How to Install a New Hot Water System (Electric/Gas)
This guide outlines the professional installation of new electric or gas hot water systems, covering critical steps from site assessment to commissioning. It ensures compliance with the Plumbing Code of Australia (PCA) and relevant Australian Standards, focusing on safety, efficiency, and longevity.
- Skill level
- Intermediate
- Time
- 4-8 hours (depending on system type and site complexity)
- Trade
- Plumbing
- Updated
- 29 November 2026
Tools you will need
- Pipe Wrenches
- Adjustable Spanners: 200mm and 300mm for fittings.
- Tube Cutters: For copper
- Crimping Tool/Press
- Propane/MAPP Gas Torch Kit: For copper brazing/soldering
- Plumbers Tape
- Spirit Level: 600mm for accurate mounting.
- Measuring Tape: 8m retractable.
- Multimeter: For testing electrical connections
- Gas Leak Detector/Soapy Water: For gas connections
What is involved in installing a new hot water system (electric/gas)?
This guide outlines the professional installation of new electric or gas hot water systems, covering critical steps from site assessment to commissioning. It ensures compliance with the Plumbing Code of Australia (PCA) and relevant Australian Standards, focusing on safety, efficiency, and longevity. This is a core plumbing task, essential for residential and commercial applications.
What skill level is required to install a new hot water system?
Intermediate — Estimated time: 4-8 hours (depending on system type and site complexity)
What tools are essential for hot water system installation?
Pipe Wrenches (2x): 300mm and 450mm for various pipe sizes. Adjustable Spanners: 200mm and 300mm for fittings. Tube Cutters: For copper (15mm, 20mm, 25mm) and PVC (up to 50mm). Crimping Tool/Press-Fit Tool: Specific to PEX or copper press-fit systems. Propane/MAPP Gas Torch Kit: For copper brazing/soldering (if applicable). Plumbers Tape (PTFE): For threaded connections. Hacksaw/Reciprocating Saw: For cutting larger pipes or old mounts. Spirit Level: 600mm for accurate mounting. Measuring Tape: 8m retractable. Drill Driver: Cordless, with various bits for mounting brackets. Multimeter: For testing electrical connections (electric HWS). Gas Leak Detector/Soapy Water: For gas connections (gas HWS). Pressure Gauge: For testing water pressure. Safety Glasses, Gloves, Hearing Protection: Essential PPE. Bucket/Wet Vac: For containing water during draining. Drainage Tray/Pan: For electric HWS in internal locations. Crimping Pliers: For hose clamps.What materials are needed for a hot water system installation?
New Hot Water System: Electric (e.g., Rheemglas, Dux Prodigy) or Gas (e.g., Rinnai Infinity, Bosch Optiflow), sized appropriately (e.g., 135L, 170L, 250L for electric; 16L/min, 26L/min for continuous flow gas). Tempering Valve: AS 4032.2 compliant (e.g., Reliance, Tomlinson). Pressure Limiting Valve (PLV): AS 1357.2 compliant, typically 500 kPa or 350 kPa depending on incoming pressure. Expansion Control Valve (ECV): AS 1357.2 compliant, typically 700 kPa or 850 kPa. Cold Water Isolation Valve: 20mm or 25mm ball valve. Non-Return Valve: AS 1357.2 compliant. Copper Pipe: 20mm or 25mm Type B, various lengths. PEX Pipe/Fittings: If using PEX system (e.g., 20mm or 25mm). PVC Pipe: 40mm or 50mm DWV for drain lines. Copper Fittings: Elbows, tees, reducers, unions (e.g., 20mm or 25mm). Gas Isolation Valve: AS 4617 compliant, 20mm or 25mm (for gas HWS). Gas Flex Connector: AGA approved (for gas HWS). Flue Components: For gas storage/continuous flow (e.g., 100mm or 125mm flue pipe, cowl). Mounting Brackets/Anchors: Heavy-duty, appropriate for wall material. Drainage Funnel/Trap: For relief valve discharge. Lagging/Insulation: For hot water pipes. Electrical Cable/Conduit: Appropriate size for electric HWS (e.g., 2.5mm² or 4mm² TPS). Weatherproof GPO/Junction Box: For outdoor electric HWS.Safety Requirements
⚠️ ALWAYS isolate power at the main switchboard before working on electric hot water systems. Verify with a multimeter. ⚠️ ALWAYS turn off the main water supply before disconnecting any water pipes. ⚠️ ALWAYS turn off the gas supply at the meter and the appliance isolation valve before working on gas hot water systems. Purge gas lines if necessary. ⚠️ Hot water can cause severe burns. Allow systems to cool before draining or working on hot components. ⚠️ Working with gas is extremely dangerous. All gas work MUST be performed by a licensed gas fitter. ⚠️ Working with electricity is extremely dangerous. All electrical work MUST be performed by a licensed electrician. ⚠️ Wear appropriate Personal Protective Equipment (PPE): safety glasses, gloves, hearing protection. ⚠️ Ensure adequate ventilation, especially when soldering or working with gas. ⚠️ Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. 🔒 Licensing: All plumbing work, including hot water system installation, requires a licensed plumber. Gas fitting requires a separate gas fitter licence. Electrical work requires a licensed electrician. Refer to your state's licensing body (e.g., NSW Fair Trading, VIC VBA, QLD QBCC, WA Building Commission) for specific requirements.Step-by-Step Guide
