How to install a continuous flow hot water system

Learn how to install a continuous flow hot water system in Australia. Covers AS/NZS 5601.1 gas sizing, AS/NZS 3500.4 tempering valves, and commissioning.

Quick answer

Installing a continuous flow hot water system involves mounting the appliance, upgrading gas pipework to deliver adequate megajoule capacity, connecting cold water supply with isolation and non-return valves, and fitting a compliant tempering valve. Work must be completed by a licensed trade professional to satisfy AS/NZS 5601.1 and AS/NZS 3500.4 standards.

Skill level
Advanced
Time
4-8 hours for a like-for-like external replacement, 1-2 days where gas line upgrades, internal flueing, condensate drainage, or renovation alterations are required
Trade
Plumbing
Updated
28 November 2026

Tools you will need

  • Rothenberger ROCUT 42 - Copper Tube Cutter
  • Milwaukee M12 Force Logic - Press Tool with V-Profile Jaws
  • Testo 510 - Digital Manometer
  • Bahco 9072 - 250 mm Adjustable Wrench
  • Bosch GBH 18V-26 D - SDS Plus Rotary Hammer Drill
  • Stabila R-Type 600 mm - Spirit Level
  • Snoop Liquid - Gas Leak Detector Fluid

🔧 Continuous Flow Hot Water System Installation Guide

What is involved in installing a continuous flow hot water system in Australia?

Continuous flow hot water system installation is a high-value plumbing job that commonly involves appliance replacement, gas and water service upgrades, tempering compliance, and full commissioning. Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.

For Australian installations, work must comply with the PCA, AS/NZS 3500.1 (water services), AS/NZS 3500.4 (heated water services), AS/NZS 5601.1 (gas installations), AS/NZS 3000 (electrical where applicable), and the appliance manufacturer’s installation instructions.

What skill level is required for continuous flow hot water system installation?

Advanced — Estimated time: 4-8 hours for a like-for-like external replacement, 1-2 days where gas line upgrades, internal flueing, condensate drainage, or renovation alterations are required

What tools are essential for installing a continuous flow hot water system?

Gas manometer or digital gas pressure tester, suitable for appliance test point commissioning
Water pressure gauge with hose connection, 0-1600 kPa range
Copper tube cutters for 15 mm, 20 mm and 25 mm
Deburring tool and tube reamer
Press tool with jaws for approved copper or stainless press-fit system, or soldering/brazing kit where permitted by site conditions
PEX crimp or clamp tool if using approved PEX water services
Adjustable wrenches and Stillsons
Torque wrench for manufacturer-specified gas and water unions
Drill/driver and masonry bits for wall brackets and penetrations
SDS rotary hammer for brick or block mounting
Spirit level and tape measure
Leak detection fluid
Infrared thermometer or contact thermometer for delivery temperature verification
Multimeter or socket tester for checking existing supply point only; new electrical work by licensed electrician
Bucket, drain hose and wet vac for decommissioning and draining down
Flue hole saw/core drill kit for internal models where applicable
Pipe freezing kit or line stop equipment if isolation constraints require it and site conditions allow

Materials Required

1 x continuous flow hot water unit, correctly sized, typically 16 L/min, 20 L/min, 26 L/min or higher, LPG or natural gas to suit site supply
1 x manufacturer valve set or installation kit with hot/cold/gas isolation valves and unions
Copper water tube, typically 15 mm or 20 mm, to AS 1432 or approved multilayer/PEX system to AS/NZS 2492 / AS/NZS 2537 as applicable
Copper gas tube sized to load and run length, commonly 20 mm or 25 mm, to AS 1432 or other approved gas piping system to AS/NZS 5601.1
1 x tempering valve, commonly 20 mm, compliant with AS 4032.1, for bathroom sanitary fixtures where required under AS/NZS 3500.4
1 x pressure limiting valve, typically 500 kPa, where incoming pressure exceeds allowable limits or manufacturer specification
1 x line strainer/check valve set if required by manufacturer or site conditions
1 x condensate drain kit and neutraliser, if required, for condensing models
1 x approved flue kit for internal models, including terminal, bends and supports to manufacturer specification
1 x weatherproof power outlet nearby if required by the unit; final electrical installation by a licensed electrician
Pipe clips, saddles and stand-off brackets
UV-rated pipe insulation for external hot pipework
Wall anchors and corrosion-resistant fixings for substrate
Thread sealant approved for gas service and potable water applications
Identification tags, commissioning sheet and compliance documentation
Optional remote temperature controllers and communication cable
Optional gas meter/regulator upgrade components where load assessment identifies insufficient capacity

