Skip to main content

How to install a hot water system

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Installing or replacing a hot water system is a high-frequency licensed plumbing task covering isolation, disconnection, safe removal, compliant in

Skill level
Advanced
Time
4–8 hours for straightforward like-for-like replacement, 1–2 days for upgrades involving relocation, gas changes, heat pump or solar integration
Trade
Plumbing
Updated
28 November 2026

Tools you will need

  • Pipe cutters suitable for copper, PEX, and PVC
  • Copper tube cutter for 15 mm, 20 mm, and 25 mm
  • Press tool with jaws for approved press
  • PEX crimp or expansion tool to suit system used
  • Adjustable spanners and fixed spanners
  • Multigrips and stillsons/pipe wrenches
  • Tube bender for 15 mm and 20 mm copper
  • Deburring and reaming tools
  • Water pressure gauge
  • Thermometer for outlet and tempering valve set verification

🔧 Hot Water System Installation Guide for Australian Trade Professionals

What is involved in installing a hot water system in Australia?

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.

Installing or replacing a hot water system is a high-frequency licensed plumbing task covering isolation, disconnection, safe removal, compliant installation, commissioning, and certification. This guide is written for Australian trade professionals and references the PCA and AS/NZS 3500, with additional attention to electrical isolation, gas compliance, tempering, safe tray drainage, and water efficiency obligations.

What skill level is required to install a hot water system?

Advanced — Estimated time: 4–8 hours for straightforward like-for-like replacement, 1–2 days for upgrades involving relocation, gas changes, heat pump or solar integration

What specific tools are required for hot water system installation?

Pipe cutters suitable for copper, PEX, and PVC
Copper tube cutter for 15 mm, 20 mm, and 25 mm
Press tool with jaws for approved press-fit copper/stainless systems
PEX crimp or expansion tool to suit system used
Adjustable spanners and fixed spanners
Multigrips and stillsons/pipe wrenches
Tube bender for 15 mm and 20 mm copper
Deburring and reaming tools
Thread sealant and PTFE tape approved for potable water/gas where applicable
Manometer for gas pressure testing on gas storage/instantaneous units
Combustion analyser where required by manufacturer for gas appliance commissioning
Water pressure gauge
Thermometer for outlet and tempering valve set verification
Cordless drill/driver and masonry bits
Spirit level
Hole saw set
Caulking gun
Drain hose and bucket
Wet vacuum for controlled drainage/spill management
Electrical lockout/tagout device for electric systems
Leak detection spray for gas joints
Commissioning sheets and compliance documentation

What materials are needed for a hot water system installation?

Replacement hot water unit:
Electric storage
Gas storage
Gas instantaneous
Heat pump
Solar storage/booster
Approved isolation valve(s)
Non-return valve and line strainer if specified by manufacturer
Pressure limiting valve where supply pressure exceeds appliance/manufacturer limits
Expansion control valve where required by local authority or manufacturer
Tempering valve or thermostatic mixing valve compliant for heated water delivery
Safe tray and tundish where required
Tray drain in compliant material and size
15 mm, 20 mm, or 25 mm copper tube to AS 1432
PEX water pipe and fittings to AS/NZS 2492 / relevant WaterMark approval
PVC discharge pipe where permitted and suitable for drain applications to AS/NZS 1260
Brass unions, dielectric unions, and approved transition fittings
Vacuum relief valve if required by system design/manufacturer
PTR valve supplied or approved for the unit
Lagging/insulation for heated pipework to applicable energy efficiency requirements
Seismic restraint/bracketing where specified
Gas cock, regulator, and gas piping materials where applicable
Flue components for open flued/fan-assisted gas appliances as manufacturer specified
Condensate drain materials for condensing appliances/heat pumps where required
Drain pan support base or plinth if required
Pipe clips and supports
Electrical isolator and cabling by licensed electrician for hardwired systems
WaterMark-approved valves and fittings only

