How to paint an exterior brick house

Painting exterior brick can modernise a dated Australian home while providing additional protection from UV, rain and coastal exposure. The result is effectively permanent, so careful colour selection, moisture diagnosis and surface preparation are essential before applying a breathable exterior mas

Quick answer

Painting an exterior brick house in Australia involves cleaning at reduced pressure (1,800–2,500 psi), repairing mortar and efflorescence, priming porous areas, then applying a breathable masonry topcoat. Professional application costs $35–$70/m², and a single-storey home typically takes 4–7 days including preparation and drying time.

Skill level
Intermediate
Time
4–7 days for a typical single-storey house, including preparation and drying time
Trade
Painting & Decorating
Updated
6 November 2026

Tools you will need

  • Pressure washer rated around 1,800
  • Stiff nylon masonry brush and hand scrubbing brushes
  • 230
  • Quality 50
  • Extension pole, paint trays, buckets and roller grids
  • Cartridge caulking gun
  • Masonry filling knife and pointing tools
  • Heavy
  • Moisture meter suitable for masonry
  • Optional airless sprayer with a 517

🎨 How to Paint an Exterior Brick House

How do you paint an exterior brick house in Australia?

Painting exterior brick can modernise a dated Australian home while providing additional protection from UV, rain and coastal exposure. The result is effectively permanent, so careful colour selection, moisture diagnosis and surface preparation are essential before applying a breathable exterior masonry coating.

Expect DIY material costs of approximately $12–$25/m², increasing to $20–$35/m² where extensive repairs, sealing or access equipment are required. Professional application commonly costs around $35–$70/m², depending on access, brick condition and preparation.

What skill level and time are needed to paint exterior brick?

Intermediate — Estimated time: 4–7 days for a typical single-storey house, including preparation and drying time

What tools and equipment do you need to paint exterior brick?

🔧 Equipment Required

Pressure washer rated around 1,800–2,500 psi, used at reduced pressure with a wide fan tip
Stiff nylon masonry brush and hand scrubbing brushes
Paint scraper and wire brush for loose existing coatings only
230–270 mm roller frame with 20–25 mm masonry nap
Quality 50–75 mm synthetic cutting-in brush
Extension pole, paint trays, buckets and roller grids
Cartridge caulking gun
Masonry filling knife and pointing tools
Heavy-duty drop sheets and UV-resistant masking film
Moisture meter suitable for masonry
Stable platform ladder compliant with the AS/NZS 1892 series
Optional airless sprayer with a 517–521 tip, suitable for exterior acrylic coatings

🔧 Brush, roller or spray decision matrix

| Method | Best for | Advantages | Limitations |

|---|---|---|---|

| Brush | Edges, mortar joints and detailed areas | Excellent control and penetration | Slow for large elevations |

| Roller | Most DIY brick projects | Affordable, manageable and good coverage | Requires a long nap and firm back-rolling |

| Airless spray plus back-roll | Large or heavily textured elevations | Fast and reaches deep profiles | More masking, overspray risk and respiratory controls |

| Spray only | Generally not recommended for porous brick | Fast application | Can bridge pores without properly working paint into the surface |

Materials Required

Exterior masonry cleaner or sugar soap concentrate: approximately 1 L per 50–100 m², diluted to label directions
Mould treatment, such as 30 Seconds Outdoor Cleaner or Selleys Rapid Mould Killer, where required
Efflorescence remover designed for masonry, if white salt deposits are present
Masonry repair mortar for damaged joints and bricks
Exterior flexible sealant, such as Selleys No More Gaps Exterior or a paintable polyurethane sealant
Masonry primer or sealer:
Dulux PRECISION Sealer Binder for chalky or friable surfaces
Dulux AcraTex AcraPrime for suitable masonry systems
Taubmans 3 in 1 Prep where confirmed suitable by the product data sheet
Exterior topcoat:
Dulux Weathershield
Taubmans Sunproof
Wattyl Solagard
Allow approximately 6–10 m²/L per coat on rough brick, or 10–14 m²/L per coat on smoother, sealed masonry
Purchase enough paint for two full coats, plus approximately 10–15% extra for texture, touch-ups and wastage
UV-resistant exterior masking tape
Plastic masking film and canvas drop sheets
Test pots in the intended colours

A practical quantity calculation is:

Wall area in m² ÷ realistic coverage rate × number of coats = litres required

For example, 180 m² ÷ 8 m²/L × 2 coats = 45 L, plus wastage. Allow about 50 L in total.

