How to clear a blocked stormwater drain
Clearing a blocked stormwater drain is a high-urgency drainage task that requires fast fault-finding, safe access, and the correct use of augers, high-pressure jetters, and CCTV inspection equipment. The objective is not just to restore flow, but to identify whether the blockage is caused by debris,
- Skill level
- Advanced
- Time
- 1-6 hours for clearing and inspection, longer if excavation or pipe repair is required
- Trade
- Plumbing
- Updated
- 28 November 2026
Tools you will need
- CCTV drain camera with self
- High
- Sectional auger or drum machine with cutters sized for 90
- Hose for controlled flushing and final flow testing
🔧 How to Clear a Blocked Stormwater Drain — Australian Trade Guide
What is involved in clearing a blocked stormwater drain?
Clearing a blocked stormwater drain is a high-urgency drainage task that requires fast fault-finding, safe access, and the correct use of augers, high-pressure jetters, and CCTV inspection equipment. The objective is not just to restore flow, but to identify whether the blockage is caused by debris, silt, roots, a belly, a broken section, or an outlet restriction at the legal point of discharge.
Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Works should be carried out in accordance with the PCA (NCC Volume Three) and relevant provisions of AS/NZS 3500.3 for stormwater drainage.
What skill level is required to clear a blocked stormwater drain?
Advanced — Estimated time: 1-6 hours for clearing and inspection, longer if excavation or pipe repair is required
What tools are required to clear a blocked stormwater drain?
Materials Required
Safety Requirements
Step-by-Step Guide
Step 1: 1️⃣ Make the site safe and confirm the overflow source
Attend the site and identify immediate risks to occupants, structures, and accessways. During storm conditions, first control surface water where possible to reduce further ingress into garages, subfloors, plant rooms, or habitable areas.
Confirm the reported issue is stormwater surcharge and not a sewer overflow. Check whether water is backing up from grated drains, pit lids, strip drains, downpipes, ag lines discharging into pits, or the legal point of discharge.
Set up barricades around flooded pits, slippery surfaces, and open grates. If there is any risk of water contacting electrical equipment, isolate power through the appropriate channels before commencing work.
Step 2: 2️⃣ Identify the system layout and likely blockage zone
Establish the stormwater line path from upstream collection points to the legal point of discharge. Review site plans if available and locate all downpipes, pits, inspection openings, charged lines, rainwater tank overflows, and discharge points to kerb, inter-allotment drainage, easement line, or on-site detention system.
Open the lowest accessible pit first. If that pit is full, move downstream toward the outlet. If it is clear, move upstream until you find the first pit with standing water. The blockage is typically between the last clear point and the first surcharged point.
Where layout is unclear, use the CCTV sonde and locator, or trace visible pipe alignments and surface depressions. In older sites, allow for undocumented alterations, broken junctions, and illegal tie-ins.
Step 3: 3️⃣ Open and clean access points
Remove pit lids, grates, leaf guards, and inspection caps carefully. Clear loose debris by hand tools, scoop, or vacuum before introducing rods or jetting equipment.
If pits are silted, vacuum or shovel out accumulated sediment so you can see inlet and outlet invert levels. This is critical for distinguishing a line blockage from a silted pit, a downstream surcharge, or a failed outlet.
Check for obvious restrictions such as:
Step 4: 4️⃣ Establish a pilot opening with rods or auger
For short runs or soft blockages, rod the line from the downstream side toward the obstruction. For heavier debris, roots, or compacted silt, use a sectional auger or drum machine sized for the pipe diameter.
Use the least aggressive head first to avoid damaging older PVC, thin-wall pipe, corrugated pipe, or brittle earthenware sections. A pilot hole through the blockage allows initial relief and improves jetter effectiveness.
If the tool repeatedly hangs at the same distance, suspect:
Do not force the machine if pipe failure is likely. Escalate to CCTV inspection if resistance is abnormal or the pipe material is unknown.
