How to Conduct a Plumbing Rough-In for a New Build
This guide details the process of conducting a plumbing rough-in for a new build bathroom in Australia. This critical stage involves installing all concealed pipework for water supply, drainage, and gas (if applicable) before walls are closed up and floors are laid. Proper planning and execution are
- Skill level
- Intermediate
- Time
- 1-3 days (depending on bathroom size and complexity)
- Trade
- Plumbing
- Updated
- 29 November 2026
Tools you will need
- Pencil/Marker: For marking pipe runs and cut lines.
- Pipe Cutters:
- Copper Pipe Cutter: 15mm to 25mm capacity.
- PEX Pipe Cutter: Ratchet
- PVC Pipe Cutter: Ratchet
- Deburring Tool: For copper and PVC pipes.
- Crimping Tool/Press
- Propane Torch/Blowtorch: For copper soldering
- Pipe Benders: For copper pipe
- Drill: Cordless or corded, with various spade bits
What is a plumbing rough-in for a new build bathroom?
This guide details the process of conducting a plumbing rough-in for a new build bathroom in Australia. This critical stage involves installing all concealed pipework for water supply, drainage, and gas (if applicable) before walls are closed up and floors are laid. Proper planning and execution are essential to ensure compliance with the Plumbing Code of Australia (PCA) and AS/NZS 3500 series, preventing costly rework and future issues.
What skill level is required for a plumbing rough-in?
Intermediate — Estimated time: 1-3 days (depending on bathroom size and complexity)
What tools are essential for a plumbing rough-in?
Tape Measure: 8m or 10m for accurate pipe runs and fixture set-outs. Spirit Level: 600mm and 1200mm for ensuring correct fall on drainage and level pipe runs. Pencil/Marker: For marking pipe runs and cut lines. Pipe Cutters: Copper Pipe Cutter: 15mm to 25mm capacity. PEX Pipe Cutter: Ratchet-style for clean cuts. PVC Pipe Cutter: Ratchet-style or hacksaw with fine-tooth blade. Deburring Tool: For copper and PVC pipes. Crimping Tool/Press-Fit Tool: Specific to the chosen pipe system (e.g., PEX crimp tool, copper press-fit tool). Propane Torch/Blowtorch: For copper soldering (if applicable). Soldering Mat/Heat Shield: For fire safety during soldering. Pipe Benders: For copper pipe (15mm, 20mm, 25mm). Drill: Cordless or corded, with various spade bits (20mm to 65mm) and hole saws (50mm to 100mm) for timber studs and floor joists. Reciprocating Saw: For cutting larger openings or removing obstructions. Shovel/Trowel: For trenching if required for under-slab drainage. Caulking Gun: For fire-rated sealant around penetrations. Adjustable Spanners/Wrenches: Various sizes. Safety Glasses, Gloves, Hearing Protection: Essential PPE.What materials are needed for a plumbing rough-in?
Water Supply Pipe: PEX Pipe: 16mm, 20mm, 25mm (red for hot, blue for cold, white/black for general). Copper Pipe: 15mm, 20mm, 25mm (Type B or C, hard drawn or annealed). Fittings: Brass or DZR (Dezincification Resistant) copper fittings for PEX (crimp/press) or copper (solder/press). Drainage Pipe: PVC DWV Pipe: 40mm, 50mm, 65mm, 80mm, 100mm (AS/NZS 1260). Fittings: PVC DWV fittings (bends, junctions, reducers, access points). Pipe Clips/Brackets: Appropriate for pipe type and size (15mm, 20mm, 25mm, 40mm, 50mm, 100mm). Lagging/Insulation: For hot water pipes (15mm, 20mm, 25mm) and cold water pipes in specific areas (e.g., roof spaces). Fire-Rated Sealant: For penetrations through fire-rated walls/floors. Primer and Solvent Cement: For PVC DWV pipe joints (AS/NZS 3879). Thread Seal Tape/Pipe Dope: For threaded connections. Temporary Caps/Plugs: For sealing open pipe ends during construction. Nails/Screws: For securing pipe clips and timber noggins. Timber Noggins: For supporting pipework within walls. Temporary Shut-off Valves: For testing purposes.Safety Requirements
⚠️ Always wear appropriate Personal Protective Equipment (PPE): Safety glasses, gloves, hearing protection, and sturdy footwear. ⚠️ Hot Work Safety: When soldering, ensure a fire extinguisher is readily available, use a soldering mat, and clear combustible materials from the work area. ⚠️ Electrical Safety: Be aware of live electrical wiring when drilling or cutting. Isolate power if working near existing electrical services. ⚠️ Structural Integrity: Do not compromise structural timber (studs, joists) by drilling oversized holes or notching without engineering approval. Follow AS/NZS 3500.1 for notching and drilling limits. ⚠️ Confined Spaces: Ensure adequate ventilation when working in confined spaces, especially when using solvent cements or soldering. ⚠️ Manual Handling: Use proper lifting techniques when handling heavy pipes or tools. ⚠️ Gas Safety: If gas lines are being roughed in, ensure all work is performed by a licensed gas fitter. Never attempt gas work without the correct licence.Step-by-Step Guide
Step 1: 📏 Plan and Mark Out
1️⃣ Review Plans: Carefully study architectural and plumbing plans to understand the layout of fixtures (toilet, shower, basin, bath), pipe runs, and connection points. Confirm exact dimensions and set-outs with other trades (e.g., cabinet makers, tilers).