Safety Requirements

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.
Isolate electricity before any work on electric storage or heat pump units. Electrical final connection must be completed by a licensed electrician.
Gas work requires separate gas fitter licence.
Isolate gas at the meter/appliance cock before disconnection of gas systems.
Verify safe work area access, manual handling plan, and unit weight before removal/installation.
Confirm structural adequacy of slab, wall, platform, or roof location before setting new unit.
Discharge and drain stored water safely; stored water may exceed 60°C and cause scalding.
Check for asbestos risks in older flue penetrations, linings, or wall/floor penetrations before disturbing materials.
Install to PCA, AS/NZS 3500, appliance manufacturer instructions, and local water authority requirements.
Confirm tempering arrangements for sanitary fixtures delivering hot water in accordance with applicable requirements.
Maintain clearances, ventilation, and flue termination compliance on gas appliances.
Use correct PPE: gloves, eye protection, hearing protection, long sleeves, and safety boots.
Commission and test relief drains to safe visible discharge points.
Observe state licensing requirements including NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission.

Step-by-Step Guide

Step 1: Assess the Existing Installation

1️⃣ Identify system type and replacement scope

Confirm whether the job is a like-for-like replacement or an upgrade involving capacity, fuel source, location, or reticulation changes. Record existing unit details including storage volume, recovery rate, energy source, delivery temperature control, inlet pressure, and any known nuisance discharge or performance issues.

Check household or site demand profile:

Number of bathrooms and fixtures
Peak draw-off periods
Existing complaints about running out of hot water
Commercial or high-demand usage where relevant

💡 Match the replacement to actual demand rather than simply repeating tank size. In many upgrades, a heat pump or larger gas instantaneous manifold may produce better lifecycle value than replacing an undersized storage unit.

Step 2: Confirm Compliance, Site Conditions, and Product Selection

2️⃣ Select a compliant system

Choose the new unit based on:

Available services: electricity, gas, solar exposure
Inlet pressure and flow
Location constraints and access
Noise considerations for heat pumps
Flue route and ventilation for gas units
Drainage provision for safe tray, PTR, condensate, and tundish
WELS requirements for connected fixtures where renovation scope includes outlets

Reference:

PCA
AS/NZS 3500
Manufacturer installation instructions
Local water authority requirements

For replacement selection, confirm:

Nominal connection sizes, typically 15 mm, 20 mm, or 25 mm
Safe tray need for internal or risk-prone locations
Tempering valve requirement on heated water delivery to bathrooms and sanitary fixtures
Need for pressure limiting valve and expansion control valve
For gas: appliance type approval, flueing method, and gas line sizing

💡 In hard-water or aggressive-water regions, material selection and valve specification should reflect local conditions to reduce premature warranty claims.

Step 3: Isolate Services and Drain Down

3️⃣ Make the site safe

Shut off the cold water supply to the unit. Isolate power at the switchboard and lock out where electric. For gas units, shut off the appliance gas cock and upstream isolation as required, then verify zero flow.

Open nearby hot outlets to relieve pressure. Drain the storage vessel using a hose to a safe discharge point. Operate the relief valve carefully if needed to break vacuum and assist draining, observing scald risk.

Where replacing instantaneous systems, isolate and depressurise both water and gas lines before disconnecting.

⚠️ Stored water and relief lines can release near-boiling water. Use hoses, gloves, and controlled discharge paths.

Step 4: Disconnect and Remove the Existing Unit

4️⃣ Remove the old system without damaging services

Disconnect:

Cold inlet
Hot outlet
Relief drain
Gas connection and flue where applicable
Electrical connections by electrician where required
Condensate on condensing/heat pump units if present

Cap or plug open services temporarily. Remove brackets, restraints, and trays as needed. Use mechanical lifting aids for larger units, especially old vitreous enamel storage cylinders which may be heavy even after draining.

Inspect exposed pipework for:

Corrosion
Non-compliant valves
Undersized pipework
Missing lagging
Failed supports
Damage from previous leaks

Step 5: Prepare the Base, Position, and Services

5️⃣ Set up the new installation point

Prepare a level, stable base or plinth. Install safe tray and tray drain where required. Ensure relief drains can run continuously to an approved visible termination with correct fall and support.

Rough in or alter pipework as needed using approved materials:

15 mm for smaller domestic branch connections
20 mm common for storage heater connections and trunk runs
25 mm where demand or appliance specification requires higher flow

For gas appliances, confirm pipe sizing for maximum demand and allowable pressure drop. For heat pumps, check clearance, airflow, noise separation from boundaries/windows, and condensate drainage.

