Skip to main content

How to Install a Water Heater

Learn how to install a water heater in Australia with this comprehensive guide for plumbers and DIYers. Covers electric, gas, and heat pump units, ensuring compliance with PCA and Australian Standards for safe, efficient hot water.

Skill level
Intermediate
Time
4-8 hours (depending on unit type and existing infrastructure)
Trade
Plumbing
Updated
28 November 2026

Tools you will need

  • Ridgid 300mm & 450mm - Pipe Wrenches
  • Stanley FatMax 8m - Retractable Measuring Tape
  • Knipex Cobra 250mm - Water Pump Pliers
  • Rothenberger ROCUT 42 - Plastic Pipe Shears (for PEX/PP-R up to 42mm)
  • Milwaukee M18 FORCE LOGIC - Press Tool (with jaws for relevant pipe size)
  • Fluke 117 - Digital Multimeter
  • Testo 317-3 - Gas Leak Detector
  • Bosch GLL 3-80 C - Line Laser Level

What is the primary purpose of this hot water system installation guide?

This guide details the process of installing or replacing a domestic hot water heater in Australia, covering electric, gas, and heat pump units. It focuses on compliant installation practices, ensuring adherence to the Plumbing Code of Australia (PCA) and relevant Australian Standards. This is a critical task for plumbers, requiring precision and strict safety protocols.

What skill level and estimated time are required for hot water system installation?

Intermediate — Estimated time: 4-8 hours (depending on unit type and existing infrastructure)

Which essential tools are required for a compliant hot water system installation?

Pipe Wrenches (2): 300mm and 450mm for tightening pipe fittings. Adjustable Spanners: 200mm and 300mm for various nuts and bolts. Tube Cutter: 15mm-50mm capacity for copper pipe. PEX Crimping Tool / Press-Fit Tool: Specific to pipe system (if applicable). Deburring Tool: For copper and plastic pipes. Measuring Tape: 8m retractable. Spirit Level: 600mm for ensuring level installation. Drill Driver: Cordless, with various bits for mounting brackets and pilot holes. Hacksaw / Reciprocating Saw: For cutting larger pipes (PVC, HDPE). Multimeter: For testing electrical circuits (electric and heat pump units). Gas Leak Detector: Electronic or liquid solution (for gas units). Pressure Gauge: 0-1000 kPa for testing water pressure. Safety Glasses, Gloves, Hearing Protection: Essential PPE. Bucket / Wet Vacuum: For containing water during draining. Thread Seal Tape (PTFE): Plumbers' grade. Heat Gun / Blow Torch (if soldering copper): With appropriate safety gear. Crimping Tool (electrical): For wiring connections (electric/heat pump). Torque Wrench: For specific gas connections if required by manufacturer.

What key materials are necessary for installing a hot water system in Australia?

New Hot Water Heater Unit: Electric, Gas, or Heat Pump (e.g., Rheem, Rinnai, Dux, Bosch). Tempering Valve: AS 4032.2 compliant, appropriate size (e.g., 20mm, 25mm). Cold Water Expansion Valve (CWEV) / Pressure Limiting Valve (PLV): AS 1357.2 compliant, appropriate size (e.g., 20mm, 25mm), rated for system pressure. Pressure and Temperature Relief Valve (PTRV): AS 1357.1 compliant, appropriate size (e.g., 20mm, 25mm), rated for system pressure and temperature. Isolation Valves: Full bore, AS 5830 compliant (e.g., 20mm, 25mm ball valves). Pipe and Fittings: Copper (AS 1432), PEX (AS/NZS 2492), or HDPE (AS/NZS 4130) as required for connections. Drainage Pipe and Fittings: PVC DWV (AS/NZS 1260) for PTRV and tempering valve discharge. Lagging: AS/NZS 3500.4 compliant pipe insulation. Mounting Brackets/Straps: As per manufacturer's instructions for wall-mounted units. Gas Regulator (if required): AS 4627 compliant (for gas units). Electrical Cable/Conduit: AS/NZS 3000 compliant (for electric/heat pump units). Pipe Clips/Supports: As required by AS/NZS 3500.

Safety Requirements

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.
ALWAYS isolate power at the main switchboard for electric and heat pump units before commencing any electrical work. Verify with a multimeter. ALWAYS turn off the main water supply to the property. ALWAYS turn off the gas supply at the meter for gas units. Wear appropriate PPE: Safety glasses, gloves, and hearing protection. Hot Water Hazard: Be aware of scalding hot water when draining existing units. Heavy Lifting: Hot water units can be heavy. Use proper lifting techniques or seek assistance. Gas Safety: Gas work requires a separate gas fitter licence. All gas connections must be tested for leaks using an approved method (e.g., gas leak detector, soapy water solution). Electrical Safety: Electrical work must be performed by a licensed electrician. Ensure all wiring is compliant with AS/NZS 3000. Confined Spaces: Be aware of risks in confined spaces and ensure adequate ventilation. Working at Heights: Use stable ladders or platforms if working above ground level. Discharge Lines: Ensure PTRV and tempering valve discharge lines terminate safely and compliantly to a tundish or approved drain, preventing scalding hazards.

Step-by-Step Guide

Step 1: Site Assessment and Preparation

Before any work begins, conduct a thorough site assessment.

