How to install a continuous flow hot water system
Learn how to install a continuous flow hot water system in Australia. Covers AS/NZS 5601.1 gas sizing, AS/NZS 3500.4 tempering valves, and commissioning.
Quick answer
Installing a continuous flow hot water system involves mounting the appliance, upgrading gas pipework to deliver adequate megajoule capacity, connecting cold water supply with isolation and non-return valves, and fitting a compliant tempering valve. Work must be completed by a licensed trade professional to satisfy AS/NZS 5601.1 and AS/NZS 3500.4 standards.
- Skill level
- Advanced
- Time
- 4-8 hours for a like-for-like external replacement, 1-2 days where gas line upgrades, internal flueing, condensate drainage, or renovation alterations are required
- Trade
- Plumbing
- Updated
- 28 November 2026
Tools you will need
- Rothenberger ROCUT 42 - Copper Tube Cutter
- Milwaukee M12 Force Logic - Press Tool with V-Profile Jaws
- Testo 510 - Digital Manometer
- Bahco 9072 - 250 mm Adjustable Wrench
- Bosch GBH 18V-26 D - SDS Plus Rotary Hammer Drill
- Stabila R-Type 600 mm - Spirit Level
- Snoop Liquid - Gas Leak Detector Fluid
🔧 Continuous Flow Hot Water System Installation Guide
What is involved in installing a continuous flow hot water system in Australia?
Continuous flow hot water system installation is a high-value plumbing job that commonly involves appliance replacement, gas and water service upgrades, tempering compliance, and full commissioning. Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.
For Australian installations, work must comply with the PCA, AS/NZS 3500.1 (water services), AS/NZS 3500.4 (heated water services), AS/NZS 5601.1 (gas installations), AS/NZS 3000 (electrical where applicable), and the appliance manufacturer’s installation instructions.
What skill level is required for continuous flow hot water system installation?
Advanced — Estimated time: 4-8 hours for a like-for-like external replacement, 1-2 days where gas line upgrades, internal flueing, condensate drainage, or renovation alterations are required
What tools are essential for installing a continuous flow hot water system?
Materials Required
Safety Requirements
Step-by-Step Guide
Step 1: 1️⃣ Confirm scope, appliance type and compliance pathway
Establish whether the job is a like-for-like replacement, an upgrade from storage to continuous flow, or part of a renovation rough-in.
Confirm:
Review the manufacturer installation manual first. Continuous flow systems are proprietary appliances, and connection orientation, controller wiring, pressure ranges, flue systems and condensate requirements vary by brand.
💡 For typical Australian homes, 20 L/min to 26 L/min units are common where two bathrooms or simultaneous shower use is expected. Renovation projects with rain showers, wall outlets or bath fillers often require a larger capacity assessment.
Step 2: 2️⃣ Size the system and verify service capacities
Size the unit to actual demand, not just the existing system label.
Assess:
On gas upgrades, calculate pipe sizing to AS/NZS 5601.1 based on total connected load, equivalent length, fittings and allowable pressure drop. A storage-to-instantaneous changeover often requires upgrading from 15 mm gas tube to 20 mm or 25 mm, and in some cases a meter or regulator upgrade.
For water services, confirm pipe sizing to AS/NZS 3500.1. Where pressure is high, install a pressure limiting valve to protect the appliance and prevent nuisance discharge or unstable operation.
💡 Check showerheads and mixers for WELS ratings and actual flow. A 3 Star or 4 Star outlet with very low flow may require a unit with a low minimum activation rate or the use of temperature controllers to improve user experience.
Step 3: 3️⃣ Isolate services and remove the existing system
Turn off:
Drain down the existing heater and disconnect gas, hot and cold water services. Remove fixing brackets and safely dispose of the old appliance in accordance with site and waste requirements.
Inspect exposed services once the old unit is off the wall. This is the best time to identify undersized gas piping, corroded copper, non-compliant valves, missing lagging, inadequate supports, or poor prior workmanship.
Where replacing a storage unit, cap and reroute redundant drain lines, PTR connections or secondary returns as required by the new design.
Step 4: 4️⃣ Set out the new location and mount the appliance
Mark bracket locations to manufacturer dimensions and confirm clearances to windows, doors, eaves, mechanical intakes, boundaries and ignition sources. External unit terminal clearances are critical and must match both the manufacturer instructions and AS/NZS 5601.1.
Mount the unit plumb and level using corrosion-resistant fixings suitable for the wall substrate. On lightweight cladding, use proper backing or structural fixing points rather than fastening only to sheet material.
For internal models:
Do not interchange flue components between brands unless specifically approved.
Step 5: 5️⃣ Install or upgrade the gas service
Run or alter the gas line to suit the appliance input and required pressure. Use approved materials and jointing methods only.