Safety Requirements

⚠️ Isolate gas, water and electrical supplies before commencing removal or installation.
⚠️ Gas work requires separate gas fitter licence and must comply with AS/NZS 5601.1 and local gas authority requirements.
⚠️ Hot water delivery temperatures can cause scalding. Bathroom outlets in Class 1 and Class 10 dwellings generally require delivery limited to 50°C under AS/NZS 3500.4.
⚠️ Confirm appliance location, terminal clearances, ventilation and flueing strictly to manufacturer instructions and the PCA.
⚠️ Condensing appliances require compliant condensate disposal using suitable corrosion-resistant materials and correct fall to drain.
⚠️ Check wall construction before drilling; identify electrical, gas and water services behind cladding or masonry.
⚠️ Test for existing asbestos-containing materials before disturbing old flue penetrations, eaves linings or backing boards in older properties.
⚠️ Use safe manual handling methods. Large continuous flow units and external recess boxes can be awkward in confined spaces.
⚠️ New or altered electrical outlets must be installed by a licensed electrician to AS/NZS 3000.
🔒 Plumbing requires a licensed tradesperson. State regulators include NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission. Issue any required compliance certificate or notice on completion.

Step-by-Step Guide

Step 1: 1️⃣ Confirm scope, appliance type and compliance pathway

Establish whether the job is a like-for-like replacement, an upgrade from storage to continuous flow, or part of a renovation rough-in.

Confirm:

Fuel type: natural gas or LPG
Appliance type: external, internal flued, or condensing
Required flow rate based on simultaneous demand
Existing gas meter capacity and regulator suitability
Existing hot water distribution layout and whether a tempering valve is already present
Location compliance, clearances, frost exposure and serviceability access

Review the manufacturer installation manual first. Continuous flow systems are proprietary appliances, and connection orientation, controller wiring, pressure ranges, flue systems and condensate requirements vary by brand.

💡 For typical Australian homes, 20 L/min to 26 L/min units are common where two bathrooms or simultaneous shower use is expected. Renovation projects with rain showers, wall outlets or bath fillers often require a larger capacity assessment.

Step 2: 2️⃣ Size the system and verify service capacities

Size the unit to actual demand, not just the existing system label.

Assess:

Simultaneous fixture demand in L/min
Incoming cold water temperature and winter temperature rise requirements
Gas load in MJ/h
Maximum available inlet pressure and dynamic flow
Appliance minimum ignition flow rate
Whether low-flow fixtures may affect burner activation

On gas upgrades, calculate pipe sizing to AS/NZS 5601.1 based on total connected load, equivalent length, fittings and allowable pressure drop. A storage-to-instantaneous changeover often requires upgrading from 15 mm gas tube to 20 mm or 25 mm, and in some cases a meter or regulator upgrade.

For water services, confirm pipe sizing to AS/NZS 3500.1. Where pressure is high, install a pressure limiting valve to protect the appliance and prevent nuisance discharge or unstable operation.

💡 Check showerheads and mixers for WELS ratings and actual flow. A 3 Star or 4 Star outlet with very low flow may require a unit with a low minimum activation rate or the use of temperature controllers to improve user experience.

Step 3: 3️⃣ Isolate services and remove the existing system

Turn off:

Cold water isolation
Gas isolation at the appliance and upstream point if required
Electrical supply to the unit or adjacent outlet if applicable

Drain down the existing heater and disconnect gas, hot and cold water services. Remove fixing brackets and safely dispose of the old appliance in accordance with site and waste requirements.

Inspect exposed services once the old unit is off the wall. This is the best time to identify undersized gas piping, corroded copper, non-compliant valves, missing lagging, inadequate supports, or poor prior workmanship.

Where replacing a storage unit, cap and reroute redundant drain lines, PTR connections or secondary returns as required by the new design.

Step 4: 4️⃣ Set out the new location and mount the appliance

Mark bracket locations to manufacturer dimensions and confirm clearances to windows, doors, eaves, mechanical intakes, boundaries and ignition sources. External unit terminal clearances are critical and must match both the manufacturer instructions and AS/NZS 5601.1.

Mount the unit plumb and level using corrosion-resistant fixings suitable for the wall substrate. On lightweight cladding, use proper backing or structural fixing points rather than fastening only to sheet material.