Step 5: 5️⃣ Jet the line correctly from the downstream access
Set up the jetter at the most suitable downstream access point so debris can be drawn back or flushed toward a controlled discharge location. For most blocked stormwater lines, work upstream from the downstream pit to break and mobilise debris, then perform a final downstream flush to the outlet.
Select the nozzle to suit the obstruction:
Advance the hose steadily, not aggressively. Let the nozzle work rather than forcing it. Withdraw in controlled passes to bring debris back to the pit for removal. Repeat until the line runs free and the return water is substantially cleaner.
For charged or surcharged systems, monitor upstream pits while jetting. If water levels rise suddenly, stop and reassess to avoid property flooding or hose entrapment.
Step 6: 6️⃣ CCTV inspect the full run after flow is restored
Once the line is open, perform a CCTV inspection from upstream to downstream or vice versa depending on access and line condition. Record the full run, note defect positions by metre count, and locate defects from the surface using the sonde.
Typical stormwater defects include:
A clear-flowing line can still be non-compliant or structurally defective. CCTV is the step that separates temporary relief from a proper diagnosis.
Step 7: 7️⃣ Repair or recommend rectification of the underlying defect
If CCTV shows a structural failure, point repair or replacement is generally required. Mark out the defect location, verify underground services, and excavate only after confirming depth and alignment.
Typical rectification works include:
Use compatible materials and fittings, and match the existing system standard where practicable. Reinstate bedding and backfill properly to avoid repeat settlement.
Step 8: 8️⃣ Flush, test, reinstate, and document the job
Run a controlled hose or water test from the highest upstream inlet or downpipe. Confirm the line drains freely through each pit and discharges correctly at the legal point of discharge without backing up.
Remove all debris from pits and site surfaces. Refit grates, lids, leaf guards, and caps securely. Reinstate landscaping, paving, or soft ground where disturbed.
Document:
For strata, commercial, or insurance-related work, provide a concise report identifying whether the issue was maintenance, storm loading, or asset failure.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What is involved in clear a blocked stormwater drain?
- Clearing a blocked stormwater drain is a high-urgency drainage task that requires fast fault-finding, safe access, and the correct use of augers, high-pressure jetters, and CCTV inspection equipment. The objective is not just to restore flow, but to identify whether the blockage is caused by debris,
- What skill level do I need for clear a blocked stormwater drain?
- Advanced — Estimated time: 1-6 hours for clearing and inspection, longer if excavation or pipe repair is required
- What are common mistakes when clear a blocked stormwater drain?
- 1. Starting with aggressive root cutting or heavy augering before confirming pipe material and condition, resulting in avoidable pipe damage. 2. Clearing the blockage without CCTV inspection, then missing a broken section, belly, or displaced joint that causes the line to block again. 3. Jetting from the wrong access point and pushing debris further into the system instead of retrieving or flush
- What tools do I need for clear a blocked stormwater drain?
- This guide includes a comprehensive tools list. Key plumbing tools are detailed in the Tools Required section.
- What is the Australian standard for stormwater drainage?
- The Australian standard for stormwater drainage is AS/NZS 3500.3:2021, 'Plumbing and drainage - Stormwater drainage'. This standard outlines requirements for design, installation, and materials to ensure effective and safe stormwater management. For tradies in Queensland, additional requirements are specified by the Queensland Plumbing and Wastewater Code.
- Do I need a license to clear a blocked stormwater drain in Australia?
- Yes, in Australia, clearing a blocked stormwater drain that involves working on permanent plumbing infrastructure requires a licensed plumber. According to state and territory plumbing regulations, unlicensed work can result in fines and void insurance. Always verify local licensing requirements before undertaking such work.
- What PPE is recommended for clearing blocked stormwater drains?
- Recommended PPE for clearing blocked stormwater drains includes waterproof gloves, gumboots, eye protection, hearing protection, high-visibility clothing, and rain gear. According to SafeWork Australia guidelines, a P2 respirator may also be necessary if dealing with contaminated silt or sewage, to protect against airborne hazards.
Written by Pipey, the Plumbing specialist at VIC.Tools.