2️⃣ Mark Fixture Locations: Use a tape measure and marker to accurately mark the centre lines and rough-in heights for all fixtures on the studs and floor. This includes shower mixers, basin taps, toilet cisterns, and bath outlets.
3️⃣ Map Pipe Runs: Sketch out the proposed water supply and drainage pipe runs on the studs and floor, considering minimum fall requirements for drainage and avoiding structural elements. Plan for future access points where necessary.
4️⃣ Identify Penetrations: Mark all locations where pipes will penetrate studs, floor joists, or slabs.
Step 2: 💧 Install Under-Slab Drainage (If Applicable)
1️⃣ Excavate Trenches: If the build is on a slab, excavate trenches for the main sewer line and branch lines to each fixture, ensuring the correct fall (typically 1:60 to 1:100 for 100mm pipes, 1:50 for 50mm pipes).
2️⃣ Lay Drainage Pipe: Assemble PVC DWV pipes and fittings, ensuring all joints are primed and solvent-cemented correctly. Install inspection openings and access points as per AS/NZS 3500.2.
3️⃣ Connect to Main Sewer: Connect to the main sewer line or boundary trap.
4️⃣ Pressure Test: Conduct a preliminary water or air pressure test on the under-slab drainage before backfilling to check for leaks.
5️⃣ Backfill: Carefully backfill trenches, ensuring pipes are not damaged.
Step 3: 🚿 Rough-In Drainage Within Walls and Floors
1️⃣ Drill/Cut Openings: Drill appropriate size holes through studs and joists for drainage pipes. Ensure holes are within structural limits (AS/NZS 3500.1).
2️⃣ Install Vertical Stacks: Run vertical PVC DWV stacks for toilets (100mm), showers (50mm), basins (40mm), and baths (40mm or 50mm). Ensure correct fall on horizontal runs.
3️⃣ Install Traps and Vents: Incorporate P-traps or S-traps (where permitted) for fixtures and connect to vent pipes as required by AS/NZS 3500.2 to prevent siphonage.
4️⃣ Secure Pipework: Use appropriate pipe clips and brackets to secure drainage pipes firmly to studs and joists, preventing movement and noise. Install timber noggins for additional support where needed.
5️⃣ Stub-Outs: Leave appropriate stub-outs for future fixture connections, ensuring they are capped or plugged temporarily.
Step 4: 🌡️ Rough-In Water Supply Lines
1️⃣ Drill/Cut Openings: Drill holes through studs and joists for water supply pipes, ensuring they are separate from drainage lines and within structural limits.
2️⃣ Run Hot and Cold Lines: Install hot (red PEX or copper) and cold (blue PEX or copper) water lines from the main supply point to each fixture location.
3️⃣ Install Stopcocks/Isolation Valves: Plan for isolation valves for individual fixtures (e.g., toilet, basin) or zones, if specified.
4️⃣ Connect Fittings: Use appropriate fittings (crimp, press-fit, or soldered) for the chosen pipe material. Ensure all connections are watertight and secure.
5️⃣ Secure Pipework: Use pipe clips and brackets to secure water supply lines, preventing vibration and noise. Ensure pipes are adequately supported.
6️⃣ Insulate Hot Water Lines: Lag all hot water pipes with appropriate insulation to conserve energy and meet PCA requirements. Consider insulating cold lines in specific areas to prevent condensation.
7️⃣ Stub-Outs: Leave sufficient pipe length as stub-outs for future fixture connections, ensuring they are capped or plugged.
Step 5: 🔥 Rough-In Gas Lines (If Applicable)
1️⃣ Consult Licensed Gas Fitter: Plumbing work in Australia must be performed by a licensed plumber. Gas fitting requires a separate, specific gas fitter licence. This step must be performed by a qualified and licensed gas fitter.
2️⃣ Run Gas Lines: Install gas lines (e.g., copper, HDPE) from the meter to appliance locations (e.g., gas hot water unit, cooktop).
3️⃣ Install Valves: Incorporate isolation valves at the appliance and main supply.
4️⃣ Pressure Test: Conduct a gas pressure test as per AS/NZS 5601.1 to ensure system integrity.
