How to install a hot water system
Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Installing or replacing a hot water system is a high-frequency licensed plumbing task covering isolation, disconnection, safe removal, compliant in
- Skill level
- Advanced
- Time
- 4–8 hours for straightforward like-for-like replacement, 1–2 days for upgrades involving relocation, gas changes, heat pump or solar integration
- Trade
- Plumbing
- Updated
- 28 November 2026
Tools you will need
- Pipe cutters suitable for copper, PEX, and PVC
- Copper tube cutter for 15 mm, 20 mm, and 25 mm
- Press tool with jaws for approved press
- PEX crimp or expansion tool to suit system used
- Adjustable spanners and fixed spanners
- Multigrips and stillsons/pipe wrenches
- Tube bender for 15 mm and 20 mm copper
- Deburring and reaming tools
- Water pressure gauge
- Thermometer for outlet and tempering valve set verification
🔧 Hot Water System Installation Guide for Australian Trade Professionals
What is involved in installing a hot water system in Australia?
Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.
Installing or replacing a hot water system is a high-frequency licensed plumbing task covering isolation, disconnection, safe removal, compliant installation, commissioning, and certification. This guide is written for Australian trade professionals and references the PCA and AS/NZS 3500, with additional attention to electrical isolation, gas compliance, tempering, safe tray drainage, and water efficiency obligations.
What skill level is required to install a hot water system?
Advanced — Estimated time: 4–8 hours for straightforward like-for-like replacement, 1–2 days for upgrades involving relocation, gas changes, heat pump or solar integration
What specific tools are required for hot water system installation?
What materials are needed for a hot water system installation?
Safety Requirements
Step-by-Step Guide
Step 1: Assess the Existing Installation
1️⃣ Identify system type and replacement scope
Confirm whether the job is a like-for-like replacement or an upgrade involving capacity, fuel source, location, or reticulation changes. Record existing unit details including storage volume, recovery rate, energy source, delivery temperature control, inlet pressure, and any known nuisance discharge or performance issues.
Check household or site demand profile:
💡 Match the replacement to actual demand rather than simply repeating tank size. In many upgrades, a heat pump or larger gas instantaneous manifold may produce better lifecycle value than replacing an undersized storage unit.
Step 2: Confirm Compliance, Site Conditions, and Product Selection
2️⃣ Select a compliant system
Choose the new unit based on:
Reference:
For replacement selection, confirm:
💡 In hard-water or aggressive-water regions, material selection and valve specification should reflect local conditions to reduce premature warranty claims.
Step 3: Isolate Services and Drain Down
3️⃣ Make the site safe
Shut off the cold water supply to the unit. Isolate power at the switchboard and lock out where electric. For gas units, shut off the appliance gas cock and upstream isolation as required, then verify zero flow.
Open nearby hot outlets to relieve pressure. Drain the storage vessel using a hose to a safe discharge point. Operate the relief valve carefully if needed to break vacuum and assist draining, observing scald risk.
Where replacing instantaneous systems, isolate and depressurise both water and gas lines before disconnecting.
⚠️ Stored water and relief lines can release near-boiling water. Use hoses, gloves, and controlled discharge paths.
Step 4: Disconnect and Remove the Existing Unit
4️⃣ Remove the old system without damaging services
Disconnect:
Cap or plug open services temporarily. Remove brackets, restraints, and trays as needed. Use mechanical lifting aids for larger units, especially old vitreous enamel storage cylinders which may be heavy even after draining.
Inspect exposed pipework for:
Step 5: Prepare the Base, Position, and Services
5️⃣ Set up the new installation point
Prepare a level, stable base or plinth. Install safe tray and tray drain where required. Ensure relief drains can run continuously to an approved visible termination with correct fall and support.
Rough in or alter pipework as needed using approved materials:
For gas appliances, confirm pipe sizing for maximum demand and allowable pressure drop. For heat pumps, check clearance, airflow, noise separation from boundaries/windows, and condensate drainage.
For solar systems, coordinate collector flow/return, sensor cabling, booster connections, tempering arrangement, and roof penetrations to manufacturer details.
Step 6: Install the New Unit and Valves
6️⃣ Fit the appliance and mandatory control valves
Position the unit square and level, maintaining service clearances. Install required valves and fittings in the correct order and orientation as specified by the manufacturer and local authority.
Typical water-side arrangement may include:
Use only WaterMark-approved fittings and valves. Support pipework correctly and avoid mechanical strain on tank or heater connections.
