Skip to main content

How to install a hot water system tempering valve

Learn how to install a hot water system tempering valve to meet AS/NZS 3500.4. Ensure safe 50°C delivery temperatures using licensed plumbing methods.

Quick answer

A hot water system tempering valve is installed by a licensed plumber between the heater outlet and the domestic sanitary supply lines. It mixes hot and cold water to ensure personal hygiene outlets do not exceed 50°C. This installation complies with AS/NZS 3500.4 while keeping cylinder storage above 60°C to stop Legionella growth.

Skill level
Advanced
Time
2–4 hours
Trade
Plumbing
Updated
28 November 2026

Tools you will need

  • Rothenberger ROMAX 4000 - Press Fit Tool
  • Knipex 87 01 250 Cobra - Water Pump Pliers
  • Rothenberger ROCUT 42 TC - Pipe Cutter
  • Testo 104-IR - Waterproof Calibrated Food-Safe/Trade Thermometer
  • Bahco 9072 - Adjustable Wrench
  • Rems REG 10-54 E - Outer/Inner Pipe Deburrer

🔧 Hot Water System Tempering Valve Installation Guide for Australian Compliance

What is the purpose of installing a hot water system tempering valve in Australia?

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.

Installing a tempering valve on a domestic hot water system is a standard compliance task to ensure sanitary fixtures deliver water at safe temperatures, typically not exceeding 50°C in most residential applications. This work must be completed in accordance with the Plumbing Code of Australia (PCA), AS/NZS 3500.4, manufacturer instructions, and relevant state licensing requirements for hot water installation work.

What skill level is required for hot water tempering valve installation?

Advanced — Estimated time: 2–4 hours

What specific tools are required for tempering valve installation?

Tube cutter suitable for 15 mm, 20 mm and 25 mm copper
Press tool with jaws for relevant press-fit system, or copper soldering kit where permitted by job specification
Multigrips and adjustable spanners
Pipe deburring and reaming tool
Digital thermometer or calibrated temperature probe
Pressure gauge/test kit where commissioning requires verification
Drill/driver and fixings for valve support brackets
Spirit level and tape measure
Permanent marker for identifying hot, cold and tempered lines
Bucket, drain hose and rags for draining down
Isolation key or service valve tool

What materials are essential for a compliant tempering valve installation?

Tempering valve compliant for domestic heated water service, sized to suit system flow and pipework, commonly 15 mm or 20 mm
Isolation valves for hot and cold inlets, typically 15 mm full-port ball valves
Line strainers if not integral to valve assembly
Non-return valves/check valves where required by manufacturer or system design
Copper tube DN15 (15 mm) or DN20 (20 mm) to AS 1432
PEX or PE-X/AL/PE-X pipe and fittings where used, compliant with AS/NZS 2492 and AS/NZS 3500
Copper press fittings or capillary fittings to suit pipe size
Thread sealant tape or approved thread sealing compound
Tempered water identification labels or marker tags
Pipe clips/supports and valve mounting bracket
Drain tray and safe discharge provisions where applicable around storage unit installation
Commissioning documentation and compliance forms required by the relevant authority

Safety Requirements

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.
Isolate electrical supply to electric storage units before commencing nearby pipework.
For gas storage or instantaneous systems, gas work requires a separate gas fitter licence.
Confirm water heater outlet temperatures before commissioning to prevent scald risk.
Use PPE: safety glasses, gloves, hearing protection when cutting or drilling, and heat-resistant protection if soldering.
Depressurise and drain the hot water service before cutting into existing lines.
Check manufacturer minimum temperature differential requirements; many tempering valves require adequate hot inlet temperature to control correctly.
Install in accordance with the PCA, AS/NZS 3500.4, local water authority requirements, and state regulator rules such as NSW Fair Trading, VIC VBA, QLD QBCC, or WA Building Commission.
Do not use a tempering valve where a thermostatic mixing valve is specifically required by the application or authority.
Ensure access for future maintenance, testing and replacement.