5️⃣ Secure and Protect: Secure gas lines and protect them from damage.
Step 6: 🧪 Pressure Testing and Inspection
1️⃣ Water Pressure Test: Once all water supply lines are roughed in and capped, fill the system with water and pressurise it to the required test pressure (typically 1.5 times the working pressure, or as per local authority requirements, e.g., 1500 kPa for 30 minutes). Inspect all joints for leaks.
2️⃣ Drainage Test: Fill drainage lines with water to the highest fixture outlet or a specified level and hold for a period (e.g., 15 minutes) to check for leaks.
3️⃣ Council/Authority Inspection: Arrange for the local plumbing authority (e.g., NSW Fair Trading, VIC VBA, QLD QBCC, WA Building Commission) to inspect the rough-in before walls are closed up and floors are laid. This is a mandatory step for compliance.
4️⃣ Documentation: Keep detailed records of all tests and inspections.
Step 7: 🚧 Prepare for Wall Closure
1️⃣ Final Checks: Double-check all pipework for correct alignment, security, and compliance with plans and standards.
2️⃣ Fire Stopping: Apply fire-rated sealant around any pipe penetrations through fire-rated walls or floors.
3️⃣ Temporary Protection: Ensure all open pipe ends are securely capped or plugged to prevent debris ingress.
4️⃣ Coordinate with Other Trades: Communicate with carpenters, electricians, and plasterers regarding pipe locations and any specific requirements.
Common Mistakes to Avoid
Pro Tips
💡 Measure Twice, Cut Once: Always double-check your measurements before cutting pipes to minimise waste and errors. 💡 Pre-Fabricate Where Possible: Assemble sections of pipework on the ground before installation to save time and ensure accuracy. 💡 Use Colour-Coded PEX: Utilise red for hot and blue for cold PEX to easily identify lines and prevent cross-connections. 💡 Plan for Future Fixtures: Consider potential future additions (e.g., bidet, outdoor tap) and rough in capped lines for easier future expansion. 💡 Document Everything: Take photos of the rough-in before walls are closed. This can be invaluable for future maintenance or renovations. 💡 Water Efficiency: Advise clients on WELS star-rated fixtures during the selection process to promote water conservation. 💡 Noise Reduction: Wrap drainage pipes in acoustic lagging in critical areas (e.g., bedroom walls) to reduce noise transmission.Recommended Tools
Frequently asked questions
- What is involved in conduct a plumbing rough-in for a new build?
- This guide details the process of conducting a plumbing rough-in for a new build bathroom in Australia. This critical stage involves installing all concealed pipework for water supply, drainage, and gas (if applicable) before walls are closed up and floors are laid. Proper planning and execution are
- What skill level do I need for conduct a plumbing rough-in for a new build?
- Intermediate — Estimated time: 1-3 days (depending on bathroom size and complexity)
- What are common mistakes when conduct a plumbing rough-in for a new build?
- 1. Incorrect Fall on Drainage: Leading to blockages and poor drainage. Always use a spirit level and ensure minimum fall requirements are met. 2. Compromising Structural Integrity: Drilling oversized holes or notching studs/joists without considering structural implications. Always adhere to AS/NZS 3500.1 guidelines. 3. Inadequate Pipe Support: Pipes not properly clipped or supporte
- What tools do I need for conduct a plumbing rough-in for a new build?
- This guide includes a comprehensive tools list. Key plumbing tools are detailed in the Tools Required section.
- What is involved in a plumbing rough-in for a new build?
- A plumbing rough-in involves installing all concealed pipework for water supply, drainage, and gas (if applicable) before walls are closed up and floors are laid. This critical stage ensures compliance with the Plumbing Code of Australia (PCA) and AS/NZS 3500 series, preventing costly rework and future issues by establishing the foundational plumbing infrastructure.
- What skill level do I need for a plumbing rough-in?
- An intermediate skill level is required for a plumbing rough-in, as it demands a comprehensive understanding of plumbing principles, Australian Standards, and safety protocols. The estimated time for completion is typically 1-3 days, depending on the bathroom's size and complexity, and the experience of the tradesperson.
- What are common mistakes during a plumbing rough-in?
- Common mistakes include incorrect fall on drainage, compromising structural integrity by improper notching, and inadequate pipe support. According to AS/NZS 3500.1, pipes must be properly clipped and supported at specified intervals to prevent movement and ensure system longevity. Always consult the relevant AS/NZS standards.
- What is the Australian standard for plumbing installations?
- The primary Australian standard for plumbing installations is the AS/NZS 3500 series, which covers Water Services (AS/NZS 3500.1), Sanitary Plumbing and Drainage (AS/NZS 3500.2), and Heated Water Services (AS/NZS 3500.4). Compliance with these standards is mandatory under the Plumbing Code of Australia (PCA) for all new builds and renovations.