How to paint a bathroom
Painting a bathroom requires careful attention to surface preparation and the use of mould-resistant, durable paints to withstand high humidity and frequent moisture exposure. This guide will walk you through the process of achieving a professional, long-lasting finish in your bathroom, from prepara
- Skill level
- Intermediate
- Time
- 1-2 days (allowing for drying times)
- Trade
- Painting & Decorating
- Updated
- 28 November 2026
Tools you will need
- Drop sheets
- Painter's tape
- Sanding block or orbital sander
- Scraper or putty knife
- Caulking gun
- Paint brushes
- Paint rollers
- Roller tray
- Extension pole for roller
- Cleaning sponges and buckets
What is involved in painting a bathroom professionally?
Painting a bathroom requires careful attention to surface preparation and the use of mould-resistant, durable paints to withstand high humidity and frequent moisture exposure. This guide will walk you through the process of achieving a professional, long-lasting finish in your bathroom, from preparation to final coat.
What skill level is required for painting a bathroom in Australia?
Intermediate — Estimated time: 1-2 days (allowing for drying times)
What specific tools are required for painting a bathroom in Australia?
Drop sheets (canvas or plastic) Painter's tape (FrogTape or 3M ScotchBlue recommended) Sanding block or orbital sander (180-220 grit sandpaper) Scraper or putty knife Caulking gun Paint brushes (angled sash brush 50mm, cutting-in brush 38mm) Paint rollers (microfibre 10-12mm nap for walls, foam roller for trim) Roller tray Extension pole for roller Cleaning sponges and buckets Sugar soap (e.g., Selleys Sugar Soap) Microfibre cloths Stirring sticks Paint can opener LED work light (for inspecting surfaces)What materials are essential for painting a bathroom to Australian standards?
Mould killer/cleaner (e.g., Selleys Rapid Mould Killer) All-purpose filler/spackle (e.g., Polyfilla) Gap filler/flexible sealant (e.g., Selleys No More Gaps) Primer/sealer (e.g., Dulux Precision Maximum Strength Adhesion Primer or Taubmans 3 in 1 Prep) - 1L per 10m² Bathroom-specific paint (e.g., Dulux Wash&Wear +Plus Kitchen & Bathroom or Taubmans Easycoat Kitchen & Bathroom) - 1L per 12-16m² per coat (estimate 2-3 coats) Trim paint (e.g., Dulux Aquanamel Semi-Gloss or Taubmans Water Based Enamel) - 1L per 14-16m² per coat (estimate 2 coats) Clean ragsWhat safety precautions are mandatory when painting a bathroom in Australia?
Ventilation: Ensure adequate ventilation by opening windows and using exhaust fans. Respiratory Protection: Wear a P2 respirator mask, especially when sanding or using mould killers. Eye Protection: Safety glasses are essential to protect against splashes and dust. Gloves: Chemical-resistant gloves when handling mould killers and paint. Lead Paint: If your home was built before 1970, test for lead-based paint. Do not dry sand lead paint; use wet sanding techniques and professional lead paint removal if necessary. Ladder Safety: Use a stable step ladder for high areas.Step-by-Step Guide
Step 1: Prepare the Bathroom
Begin by removing all movable items from the bathroom, including towels, toiletries, and wall hangings. Cover the floor, vanity, toilet, and any fixtures you cannot remove with drop sheets. Use painter's tape to mask off areas you don't want to paint, such as around light fixtures, mirrors, and the edges of tiles. Ensure the tape is pressed firmly to create a crisp line.
Step 2: Clean and Treat Surfaces
Thoroughly clean all surfaces to be painted. Mix sugar soap according to manufacturer instructions and wash down walls, ceiling, and trim to remove grime, soap scum, and oils. Rinse thoroughly with clean water and allow to dry completely. For any visible mould, apply a mould killer/cleaner, following product instructions, and scrub with a brush. Rinse well and ensure the area is dry. This step is critical for paint adhesion and preventing mould regrowth.
Step 3: Repair and Fill Imperfections
Inspect all surfaces for cracks, holes, or imperfections. Use an all-purpose filler to patch small holes and cracks. For gaps around architraves, skirting boards, or where walls meet the ceiling, apply a flexible gap filler using a caulking gun. Smooth the filler with a wet finger or putty knife. Allow all fillers to dry completely according to manufacturer's instructions.
Step 4: Sand and Dust
Lightly sand all filled areas and any glossy surfaces (e.g., old enamel paint on trim) with 180-220 grit sandpaper. This creates a 'key' for the new paint to adhere to. For previously painted walls, a light scuff sand is often sufficient. After sanding, thoroughly wipe down all surfaces with a damp microfibre cloth to remove all dust. Dust is the enemy of a smooth paint finish.