Safety Requirements

⚠️ Safety

Test painted surfaces for lead before sanding, scraping or pressure washing homes built before 1970. Australian homes built through the early 1990s may also contain lead paint, so test any coating of uncertain age.
Do not dry-sand, grind or pressure-wash confirmed lead paint. Engage a suitably qualified lead-paint professional where necessary.
Wear safety glasses, chemical-resistant gloves, long sleeves and enclosed non-slip footwear.
Use a P2 respirator for dry preparation and a respirator selected for the coating and spray method when airless spraying. Respiratory equipment should comply with AS/NZS 1716 and be selected, fitted and maintained in accordance with AS/NZS 1715.
Wear eye protection complying with AS/NZS 1337.1.
Protect neighbours, vehicles, roofs, windows, landscaping, pools and stormwater drains from overspray and wash water.
Do not work from improvised platforms. Use compliant ladders only for short-duration work, and use scaffolding or an elevated work platform for high or difficult elevations.
Keep at least 4 m away from overhead powerlines unless the relevant electricity authority requires a greater exclusion distance.
Check product safety data sheets and follow AS/NZS 2311, the guide to painting buildings, along with each manufacturer’s written system requirements.
Do not paint over active rising damp, leaking gutters, failed flashings or wet masonry. Repair the moisture source first.

Step-by-Step Guide

Step 1: 1️⃣ Inspect the Brickwork and Confirm It Is Suitable

Walk around the entire building and identify:

Crumbling or fretting bricks
Loose or missing mortar
Efflorescence, visible as white salt deposits
Mould, algae or lichen
Rising damp or persistent dark patches
Leaking gutters, downpipes or flashings
Previous paint that is peeling, powdery or blistered
Silicone sealant that will not accept paint

Do not treat paint as a cure for dampness. Trapped moisture can cause blistering, salt movement and masonry deterioration.

New brickwork and mortar should generally cure for at least 28 days, or longer in cool or damp weather. Confirm the required curing period with the coating manufacturer.

If the brick is soft, historically significant, highly porous or affected by rising damp, obtain advice from a building specialist before painting. Painting heritage brick can reduce vapour movement and permanently alter its character.

Step 2: 2️⃣ Choose the Coating System and Colour

Select a premium, low-VOC, water-based exterior acrylic designed for masonry and harsh Australian UV exposure. Suitable options include Dulux Weathershield, Taubmans Sunproof and Wattyl Solagard.

Use a masonry primer or sealer where the brick is:

Bare and very porous
Chalky or friable
Unevenly repaired
Stained
Previously coated with an uncertain system
Affected by variable suction between brick and mortar

Choose exterior colours carefully. Light and mid-tone shades generally absorb less heat and can be more forgiving in strong Australian sun. Dark colours may increase surface temperature and highlight mortar texture or wall imperfections.

Apply test pots over at least 1 m² and inspect them in morning, midday and afternoon light. Popular modern schemes often combine warm white, soft grey or greige brickwork with darker trims, such as colours from the Dulux Natural White, Lexicon Quarter, Dieskau, Tranquil Retreat or Monument families.

Check colour suitability before using very dark shades on sealants, timber trims, PVC or other heat-sensitive materials.

Step 3: 3️⃣ Protect Adjacent Surfaces and Landscaping

Move vehicles, outdoor furniture and portable items well away from the work zone. Cover:

Windows and doors
Roof sheets and tiles
Fascias, gutters and downpipes not being painted
Paving, decking and concrete
Air-conditioning units
Exterior lights and cameras
Plants and garden beds
Neighbouring property exposed to overspray

Use canvas drop sheets on hard surfaces. Plastic can become slippery when wet.

Remove house numbers, downpipe clips, light fittings and other fixtures where safe and practical. Isolate electrical fittings before removal and use a licensed electrician where required.

Step 4: 4️⃣ Clean the Brick Thoroughly

Remove dust, cobwebs and loose material with a stiff nylon brush. Apply masonry cleaner according to its label, working from the bottom upward to reduce streaking.

Treat mould separately with a suitable mould-removal product. Killing the spores is important; simply pressure washing the visible staining may spread contamination without treating it.

Pressure wash using a wide fan tip and moderate pressure. Keep the nozzle approximately 300–500 mm from the surface and test an inconspicuous area first. Avoid forcing water into:

Mortar joints
Wall vents
Weep holes
Window and door junctions
Eaves
Cracked brickwork

Do not use maximum pressure on soft bricks or old mortar. Excessive cleaning pressure can permanently damage the masonry.

Allow the walls to dry for at least 48–72 hours in warm, dry conditions. Shaded, coastal or humid walls may need longer.