Step-by-Step Guide

Step 1: Assess the installation requirements

Confirm the application, fixture coverage, and compliance requirement for delivered hot water temperature. In Australian residential work, sanitary fixtures such as showers, baths and hand basins are commonly limited to 50°C maximum, while early childhood, aged care and healthcare applications may require lower limits and often different control arrangements.

Review the heater type, storage temperature settings, downstream fixture requirements, pipe sizing, and valve flow capacity. Confirm whether the valve is to serve the whole dwelling hot water line or only the sanitary fixture branch. Check manufacturer instructions for orientation, commissioning method, minimum flow, and whether integral check valves and strainers are included.

Step 2: Isolate, shut down and drain the system

Shut off the cold water supply to the heater and isolate any local branch valves. Turn off electrical supply at the isolator or switchboard for electric units. If working on a gas hot water service, isolate in accordance with site procedures and ensure any gas-related work is handled only by a licensed gas fitter.

Open a downstream hot tap to relieve pressure and drain enough water from the system to expose the proposed installation point. Use a bucket or hose to manage discharge. Verify the line is fully depressurised before cutting.

Step 3: Mark out the valve position and pipe layout

Identify the correct location on the heated water outlet line and adjacent cold water branch for the tempering valve. The standard arrangement includes:

Hot inlet from the water heater outlet
Cold inlet from the cold water supply
Tempered outlet to fixtures requiring safe delivery temperature

Install the valve as close as practical to the heater while maintaining serviceability and clear access. Allow room for isolation valves, unions, strainers, and future replacement. Follow the flow direction arrows on the valve body. Support pipework properly so the valve body is not carrying pipe stress.

Step 4: Cut in isolation valves and prepare pipework

Measure and cut the hot and cold branches cleanly using a tube cutter. Deburr internally and externally to prevent flow restriction and protect valve seats. Install separate isolation valves on both hot and cold feeds to the tempering valve to allow future servicing without shutting down the full system.

Where required, fit strainers upstream of the valve inlets. If the valve does not include integral non-return protection, install check valves in accordance with manufacturer instructions and system design. Keep branch lengths tidy and minimise dead legs.

Step 5: Install the tempering valve assembly

Connect the hot inlet, cold inlet, and tempered outlet exactly as marked on the valve body. Typical domestic installations use 15 mm or 20 mm copper or compliant multilayer/PEX systems depending on design flow.

Use the nominated jointing method:

Press-fit for copper or multilayer where approved
Capillary soldered copper where appropriate
Threaded adaptors sealed with approved thread sealant

Mount and support the valve so it remains accessible and is not twisted by the connected pipework. Ensure the outlet serves only the fixtures requiring tempered water unless the design specifically calls for whole-of-house tempered hot water.

Step 6: Refill, purge air and check for leaks

Slowly reopen the cold water supply to refill the system. Open downstream hot taps to purge air from the tempered branch. If the water heater has been drained, confirm it is fully filled before re-energising an electric element to avoid dry firing.

Inspect all joints, valve bodies, unions and threaded connections under pressure. Rectify any leaks before proceeding to temperature commissioning.

Step 7: Commission and set outlet temperature

Restore heater operation and allow the hot water unit to reach normal storage temperature. Using a calibrated digital thermometer, run water at the nearest and most hydraulically remote sanitary fixtures supplied by the valve. Adjust the tempering valve in accordance with manufacturer instructions until the outlet temperature is stable and compliant, generally 50°C max at the fixture set.

Lock or cap the adjustment if the valve design includes tamper protection. Recheck temperature after several minutes of flow and under varying draw-off conditions. Confirm the heater storage temperature remains high enough for system hygiene and appliance requirements where relevant, while the tempering valve controls outlet delivery to the occupied fixtures.

Step 8: Final compliance checks and handover

Verify that:

The valve is installed in the correct orientation
Isolation valves are accessible
Strainers/check valves are installed as required
Pipework is clipped and labelled
Fixture delivery temperature is compliant
The hot water service operates correctly under normal demand

Complete any required compliance certificate or plumbing record in line with the state authority. Advise the owner or builder that tempering valves require periodic maintenance and may need cleaning or replacement depending on water quality and service conditions.