For solar systems, coordinate collector flow/return, sensor cabling, booster connections, tempering arrangement, and roof penetrations to manufacturer details.

Step 6: Install the New Unit and Valves

6️⃣ Fit the appliance and mandatory control valves

Position the unit square and level, maintaining service clearances. Install required valves and fittings in the correct order and orientation as specified by the manufacturer and local authority.

Typical water-side arrangement may include:

Isolation valve
Line strainer
Pressure limiting valve
Non-return valve
Expansion control valve
Cold inlet connection to heater
PTR valve to dedicated relief drain
Tempering valve on heated water supply to fixtures as required

Use only WaterMark-approved fittings and valves. Support pipework correctly and avoid mechanical strain on tank or heater connections.

For electric storage units, ensure electrical entry and element/thermostat access remain clear.

For gas storage/instantaneous units:

Install compliant gas cock
Purge per procedure
Fit regulator if required
Install flue system exactly to manufacturer instructions
Maintain clearances to combustibles and openings

⚠️ Gas appliance flueing and combustion air are critical safety items. Never improvise flue components or termination locations.

Step 7: Connect Pipework, Reliefs, and Drains

7️⃣ Complete hydraulic connections

Connect cold, hot, and relief/drain lines using approved jointing methods. Deburr all cuts and protect against internal swarf. Fit lagging to heated pipework as required.

Relief drainwork must:

Be of compliant material
Fall continuously
Terminate visibly and safely
Avoid trapped sections unless specifically permitted
Be sized in accordance with valve/appliance requirements

Connect:

Safe tray drain
PTR drain
ECV drain if fitted
Condensate drain for condensing/heat pump units
Tundish where required by system design

💡 Keep relief and tray drains accessible and visible for future fault diagnosis. Hidden terminations make nuisance discharge issues harder to identify.

Step 8: Complete Power, Gas, and Ancillary Connections

8️⃣ Final service connections

Electric systems:

Coordinate final wiring, isolation, and testing with a licensed electrician. Confirm tariff suitability where off-peak or controlled load applies.

Gas systems:

Pressure test, purge, and commission in accordance with the appliance manual and gas regulations. Verify burner operation, inlet pressure, and if required, combustion characteristics.

Heat pumps:

Confirm dedicated power requirements, operating mode, defrost clearance, and condensate management.

Solar:

Verify sensor operation, controller setup, pump station components, booster lockout/control logic, and roof circuit integrity.

🔒 Licensing note: gas fitting requires the appropriate gas work authorisation in addition to plumbing licensing.

Step 9: Fill, Purge, and Commission

9️⃣ Bring the system online

Open the cold inlet slowly and fill the system with hot taps open until air is fully purged. Check all joints and valves under static pressure. Energise or fire the appliance only when fully flooded and purged in accordance with manufacturer instructions.

Set and verify:

Storage temperature
Delivered tempered water temperature
Gas settings and combustion where required
Heat pump controller settings
Timer or tariff controls if installed

Test:

Isolation valve operation
PTR valve operation
ECV operation where fitted
Tempering valve outlet temperature stability
Flow performance at fixtures
Drain discharge at visible points

For sanitary fixtures, confirm delivered hot water temperatures comply with applicable requirements and project scope.

Step 10: Insulate, Label, and Finish

🔟 Complete the installation professionally

Lag all exposed heated pipework. Label isolation points where appropriate. Secure pipe supports, seal penetrations, and tidy all services. Reinstate the work area and remove old equipment for compliant disposal/recycling.

Where the unit has a significant energy upgrade component, explain expected operating characteristics to the client, especially:

Heat pump noise and recovery timing
Solar booster dependence
Off-peak recovery windows
Gas instantaneous minimum flow activation

💡 If the installation includes new tapware or shower heads, specify compliant WELS products and confirm performance at the available site pressure.

Step 11: Handover and Documentation

1️⃣1️⃣ Close out the job

Provide the owner/client with:

Manufacturer manuals and warranty documents
Operating instructions
Maintenance recommendations
Compliance certificate/documentation as required by state or territory
Tempering valve maintenance advice
Relief valve discharge explanation
Service intervals for anode inspection, flushing, and valve testing

Reference the relevant regulator as applicable:

NSW Fair Trading
VIC VBA
QLD QBCC
WA Building Commission

Advise that future service and any modifications must be carried out by licensed trades.

