginner | Estimated Time: 2-4 hours planning

How should you prepare before starting a backyard landscaping plan?

Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.

Read through the entire guide first so you understand the full scope of work
Gather all tools and materials listed below before you begin
Check weather conditions if working outdoors -- avoid starting if rain is forecast within your estimated time window
If working near existing structures, check for electrical cables, plumbing, and gas lines before cutting or drilling
Ensure you have adequate lighting in your work area
Wear appropriate PPE: safety glasses, hearing protection, gloves, and steel-cap boots where required

What tools are essential for planning a backyard landscaping project?

Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.

Tape measure (30m) -- Essential for this project. Check your existing kit before purchasing.
Graph paper -- Essential for this project. Check your existing kit before purchasing.
Camera -- Essential for this project. Check your existing kit before purchasing.
Spirit level -- Essential for this project. Check your existing kit before purchasing.
Garden hose (for layout) -- Essential for this project. Check your existing kit before purchasing.

Step-by-Step Guide

Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.

Step 1: Survey your yard: measure dimensions, note slopes and drainage

This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.

Step 2: Photograph existing conditions from multiple angles

With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.

Step 3: Draw a base plan to scale on graph paper

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 4: Identify zones: entertaining, play, garden, utility, access

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 5: Plan for drainage: water must flow away from house and not pool

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 6: Mark existing services (call 1100 for underground)

You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.

Step 7: Choose a style: native, coastal, contemporary, cottage

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 8: Plan hardscape first: paths, patios, retaining walls

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 9: Select plants suited to your climate zone and soil type

Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.

Step 10: Create a staged implementation plan to manage budget

This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.

Safety Notes

Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.

Call 1100 before any digging to locate services -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Check council requirements for retaining walls and structures -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Avoid planting large trees near house foundations -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.
Ensure adequate drainage to prevent damp issues -- Do not skip this precaution. The consequences of ignoring safety measures range from minor injury to life-threatening situations.

Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.

Pro Tips from the Trade

These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.

Tip 1: Use a garden hose to lay out curved edges before committing. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 2: Group plants by water needs to simplify irrigation. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 3: Design for low maintenance unless you enjoy regular gardening. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.
Tip 4: Install irrigation during hardscape phase to avoid rework. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.

Common Mistakes to Avoid

Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.

Mistake 1: Not planning for drainage causing water pooling problems. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 2: Planting trees too close to foundations, pipes, or fences. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 3: Trying to do everything at once instead of staging. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.
Mistake 4: Not considering mature plant sizes when spacing. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.

Materials List

Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.

Graph paper and coloured pencils -- Confirm grade and specifications match the requirements described in the steps above.
30m tape measure -- Confirm grade and specifications match the requirements described in the steps above.
Soil test kit -- Confirm grade and specifications match the requirements described in the steps above.
Reference books for your climate zone -- Confirm grade and specifications match the requirements described in the steps above.

When to Call a Professional

While this guide covers a beginner-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:

If you encounter structural elements that you are not confident assessing
If the project requires council permits or engineering certification
If you discover hidden hazards such as asbestos, faulty wiring, or damaged plumbing
If the scope grows beyond what you originally planned

Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.

Frequently asked questions

Do I need council approval to landscape my backyard in Australia?
Council approval depends on the scale of your structural work and local planning schemes. In most Australian states, low-impact garden beds, turf, and small paved areas do not require permits. However, retaining walls over one metre in height, extensive earthworks, boundary fencing over 1.8 metres, and pergolas typically require development approval.
How do I check for underground pipes and cables before digging?
Lodging a free enquiry through Before You Dig Australia (BYDA) at byda.com.au or by calling 1100 is legally required before excavation. BYDA provides utility asset plans from telecommunications, gas, water, and power authorities within two business days. Positive utility location via vacuum excavation is recommended around critical infrastructure.
What is the best way to plan backyard garden drainage?
Backyard drainage planning requires falling finished surface levels away from the dwelling at a minimum 1:50 gradient. Incorporate subsoil French drains, agricultural pipe wrapped in geotextile fabric, or surface slot drains connected to the legal point of discharge. Never redirect overland stormwater flow onto neighbouring properties, in compliance with AS/NZS 3500.3.
What Australian standard applies to backyard retaining walls?
The primary Australian standard for retaining wall design and construction is AS 4678-2002 Earth-retaining structures. This standard specifies engineering parameters based on wall height, surcharge loads, soil classification, and drainage requirements. Timber retaining walls must also comply with AS 1604 for preservative-treated timber durability against fungal decay and termites.
How much does it cost to landscape a backyard in Australia?
Professional backyard landscaping in Australia typically costs between $50 and $150 per square metre for basic softscaping, while structural hardscaping ranges from $150 to $350 per square metre. Complete project budgets generally sit between $10,000 and $50,000, depending on retaining walls, paving materials, irrigation automation, and site access constraints.
How do I choose the right plants for an Australian backyard?
Select species matched to your specific microclimate, soil pH, and your region's plant hardiness zone. Grouping plants by complementary watering requirements—known as hydrozoning—maximises water efficiency under local council water restrictions. Native species such as Westringia, Lomandra, and Callistemon minimise maintenance requirements and establish quickly in harsh summer conditions.

Written by Digger, the Earthmoving & Landscaping specialist at VIC.Tools.