💡 Pro tip: Check the wall with a masonry moisture meter rather than judging by touch alone. Brick can appear dry at the surface while retaining moisture internally.

Step 5: 5️⃣ Remove Efflorescence and Unstable Coatings

Dry-brush efflorescence using a stiff nylon brush, then vacuum or sweep away the salts. If deposits return after cleaning, investigate the source of moisture before proceeding.

Use a proprietary efflorescence cleaner only where necessary and follow its neutralising and rinsing instructions. Avoid uncontrolled use of hydrochloric acid, which can damage mortar, stain brickwork and interfere with coating adhesion.

On previously painted brick, scrape all loose, flaking or blistered paint back to a firm edge. Feather sharp edges by sanding where safe to do so.

Perform an adhesion test on remaining paint by cutting a small cross-hatch pattern, applying strong tape and pulling it away sharply. Widespread coating removal indicates that professional stripping or specialist assessment may be required.

Step 6: 6️⃣ Repair Mortar, Cracks and Gaps

Rake out loose mortar to sound material and repoint with a compatible masonry mortar. Avoid using an excessively hard cement-rich mortar on soft or older bricks, as this can accelerate brick-face damage.

Replace badly damaged bricks where practical. Fill minor surface defects with an exterior masonry repair compound.

Use paintable exterior sealant around:

Window and door frames
Service penetrations
Junctions between dissimilar materials
Small movement-prone gaps

Do not seal functional weep holes, subfloor vents or designed drainage openings.

Allow cementitious repairs to cure as specified, commonly 3–7 days, before priming. Some repairs may require longer.

Step 7: 7️⃣ Prime or Seal the Masonry

Apply the selected masonry primer using a brush and long-nap roller. Work primer thoroughly into mortar joints, pits and textured brick faces.

For friable or powdery surfaces, use Dulux PRECISION Sealer Binder or another manufacturer-approved penetrating binder. For sound masonry, use the primer specified for the selected topcoat system.

Typical primer coverage is 6–10 m²/L on rough or porous brick, although highly absorbent brick may require considerably more. Follow the product data sheet rather than relying only on nominal coverage.

Allow approximately 2–4 hours recoat, or the period stated by the manufacturer. Cool temperatures, shade and high humidity will extend drying.

Do not leave missed pinholes or porous areas. These may show as dull patches in the final coating.

Step 8: 8️⃣ Apply the First Topcoat

Plan the work so each wall remains in shade where possible. Avoid painting:

In direct, intense midday sun
On hot masonry
Below the product’s minimum temperature
When rain, dew or frost is expected
During strong wind
When humidity is outside label limits

Cut in around windows, doors, eaves and edges with a 50–75 mm synthetic brush.

For roller application, use a 20–25 mm nap and work in sections approximately 1–2 m wide. Roll vertically, then cross-roll and finish consistently in one direction. Apply enough pressure to work paint into mortar lines without producing heavy runs.

For airless spraying, use a suitable 517–521 tip, adjust pressure to achieve a clean fan and immediately back-roll while the paint is wet. Spraying without back-rolling can leave weak coverage over deep brick texture.

Typical topcoat coverage is 6–10 m²/L per coat on rough brick. Allow 2–4 hours recoat, subject to the product label and weather.

Maintain a wet edge and complete whole architectural sections or elevations without stopping midway.

Step 9: 9️⃣ Apply the Second Topcoat

Inspect the dry first coat in raking sunlight. Look for:

Pinholes
Missed mortar joints
Thin patches
Roller holidays
Runs or sags
Uneven sheen

Correct defects before recoating. Apply the second coat using the same method and application direction.

Two full topcoats are normally required for colour uniformity, UV resistance and long-term durability. A heavily textured or contrasting substrate may need an additional coat.

Do not stretch the paint beyond its specified coverage. Over-spreading reduces film build and exterior service life.

Step 10: 🔟 Unmask, Inspect and Allow the Finish to Cure

Remove masking tape while the final coat is still slightly soft, pulling it back at approximately a 45-degree angle. Score the edge first if the paint has begun to bridge the tape.

Reinstall fixtures only after the coating is sufficiently dry. Keep ladders, furniture and hoses away from freshly painted walls.

Most premium acrylic coatings are touch dry in approximately 30–60 minutes and ready for 2–4 hours recoat, but full curing can take around 7 days or longer in cool or humid conditions.

Retain labelled leftover paint for maintenance. Record the brand, colour, sheen, batch details and application date.