Common Mistakes to Avoid

1.Installing a replacement unit without checking actual demand profile, resulting in undersized or oversized plant.
2.Omitting or mis-ordering control valves such as pressure limiting, non-return, or expansion control valves.
3.Failing to fit or correctly set a tempering valve where required for sanitary hot water delivery.
4.Non-compliant relief drain termination, including poor fall, concealed discharge, or unsuitable materials.
5.Reusing old valves, unions, or corroded pipework on a new installation, leading to avoidable call-backs.
6.Incorrect gas pipe sizing or flue installation on gas appliances.
7.Energising an electric unit before fully filling and purging the tank, damaging elements.
8.Poor heat pump placement causing noise complaints, airflow restriction, or condensate issues.
9.Inadequate pipe lagging, reducing efficiency and delaying delivery temperature.
10.Failing to provide compliance documentation and clear client handover.

Pro Tips

Size storage and recovery to actual simultaneous demand, not just bedroom count.
Replace critical valves on changeover rather than relying on legacy components with unknown service history.
Use dielectric separation where dissimilar metals are present to reduce galvanic corrosion risk.
Test supply pressure before final valve selection; many nuisance leaks and valve discharges are pressure related.
On urgent replacements, carry standard valve packs and common connection sets for 15 mm and 20 mm systems.
For heat pump upgrades, check overnight ambient conditions and recovery expectations with the client before sign-off.
Where water quality is aggressive, discuss sacrificial anode inspection intervals and warranty conditions early.

Recommended Tools

RIDGID 15/22 mm copper tube cutter — clean, fast cuts on common domestic sizes
Milwaukee or Rothenberger press tool kit — efficient installation on copper press-fit systems
REMS or Viega PEX crimp/press tool — reliable for compliant multilayer/PEX connections
Testo digital manometer — accurate gas pressure testing and commissioning
Kincrome water pressure test gauge — quick verification of mains pressure and valve selection suitability

Frequently asked questions

What is involved in install a hot water system?
Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Installing or replacing a hot water system is a high-frequency licensed plumbing task covering isolation, disconnection, safe removal, compliant in
What skill level do I need for install a hot water system?
Advanced — Estimated time: 4–8 hours for straightforward like-for-like replacement, 1–2 days for upgrades involving relocation, gas changes, heat pump or solar integration
What are common mistakes when install a hot water system?
1. Installing a replacement unit without checking actual demand profile, resulting in undersized or oversized plant. 2. Omitting or mis-ordering control valves such as pressure limiting, non-return, or expansion control valves. 3. Failing to fit or correctly set a tempering valve where required for sanitary hot water delivery. 4. Non-compliant relief drain termination, including poor fall, conceal
What tools do I need for install a hot water system?
This guide includes a comprehensive tools list. Key plumbing tools are detailed in the Tools Required section.
What is the Australian standard for hot water system installation?
The primary Australian standard for hot water system installation is AS/NZS 3500:2021 Plumbing and Drainage, specifically Part 4 for heated water services. This standard outlines requirements for materials, installation methods, safety devices, and commissioning. Additionally, AS/NZS 3000:2018 Electrical Installations applies to electric units, and AS/NZS 5601.1:2022 Gas Installations for gas appliances.
Why are tempering valves mandatory in Australia?
Tempering valves are mandatory in Australia to prevent scalding, particularly for vulnerable individuals like children and the elderly. According to AS/NZS 3500.4:2021, hot water delivered to sanitary fixtures must not exceed 50°C. These valves mix hot water from the system with cold water to achieve a safe, consistent outlet temperature.
What licensing is required for hot water system installation in Australia?
In Australia, hot water system installation must be performed by a licensed plumber. Depending on the system type, additional endorsements may be required, such as a gasfitter's license for gas units or an electrician's license for electrical connections if not performed by a licensed plumber with appropriate electrical disconnect/reconnect qualifications. Always verify state-specific licensing requirements.

Written by Pipey, the Plumbing specialist at VIC.Tools.