For internal models:

Install the approved flue system only
Maintain required clearances to combustibles
Support the flue to manufacturer spacing
Seal penetrations weather-tight
Confirm condensate provisions if the model is condensing

Do not interchange flue components between brands unless specifically approved.

Step 5: 5️⃣ Install or upgrade the gas service

Run or alter the gas line to suit the appliance input and required pressure. Use approved materials and jointing methods only.

Typical sequence:

Install the appliance gas isolation valve
Size gas piping correctly, commonly 20 mm or 25 mm for larger units or long runs
Minimise unnecessary elbows and restrictive fittings
Support the line at required intervals
Protect pipe through penetrations and where exposed to damage
Pressure test the altered gas line in accordance with AS/NZS 5601.1

If the available pressure or meter capacity is inadequate under full load, stop and arrange meter/regulator upgrade before commissioning. Do not commission a high-demand continuous flow unit on a marginal gas service.

💡 Winter breakdown upgrades frequently fail at commissioning because the heater has been selected correctly but the existing meter and 15 mm gas branch cannot deliver the required MJ/h under load.

Step 6: 6️⃣ Rough-in the cold, hot and temperature control components

Install the manufacturer valve kit or equivalent approved arrangement:

Cold isolation valve
Hot isolation valve
Gas isolation valve
Union connections for serviceability

Connect cold and hot water pipework using compliant materials. Common residential connections are 15 mm copper or approved PEX/multilayer, though larger branches may require 20 mm depending on design flow and pressure.

Install associated devices as required:

Pressure limiting valve where inlet pressure exceeds manufacturer limits
Line strainer if specified
Non-return or duo valve where required by local authority or design
Tempering valve on the heated water line serving bathroom sanitary fixtures

Set pipework to allow future servicing. Avoid tight offsets hard against the chassis. Leave enough clearance to remove filters, access service valves and disconnect unions.

For external units, insulate exposed hot pipework using UV-stable lagging and protect against frost where relevant.

Step 7: 7️⃣ Install flueing, condensate and electrical provisions where applicable

For internal continuous flow units, install the complete flue system exactly as specified. Room-sealed and fan-assisted appliances are not interchangeable in flue configuration.

For condensing units:

Connect the condensate drain in approved corrosion-resistant material
Maintain continuous fall to a suitable discharge point
Install any required neutraliser
Avoid cross-connection to unsuitable waste points
Protect the drain from freezing or mechanical damage

Where the appliance requires 240 V power, verify the presence of a suitable outlet in the correct location. Any new GPO or electrical alteration must be completed by a licensed electrician to AS/NZS 3000.

If fitting remote controllers, run communication cable in accordance with manufacturer instructions, keeping separation from power where required.

Step 8: 8️⃣ Connect the appliance and carry out pressure testing

Make final hot, cold and gas connections using the manufacturer’s unions, seals and torques where specified.

Then:

Open the cold water supply and purge air through fixtures
Check for leaks at all water joints and valve sets
Clean inlet strainers if site debris is suspected
Open the gas supply and perform leak testing on all gas joints
Verify standing and operating pressures at the appliance test point
Confirm gas inlet pressure under full appliance load meets manufacturer minimums

Do not rely on “no smell” as a gas test. Use a manometer and approved leak detection method.

If the job includes new pipework, record test results for compliance documentation and warranty support.

Step 9: 9️⃣ Commission the heater and set delivery temperatures

Start the appliance in accordance with the manufacturer procedure.

Commissioning checks should include:

Ignition sequence and stable burner operation
Water flow activation at low and normal draw-off rates
Correct outlet temperature at kitchen, laundry and bathroom fixtures
Tempering valve setpoint and stability
Controller operation and lockout settings if fitted
Fault code history or diagnostics on startup
Condensate discharge on condensing units
Flue terminal operation and fan performance on internal units

For most domestic installations, keep the heater and distribution compliant with AS/NZS 3500.4. Bathrooms generally require a maximum delivery temperature of 50°C. Kitchens and laundries may differ depending on fixture type and design intent, but confirm the application and local requirements before setting final temperatures.

💡 Where the appliance allows, many installers set the unit to 60°C and temper bathroom circuits to 50°C. This gives better appliance performance and flexibility, provided the system design and fixture arrangement are compliant.