Common Mistakes to Avoid

1.Installing the tempering valve backwards or swapping the hot and cold inlets, causing unstable outlet temperatures or no control.
2.Omitting isolation valves and strainers, making future maintenance difficult and increasing the risk of valve fouling.
3.Setting the outlet temperature at the valve without verifying actual temperature at the fixture.
4.Re-energising an electric storage heater before the tank is fully refilled, leading to element damage.
5.Using a tempering valve in an application requiring a thermostatic mixing valve or a lower mandated delivery temperature.

Pro Tips

1.💡 Use a tempering valve with integral unions, strainers and check valves where possible to reduce installation time and improve serviceability.
2.💡 On replacement jobs, flush the hot and cold branches before final connection to prevent debris from contaminating the new valve cartridge.
3.💡 If the home has long pipe runs, check temperature stability at the most remote shower, not just the nearest basin.
4.💡 Match valve size to probable simultaneous demand; oversizing can reduce control performance at low flow.
5.💡 Where selecting new outlets as part of the hot water upgrade, specify WELS-rated fixtures, typically 3-star to 4-star shower heads and efficient mixers, to reduce hot water consumption while maintaining performance.

Recommended Tools

RIDGID 15/22 mm tube cutter — clean, square cuts on copper tube
KNIPEX Cobra multigrips — reliable grip for valve bodies and threaded adaptors
Milwaukee or Viega press tool kit — efficient compliant jointing for copper press systems
Testo digital thermometer/probe — accurate outlet temperature commissioning
REMS deburring tool — fast internal/external pipe preparation

🔒 Licensing: Plumbing work in Australia must be carried out by a licensed plumber, with requirements administered by authorities such as NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission. Gas work requires a separate gas fitter licence.

🔧 Recommended Tools: Search for RIDGID tube cutter, Viega or Milwaukee press tool, Testo digital thermometer, and KNIPEX Cobra pliers.

Frequently asked questions

What is the Australian standard for hot water tempering valve installation?
Hot water tempering valve installations must comply with AS/NZS 3500.4:2021 Heated Water Services and the Plumbing Code of Australia. The standard mandates that heated water delivered to sanitary fixtures used primarily for personal hygiene must not exceed 50°C in standard domestic properties, or 45°C in early childhood centres, schools, and aged care facilities.
Can a homeowner install a tempering valve in Australia?
No, a homeowner cannot legally install a hot water tempering valve in Australia. All heated water service plumbing work is regulated and must be performed by a licensed plumber. Installing a valve without a licence breaches state building acts, voids manufacturer warranties, and risks substantial fines and rejected insurance claims.
Why does a hot water system need a tempering valve?
A tempering valve blends cold water with stored hot water to deliver safe water at 50°C while permitting cylinder storage at 60°C or higher. Storage at 60°C is required to prevent harmful Legionella bacteria growth, whereas unrestrained water above 60°C can cause severe third-degree scald burns in under a second.
How do you test and set a tempering valve after installation?
To test a tempering valve, open the nearest downstream hot water tap fully and allow the flow to stabilise for several minutes. Measure the stream using a calibrated digital thermometer probe. Adjust the valve's spindle mechanism using the manufacturer key until the reading reaches precisely 50°C, then secure the tamper-proof cap.
What is the difference between an orange, green, and blue tempering valve?
Tempering valve cap colours indicate their specific operating temperature range and application under Australian manufacturing standards. Orange valves are standard for domestic electric or gas storage units. Green valves are high-performance models engineered for instantaneous gas systems, and blue caps generally denote units suited for solar or heat pump water systems.
What are the most common tempering valve installation mistakes?
Common mistakes include crossing the hot and cold water inlet connections, failing to install required line strainers, and omitting adequate thermal pipe insulation. Plumbers also frequently forget to purge debris from supply lines prior to fitting the valve, which quickly fouls the internal thermostatic element and causes temperature delivery failures.

Written by Pipey, the Plumbing specialist at VIC.Tools.