Step 5: Apply Primer/Sealer
Apply one coat of a high-quality primer/sealer. For bathrooms, a primer with good adhesion and stain-blocking properties is recommended, especially if you're painting over dark colours or areas with water stains. Use an angled brush for cutting in around edges and a roller for larger wall and ceiling areas. Allow the primer to dry completely as per manufacturer's instructions (typically 2-4 hours). Coverage rate for most primers is around 10m²/L.
Step 6: Paint the Ceiling
Start with the ceiling. Using an angled brush, cut in around the perimeter of the ceiling where it meets the walls. Then, use a roller on an extension pole to apply the first coat of your chosen bathroom-specific ceiling paint. Roll in overlapping 'W' or 'M' patterns to ensure even coverage. Allow to dry completely. Apply a second coat if necessary, following the same technique.
Step 7: Paint the Walls
Once the ceiling is dry, move to the walls. Use your angled brush to cut in along the ceiling line, around windows, doors, and any masked-off fixtures. Then, use a roller to apply the first coat of your bathroom-specific wall paint. Work in sections, rolling from top to bottom in overlapping strokes. Aim for an even, consistent finish. Allow to dry completely (typically 2-4 hours). Apply a second coat, and a third if required for full opacity and durability. Most bathroom paints cover 12-16m²/L per coat.
Step 8: Paint the Trim
Finally, paint the trim (skirting boards, architraves, door frames). Use a high-quality angled sash brush for precision. Apply two thin, even coats of your chosen trim paint, allowing adequate drying time between coats. Water-based enamels are popular for trim due to their durability and easy cleanup.
Step 9: Final Inspection and Cleanup
Once all paint is dry (allow at least 24 hours for full cure before replacing items), carefully remove all painter's tape. Pull the tape off at a 45-degree angle to prevent paint from peeling. Inspect your work for any touch-ups. Clean brushes and rollers immediately with water (for water-based paints). Dispose of paint and materials responsibly according to local regulations.
Common Mistakes to Avoid
Pro Tips
Ventilation is Key: Keep the exhaust fan running during and after painting for several hours to aid drying and reduce fumes. Cut-in First: Always cut in around edges and corners before rolling the main surfaces. This ensures crisp lines and prevents roller marks near edges. Wet Edge Technique: Maintain a "wet edge" when rolling to avoid lap marks. Work quickly and overlap your strokes slightly. Inspect with Light: Use an LED work light to inspect surfaces for imperfections or missed spots before the paint dries.Recommended Tools
Frequently asked questions
- What is involved in paint a bathroom?
- Painting a bathroom requires careful attention to surface preparation and the use of mould-resistant, durable paints to withstand high humidity and frequent moisture exposure. This guide will walk you through the process of achieving a professional, long-lasting finish in your bathroom, from prepara
- What skill level do I need for paint a bathroom?
- Intermediate — Estimated time: 1-2 days (allowing for drying times)
- What are common mistakes when paint a bathroom?
- 1. Skipping Surface Preparation: Not cleaning, sanding, or filling properly leads to poor adhesion, uneven finishes, and mould regrowth. 2. Inadequate Drying Time: Rushing between coats or before reintroducing moisture can compromise paint durability and finish. 3. Using Non-Bathroom Specific Paint: Standard paints won't withstand the high humidity and moisture of a bathroom, leadin
- What tools do I need for paint a bathroom?
- This guide includes a comprehensive tools list. Key painting & decorating tools are detailed in the Tools Required section.
- What is the Australian standard for paint application in wet areas?
- The Australian standard for paint application in wet areas, including bathrooms, is primarily guided by AS/NZS 2311:2017 Guide to the Painting of Buildings. This standard outlines best practices for surface preparation, paint selection, and application techniques to ensure durability and mould resistance. Tradies should also consult local building codes for specific waterproofing requirements.
- How much does it cost to paint an average Australian bathroom?
- The material cost to paint an average Australian bathroom (approx. 6-8m² wall area) ranges from $150 to $300 for premium bathroom-specific paints and preparation materials. This estimate, based on 2025-26 pricing, includes mould killer, primer, and two coats of topcoat, but excludes labour costs.
- What type of respirator mask is recommended for bathroom painting in Australia?
- For bathroom painting in Australia, a P2 respirator mask is recommended, especially when sanding or using mould killers. According to AS/NZS 1716:2012 Respiratory protective devices, a P2 rating filters at least 94% of airborne particles, protecting against fine dusts and mists commonly encountered during painting tasks.
Written by Painter, the Painting & Decorating specialist at VIC.Tools.