Common Mistakes to Avoid

1.Painting over damp or salt-affected brick: This commonly causes blistering, peeling and recurring efflorescence.
2.Insufficient cleaning: Dirt, chalk, mould and atmospheric contamination prevent reliable adhesion.
3.Using excessive pressure washing: High pressure can erode mortar, damage brick faces and drive water into the building envelope.
4.Skipping primer on porous or unstable masonry: Uneven suction produces patchy sheen, poor coverage and premature failure.
5.Spraying without back-rolling: Paint may sit across the texture instead of penetrating pores and mortar joints.
6.Using interior paint or non-breathable products: Exterior masonry requires a compatible system with UV, water and vapour resistance.
7.Painting in direct hot sun: The coating may dry before it can level and bond correctly, creating lap marks and poor film formation.
8.Sealing weep holes: Blocking drainage or ventilation paths can trap moisture inside the wall cavity.

Pro Tips

💡 Pro tip: Surface preparation is 80% of the job. Cleaning, moisture correction, repairs and priming have more influence on durability than the speed of topcoat application.

💡 Pro tip: Work from the shaded side of the house and follow the sun. Cooler masonry gives better open time, penetration and lap-mark control.

💡 Pro tip: Box multiple paint cans together in a clean larger container. This blends minor batch variations and keeps the colour consistent across large elevations.

💡 Pro tip: Use a brush to stipple paint into deep mortar joints before rolling. This prevents visible pinholes and missed recesses.

💡 Pro tip: A low-sheen exterior finish is usually the most forgiving option for brick. Higher sheen levels can exaggerate uneven mortar, repairs and wall texture.

Recommended Tools

🔧 Recommended Tools

Purdy Colossus 230 mm, 20 mm nap roller sleeve — carries paint effectively into rough masonry profiles
Monarch Advance 63 mm synthetic brush — suitable for cutting in and stippling mortar joints
Graco Magnum airless sprayer — useful for larger homes when paired with immediate back-rolling
Tramex masonry moisture meter — helps confirm that brickwork is dry enough to coat
3M half-face respirator with suitable P2 or combination cartridges — provides correctly selected respiratory protection for preparation or spray application

Frequently asked questions

What is involved in paint an exterior brick house?
Painting exterior brick can modernise a dated Australian home while providing additional protection from UV, rain and coastal exposure. The result is effectively permanent, so careful colour selection, moisture diagnosis and surface preparation are essential before applying a breathable exterior mas
What skill level do I need for paint an exterior brick house?
Intermediate — Estimated time: 4–7 days for a typical single-storey house, including preparation and drying time
What are common mistakes when paint an exterior brick house?
1. Painting over damp or salt-affected brick: This commonly causes blistering, peeling and recurring efflorescence. 2. Insufficient cleaning: Dirt, chalk, mould and atmospheric contamination prevent reliable adhesion. 3. Using excessive pressure washing: High pressure can erode mortar, damage brick faces and drive water into the building envelope. 4. Skipping primer on porous or u
What tools do I need for paint an exterior brick house?
This guide includes a comprehensive tools list. Key painting & decorating tools are detailed in the Tools Required section.
How much does it cost to paint an exterior brick house in Australia?
DIY material costs for painting exterior brick in Australia typically range from $12–$25/m², rising to $20–$35/m² where significant repairs, sealing or access equipment are required. Professional application generally costs $35–$70/m², depending on access difficulty, brick condition and the number of coats applied.
Do you need to seal brick before painting it?
Yes, porous or untreated brick should be primed with a masonry sealer before topcoating. Skipping primer on porous brick is a common mistake that leads to uneven sheen, excessive paint absorption and premature coating failure, particularly on older or unpainted brickwork exposed to coastal or high-UV conditions.
What standard applies to ladders used for exterior house painting?
Platform ladders used for exterior painting should comply with the AS/NZS 1892 series for portable ladders, which sets construction, stability and load requirements. Using a non-compliant or damaged ladder on uneven ground is a recognised fall hazard under SafeWork Australia guidance for work at height.
Can you pressure wash brick before painting?
Yes, but at reduced pressure, typically around 1,800–2,500 psi with a wide fan tip, to clean dirt, chalk and mould without damaging mortar joints. Excessive pressure can erode brick faces and drive moisture into the wall cavity, causing blistering or efflorescence after painting.
How long does it take to paint a brick house exterior?
A typical single-storey Australian home takes 4–7 days to paint, including surface preparation, repairs, priming and drying time between coats. Larger homes, extensive repairs or unfavourable weather conditions can extend this timeframe considerably.

Written by Painter, the Painting & Decorating specialist at VIC.Tools.