Step 10: 🔟 Final checks, handover and documentation

Complete final checks on:

Appliance fixing integrity
Pipe support spacing
Sealed penetrations and weatherproofing
Clear service access
Labels, controller instructions and isolation valve identification
Lagging and protection of external pipework
Site cleanliness and disposal of old unit and packaging

Provide the client or builder with:

Compliance certificate or notice as required by the state regulator
Warranty documents
User guide for controller and maintenance
Recommended annual or periodic service interval
Advice on inlet filter cleaning, descaling in hard water areas, and frost precautions if relevant

Record model, serial number, gas type, commissioning pressures, delivery temperatures and any meter or regulator upgrades completed.

Common Mistakes to Avoid

1.Undersizing or failing to verify the gas service. A new 26 L/min unit on an old 15 mm branch is a common cause of ignition faults and poor performance.
2.Installing without confirming terminal clearances, internal flue requirements or service access. This can lead to non-compliance and costly rework.
3.Omitting or incorrectly setting the tempering valve. Heated water compliance to bathroom fixtures must align with AS/NZS 3500.4.
4.Ignoring inlet water pressure and dynamic flow. Excessive pressure, unstable flow or debris in the line can cause nuisance faults and poor temperature control.
5.Failing to provide compliant condensate drainage on condensing models. Improper discharge materials or poor fall can damage the appliance and surrounding building elements.

Pro Tips

Use the manufacturer’s full valve kit whenever possible. It speeds up future servicing, reduces call-back time and presents a cleaner installation.
On storage-to-instantaneous conversions, check meter capacity before you quote. It avoids variation disputes once the old unit is already removed.
Keep hot pipe runs as short as practical. Even with continuous flow, excessive dead leg length increases water wastage and customer dissatisfaction.
Match the heater to fixture performance, not brochure flow alone. Large baths, twin showers and WELS 3 Star outlets used simultaneously can still exceed a modest unit’s effective capacity in winter.
In hard water areas, recommend a service interval that includes inlet filter inspection and scale management. It protects heat exchanger life and maintains stable outlet temperatures.

Recommended Tools

Digital gas manometer — essential for commissioning inlet and operating gas pressures accurately
Ridgid or Rothenberger tube cutter set — fast, clean cuts on 15 mm, 20 mm and 25 mm copper
Milwaukee or Viega press tool kit — efficient for high-volume water service installs and tight plant locations
Water pressure test gauge with hose adaptor — confirms static and dynamic conditions before blame falls on the appliance
Flue gas leak detector spray / approved leak detection fluid — quick verification of gas tightness during final commissioning

Frequently asked questions

Can I install my own continuous flow hot water system in Australia?
No, homeowners cannot legally install a continuous flow hot water system in Australia. All gas fitting and plumbing work must be completed by a licensed plumber and gas fitter. Installations must comply with AS/NZS 5601.1 and AS/NZS 3500, requiring a compliance certificate upon completion.
What size gas pipe is required for a continuous flow hot water system?
Most continuous flow hot water systems require an upgraded 20 mm or 25 mm gas supply line rather than a standard 15 mm branch. High-capacity units consume between 160 and 200 megajoules per hour, meaning existing supply pipework often requires upsizing to prevent pressure drops and appliance lockout under peak load.
What are the clearance requirements for an outdoor continuous flow unit?
Continuous flow gas water heaters require minimum terminal clearances from openings under AS/NZS 5601.1. Flue terminals must be at least 300 mm from openable windows, doors, and external corners, 500 mm between mechanical air inlets, and 1,000 mm below eaves or open verandahs to prevent combustion gas ingress.
Is a tempering valve required on a continuous flow hot water system?
Yes, a tempering valve is mandatory under AS/NZS 3500.4 for continuous flow installations supplying sanitary fixtures. Unless the unit is factory pre-set and certified to deliver hot water at a maximum of 50°C, a calibrated tempering valve must be installed to protect users against scald injuries.
How do you test and commission a continuous flow hot water system?
Commissioning requires conducting a static and dynamic gas pressure test using a digital manometer to verify working pressure under full load. The installer must also confirm water supply pressure, test all joints with leak detection fluid, verify tempering valve delivery temperature, and submit a compliance certificate to the regulator.
Does a continuous flow hot water system need a power point?
Yes, standard external continuous flow gas hot water units require a 240-volt, 10-amp weatherproof electrical general power outlet within reach of the unit flex. The internal electronics, safety solenoids, digital controllers, and anti-frost heating elements depend on mains electrical power to operate safely.

Written by Pipey, the Plumbing specialist at VIC.Tools.