For electric storage units, ensure electrical entry and element/thermostat access remain clear.
For gas storage/instantaneous units:
⚠️ Gas appliance flueing and combustion air are critical safety items. Never improvise flue components or termination locations.
Step 7: Connect Pipework, Reliefs, and Drains
7️⃣ Complete hydraulic connections
Connect cold, hot, and relief/drain lines using approved jointing methods. Deburr all cuts and protect against internal swarf. Fit lagging to heated pipework as required.
Relief drainwork must:
Connect:
💡 Keep relief and tray drains accessible and visible for future fault diagnosis. Hidden terminations make nuisance discharge issues harder to identify.
Step 8: Complete Power, Gas, and Ancillary Connections
8️⃣ Final service connections
Electric systems:
Coordinate final wiring, isolation, and testing with a licensed electrician. Confirm tariff suitability where off-peak or controlled load applies.
Gas systems:
Pressure test, purge, and commission in accordance with the appliance manual and gas regulations. Verify burner operation, inlet pressure, and if required, combustion characteristics.
Heat pumps:
Confirm dedicated power requirements, operating mode, defrost clearance, and condensate management.
Solar:
Verify sensor operation, controller setup, pump station components, booster lockout/control logic, and roof circuit integrity.
🔒 Licensing note: gas fitting requires the appropriate gas work authorisation in addition to plumbing licensing.
Step 9: Fill, Purge, and Commission
9️⃣ Bring the system online
Open the cold inlet slowly and fill the system with hot taps open until air is fully purged. Check all joints and valves under static pressure. Energise or fire the appliance only when fully flooded and purged in accordance with manufacturer instructions.
Set and verify:
Test:
For sanitary fixtures, confirm delivered hot water temperatures comply with applicable requirements and project scope.
Step 10: Insulate, Label, and Finish
🔟 Complete the installation professionally
Lag all exposed heated pipework. Label isolation points where appropriate. Secure pipe supports, seal penetrations, and tidy all services. Reinstate the work area and remove old equipment for compliant disposal/recycling.
Where the unit has a significant energy upgrade component, explain expected operating characteristics to the client, especially:
💡 If the installation includes new tapware or shower heads, specify compliant WELS products and confirm performance at the available site pressure.
Step 11: Handover and Documentation
1️⃣1️⃣ Close out the job
Provide the owner/client with:
Reference the relevant regulator as applicable:
Advise that future service and any modifications must be carried out by licensed trades.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What is involved in install a hot water system?
- Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Installing or replacing a hot water system is a high-frequency licensed plumbing task covering isolation, disconnection, safe removal, compliant in
- What skill level do I need for install a hot water system?
- Advanced — Estimated time: 4–8 hours for straightforward like-for-like replacement, 1–2 days for upgrades involving relocation, gas changes, heat pump or solar integration
- What are common mistakes when install a hot water system?
- 1. Installing a replacement unit without checking actual demand profile, resulting in undersized or oversized plant. 2. Omitting or mis-ordering control valves such as pressure limiting, non-return, or expansion control valves. 3. Failing to fit or correctly set a tempering valve where required for sanitary hot water delivery. 4. Non-compliant relief drain termination, including poor fall, conceal
- What tools do I need for install a hot water system?
- This guide includes a comprehensive tools list. Key plumbing tools are detailed in the Tools Required section.
- What is the Australian standard for hot water system installation?
- The primary Australian standard for hot water system installation is AS/NZS 3500:2021 Plumbing and Drainage, specifically Part 4 for heated water services. This standard outlines requirements for materials, installation methods, safety devices, and commissioning. Additionally, AS/NZS 3000:2018 Electrical Installations applies to electric units, and AS/NZS 5601.1:2022 Gas Installations for gas appliances.
- Why are tempering valves mandatory in Australia?
- Tempering valves are mandatory in Australia to prevent scalding, particularly for vulnerable individuals like children and the elderly. According to AS/NZS 3500.4:2021, hot water delivered to sanitary fixtures must not exceed 50°C. These valves mix hot water from the system with cold water to achieve a safe, consistent outlet temperature.
- What licensing is required for hot water system installation in Australia?
- In Australia, hot water system installation must be performed by a licensed plumber. Depending on the system type, additional endorsements may be required, such as a gasfitter's license for gas units or an electrician's license for electrical connections if not performed by a licensed plumber with appropriate electrical disconnect/reconnect qualifications. Always verify state-specific licensing requirements.
Written by Pipey, the Plumbing specialist at VIC.Tools.