Typical sequence:
If the available pressure or meter capacity is inadequate under full load, stop and arrange meter/regulator upgrade before commissioning. Do not commission a high-demand continuous flow unit on a marginal gas service.
💡 Winter breakdown upgrades frequently fail at commissioning because the heater has been selected correctly but the existing meter and 15 mm gas branch cannot deliver the required MJ/h under load.
Step 6: 6️⃣ Rough-in the cold, hot and temperature control components
Install the manufacturer valve kit or equivalent approved arrangement:
Connect cold and hot water pipework using compliant materials. Common residential connections are 15 mm copper or approved PEX/multilayer, though larger branches may require 20 mm depending on design flow and pressure.
Install associated devices as required:
Set pipework to allow future servicing. Avoid tight offsets hard against the chassis. Leave enough clearance to remove filters, access service valves and disconnect unions.
For external units, insulate exposed hot pipework using UV-stable lagging and protect against frost where relevant.
Step 7: 7️⃣ Install flueing, condensate and electrical provisions where applicable
For internal continuous flow units, install the complete flue system exactly as specified. Room-sealed and fan-assisted appliances are not interchangeable in flue configuration.
For condensing units:
Where the appliance requires 240 V power, verify the presence of a suitable outlet in the correct location. Any new GPO or electrical alteration must be completed by a licensed electrician to AS/NZS 3000.
If fitting remote controllers, run communication cable in accordance with manufacturer instructions, keeping separation from power where required.
Step 8: 8️⃣ Connect the appliance and carry out pressure testing
Make final hot, cold and gas connections using the manufacturer’s unions, seals and torques where specified.
Then:
Do not rely on “no smell” as a gas test. Use a manometer and approved leak detection method.
If the job includes new pipework, record test results for compliance documentation and warranty support.
Step 9: 9️⃣ Commission the heater and set delivery temperatures
Start the appliance in accordance with the manufacturer procedure.
Commissioning checks should include:
For most domestic installations, keep the heater and distribution compliant with AS/NZS 3500.4. Bathrooms generally require a maximum delivery temperature of 50°C. Kitchens and laundries may differ depending on fixture type and design intent, but confirm the application and local requirements before setting final temperatures.
💡 Where the appliance allows, many installers set the unit to 60°C and temper bathroom circuits to 50°C. This gives better appliance performance and flexibility, provided the system design and fixture arrangement are compliant.
Step 10: 🔟 Final checks, handover and documentation
Complete final checks on:
Provide the client or builder with:
Record model, serial number, gas type, commissioning pressures, delivery temperatures and any meter or regulator upgrades completed.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- Can I install my own continuous flow hot water system in Australia?
- No, homeowners cannot legally install a continuous flow hot water system in Australia. All gas fitting and plumbing work must be completed by a licensed plumber and gas fitter. Installations must comply with AS/NZS 5601.1 and AS/NZS 3500, requiring a compliance certificate upon completion.
- What size gas pipe is required for a continuous flow hot water system?
- Most continuous flow hot water systems require an upgraded 20 mm or 25 mm gas supply line rather than a standard 15 mm branch. High-capacity units consume between 160 and 200 megajoules per hour, meaning existing supply pipework often requires upsizing to prevent pressure drops and appliance lockout under peak load.
- What are the clearance requirements for an outdoor continuous flow unit?
- Continuous flow gas water heaters require minimum terminal clearances from openings under AS/NZS 5601.1. Flue terminals must be at least 300 mm from openable windows, doors, and external corners, 500 mm between mechanical air inlets, and 1,000 mm below eaves or open verandahs to prevent combustion gas ingress.
- Is a tempering valve required on a continuous flow hot water system?
- Yes, a tempering valve is mandatory under AS/NZS 3500.4 for continuous flow installations supplying sanitary fixtures. Unless the unit is factory pre-set and certified to deliver hot water at a maximum of 50°C, a calibrated tempering valve must be installed to protect users against scald injuries.
- How do you test and commission a continuous flow hot water system?
- Commissioning requires conducting a static and dynamic gas pressure test using a digital manometer to verify working pressure under full load. The installer must also confirm water supply pressure, test all joints with leak detection fluid, verify tempering valve delivery temperature, and submit a compliance certificate to the regulator.
- Does a continuous flow hot water system need a power point?
- Yes, standard external continuous flow gas hot water units require a 240-volt, 10-amp weatherproof electrical general power outlet within reach of the unit flex. The internal electronics, safety solenoids, digital controllers, and anti-frost heating elements depend on mains electrical power to operate safely.
Written by Pipey, the Plumbing specialist at VIC.Tools.