Step 1: 1️⃣ Site Assessment and System Selection
Verify System Type and Size: Confirm the new system (electric storage, gas storage, gas continuous flow) matches client requirements and existing services. Check capacity (e.g., 170L electric for 3-4 people, 26L/min continuous flow for larger homes). Check Services: Confirm adequate electrical supply (e.g., dedicated circuit for electric HWS, correct cable size 2.5mm² or 4mm²), gas supply (correct pipe size, pressure, and meter capacity for gas HWS), and water pressure/flow. Location Compliance: Ensure the new location complies with AS/NZS 3500.4 (hot water services) and AS/NZS 5601.1 (gas installations). This includes clearances from windows, doors, ignition sources, and property boundaries. For internal electric HWS, a safe tray and drain are mandatory. Mounting: Assess wall structure for strength if wall-mounting a continuous flow unit. Ensure a stable, level base for storage units. Drainage: Plan for the discharge of the relief valve (ECV/PTR valve) to a safe, visible point, typically to a tundish and then to a drain (e.g., 40mm DWV pipe).Step 2: 2️⃣ Isolation and Removal of Old System
Isolate Services: Electric: Turn off power at the main switchboard. Verify with a multimeter. Gas: Turn off gas at the main meter and the appliance isolation valve. Water: Turn off the main water supply to the property. Drain Old System: Connect a hose to the drain valve of the old hot water tank. Open a hot tap inside the house to break the vacuum. Allow the tank to drain completely. Disconnect Services: Electric: Disconnect wiring from the old unit, ensuring all connections are safe. Gas: Disconnect gas line, cap off if necessary. Water: Disconnect hot and cold water lines. Remove Old Unit: Carefully unmount and remove the old hot water system. Dispose of it responsibly, adhering to local regulations for scrap metal and hazardous waste.Step 3: 3️⃣ Mounting and Positioning New System
Positioning: Place the new hot water system in its designated location. Ensure it is level and stable. Wall Mounting (Continuous Flow): If wall-mounting a continuous flow unit, use appropriate heavy-duty brackets and anchors. Mark and drill pilot holes. Mount the unit securely, ensuring it is perfectly level. Drainage Tray (Internal Electric): For electric storage systems installed indoors (e.g., in a cupboard), install a compliant drainage tray (e.g., 600mm x 600mm for a 170L unit) with a 40mm drain connection to a suitable waste point.Step 4: 4️⃣ Plumbing Connections
Cold Water Inlet: Install a new 20mm or 25mm cold water isolation valve. Install a Pressure Limiting Valve (PLV) (e.g., 500 kPa) if incoming pressure exceeds 500 kPa. Install a Non-Return Valve (NRV) downstream of the PLV. Connect to the cold water inlet of the HWS. Hot Water Outlet: Connect the hot water outlet of the HWS to the existing hot water pipework. Install a tempering valve (AS 4032.2 compliant) on the hot water outlet, as close as practicable to the HWS. This is mandatory to limit hot water temperature to 50°C at sanitary fixtures (e.g., bathrooms, ensuites) and 45°C in early childhood centres. Relief Valve Discharge: Install the Expansion Control Valve (ECV) (e.g., 700 kPa or 850 kPa) and/or Pressure and Temperature Relief (PTR) valve (if integrated) according to manufacturer instructions. Run a dedicated drain line (e.g., 40mm DWV PVC or copper) from the relief valve discharge to a tundish, then to a safe, visible drain point (e.g., stormwater, gully trap). Ensure a continuous fall and no blockages.Step 5: 5️⃣ Gas Connections (Gas HWS Only)
Gas Line Connection: Connect the gas supply line to the gas inlet of the new HWS. Use AGA-approved fittings and flexible connectors where appropriate. Isolation Valve: Ensure an accessible gas isolation valve (e.g., 20mm ball valve) is installed upstream of the appliance. Flue Installation: Install the flue system according to AS/NZS 5601.1 and manufacturer instructions. Ensure correct sizing (e.g., 100mm or 125mm), clearances, and termination (e.g., cowl). Leak Test: Once connections are made, turn on the gas supply slowly. Perform a thorough leak test using an approved gas leak detector or soapy water solution on all gas connections.Step 6: 6️⃣ Electrical Connections (Electric HWS Only)
Wiring: Connect the electrical supply to the HWS terminal block, ensuring correct polarity and earth connection. Use appropriate cable glands and conduit if required. Thermostat/Element: Check thermostat settings and element connections. Circuit Protection: Verify the HWS is on a dedicated circuit with appropriate circuit breaker protection. Weatherproofing: For outdoor electric HWS, ensure all electrical connections are weatherproof (e.g., IP-rated junction box, conduit).Step 7: 7️⃣ Commissioning and Testing
Fill System: Slowly open the cold water isolation valve to fill the hot water system. Open a hot tap inside the house to purge air from the system. Once water flows steadily from the hot tap, close it. Check for Leaks: Inspect all water connections for leaks. Restore Power/Gas: Electric: Turn on power at the main switchboard. Gas: Slowly open the gas isolation valve and main gas meter. Ignite/Power On: Follow manufacturer instructions to ignite the gas HWS or power on the electric HWS. Temperature Check: Electric/Gas Storage: Allow the system to heat up. Check the hot water temperature at the tempering valve outlet and at a sanitary fixture (e.g., bathroom basin) to ensure it is 50°C (or 45°C for early childhood centres) as per AS/NZS 3500.4. Adjust the tempering valve if necessary. Gas Continuous Flow: Check the set temperature at the controller and verify output temperature. Relief Valve Test: Briefly open the relief valve (ECV/PTR) to ensure it discharges correctly to the drain. Gas Leak Test (Gas HWS): Perform a final gas leak test with the system operating. Customer Handover: Explain operation, maintenance, and safety features to the client. Provide manufacturer's manual and warranty information.Common Mistakes to Avoid
Frequently asked questions
- What is involved in install a new hot water system (electric/gas)?
- This guide outlines the professional installation of new electric or gas hot water systems, covering critical steps from site assessment to commissioning. It ensures compliance with the Plumbing Code of Australia (PCA) and relevant Australian Standards, focusing on safety, efficiency, and longevity.
- What skill level do I need for install a new hot water system (electric/gas)?
- Intermediate — Estimated time: 4-8 hours (depending on system type and site complexity)
- What are common mistakes when install a new hot water system (electric/gas)?
- 1. Incorrect Tempering Valve Installation/Setting: Failing to install a tempering valve or setting it incorrectly, leading to scalding risk or non-compliance with AS/
- What tools do I need for install a new hot water system (electric/gas)?
- This guide includes a comprehensive tools list. Key plumbing tools are detailed in the Tools Required section.
- What is the Australian standard for hot water system plumbing?
- The primary Australian standard for hot water system plumbing is AS/NZS 3500.4:2021, which covers heated water services. This standard outlines requirements for installation, materials, and safety devices to ensure compliance and safe operation across Australia.
- Why is a tempering valve required for hot water systems in Australia?
- A tempering valve is required to comply with AS 4032.2:2005 and the Plumbing Code of Australia, limiting hot water delivery to sanitary fixtures to a maximum of 50°C. This prevents scalding, particularly for children, the elderly, and people with disabilities, enhancing safety in residential and commercial settings.
- What is the typical lifespan of a hot water system in Australia?
- The typical lifespan of a hot water system in Australia varies by type and maintenance. Electric storage systems generally last 8-12 years, while gas storage systems average 10-15 years. Continuous flow gas systems can last 15-20 years, according to manufacturers like Rinnai and Rheem.
- Are permits required for hot water system installation in Australia?
- Yes, in most Australian states and territories, plumbing and electrical permits are required for hot water system installation. For example, in Victoria, a licensed plumber must lodge a Compliance Certificate with the Victorian Building Authority (VBA) for regulated plumbing work, including hot water system replacement.
Written by Pipey, the Plumbing specialist at VIC.Tools.