1.Verify Compliance: Confirm the new unit's specifications (size, energy type, flow rate) are suitable for the property and comply with local regulations (e.g., energy efficiency ratings, setback distances).
2.Isolate Services:
Water: Turn off the main water supply at the stopcock. Open a hot tap to relieve pressure. Electricity: Turn off the circuit breaker for the hot water system at the main switchboard. Tag out the switch. Verify no power with a multimeter. Gas: Turn off the gas supply at the main meter.
3.Drain Existing Unit:
Attach a hose to the drain valve at the bottom of the existing hot water unit. Route the hose to a suitable drain (e.g., stormwater, laundry trough). Open the drain valve and open a hot water tap in the house to allow air in and facilitate draining. This can take 30-60 minutes.
4.Disconnect Services:
Water: Disconnect the cold water inlet and hot water outlet pipes. Electricity: Disconnect the electrical wiring from the terminal block, noting connections. Gas: Disconnect the gas supply line.
5.Remove Old Unit: Carefully remove the old hot water unit, ensuring safe disposal according to local council regulations.

Step 2: Positioning and Mounting the New Unit

1.Positioning: Place the new hot water unit in the designated location. Ensure adequate clearance for maintenance and compliance with manufacturer's instructions and AS/NZS 3500.4 (e.g., minimum 150mm from combustible materials for gas units).
2.Leveling: Use a spirit level to ensure the unit is perfectly level. Adjust as necessary.
3.Mounting (if applicable): For wall-mounted units (e.g., continuous flow gas, some heat pumps), securely fix mounting brackets to structural elements using appropriate fasteners. Ensure the unit is firmly attached and cannot be dislodged.

Step 3: Plumbing Connections

1.Cold Water Inlet:
Install a new isolation valve on the cold water supply line. Install the Cold Water Expansion Valve (CWEV) / Pressure Limiting Valve (PLV) on the cold water inlet, as per manufacturer's instructions and AS/NZS 3500.4. Ensure the arrow on the valve indicates the direction of flow. Connect the cold water supply to the unit's cold water inlet.
2.Hot Water Outlet:
Install a new isolation valve on the hot water outlet line. Connect the hot water outlet from the unit to the household hot water distribution system.
3.Pressure and Temperature Relief Valve (PTRV):
Install the PTRV into the designated port on the hot water unit. Connect a discharge pipe (minimum 20mm copper or approved plastic) from the PTRV to a tundish, which then discharges to a safe, visible drain (e.g., stormwater, floor waste) in accordance with AS/NZS 3500.4. The discharge pipe must have a continuous fall and be free from obstructions.
4.Tempering Valve:
Install the tempering valve on the hot water outlet line, as close as practicable to the hot water unit, in accordance with AS 4032.2 and AS/NZS 3500.4. Connect the cold water supply to the tempering valve's cold inlet. Connect the hot water supply from the unit to the tempering valve's hot inlet. Connect the tempered water outlet from the valve to the household hot water distribution system. Connect a discharge pipe (minimum 20mm copper or approved plastic) from the tempering valve to a tundish, discharging to a safe, visible drain.
5.Pipe Materials: Use appropriate pipe materials (copper, PEX, HDPE) and joining methods (soldering, press-fit, crimp) compliant with AS/NZS 3500.4. Ensure all connections are watertight.
6.Lagging: Insulate all hot water pipes for at least 1m from the unit, and the cold water inlet pipe for 1m, to improve energy efficiency, as per AS/NZS 3500.4.

Step 4: Gas Connections (for Gas Units)

Gas work requires a separate gas fitter licence.
1.Gas Regulator: If required, install the gas regulator as per manufacturer's instructions and AS 4627.
2.Gas Supply Line: Connect the gas supply line to the hot water unit's gas inlet. Use appropriate thread seal tape (PTFE) or pipe dope specifically designed for gas.
3.Tighten Connections: Securely tighten all gas connections using appropriate wrenches.
4.Leak Test: Once the gas supply is reinstated, perform a thorough leak test on all new gas connections using an approved gas leak detector or soapy water solution. Bubbles indicate a leak. Rectify any leaks immediately.

Step 5: Electrical Connections (for Electric and Heat Pump Units)

Electrical work must be performed by a licensed electrician.
1.Wiring: Connect the electrical wiring from the dedicated circuit to the hot water unit's terminal block, following the manufacturer's wiring diagram and AS/NZS 3000.
2.Earth Connection: Ensure a proper earth connection is made.
3.Thermostat/Controller: For heat pump units, connect any external thermostat or controller as per manufacturer's instructions.
4.Circuit Breaker: Ensure the circuit breaker is correctly rated for the hot water unit's power consumption.

Step 6: Commissioning and Testing

1.Fill Unit: Close all hot water taps in the house. Slowly open the cold water isolation valve to the hot water unit. Allow the unit to fill completely, indicated by water flowing from an open hot tap. Once full, close the hot tap.
2.Check for Leaks: Visually inspect all water connections for leaks. Rectify any leaks immediately.
3.Restore Power/Gas:
Electric/Heat Pump: Turn on the circuit breaker at the main switchboard. Gas: Slowly open the gas supply at the main meter.
4.Initial Operation:
Electric/Heat Pump: Set the thermostat to the desired temperature (typically 60°C for storage units, 50°C for tempering valve outlets). Allow the unit to heat up. Gas: Ignite the pilot light (if applicable) or ensure the electronic ignition fires.
5.Tempering Valve Adjustment: Once the unit has heated sufficiently (allow 30-60 minutes), test the tempered water temperature at a hot tap (e.g., bathroom basin). Adjust the tempering valve to ensure the hot water delivered to sanitary fixtures does not exceed 50°C (45°C for early childhood centres, primary schools, and nursing homes) as per AS/NZS 3500.4. Use a thermometer to verify.
6.PTRV Operation: Briefly lift the lever on the PTRV to ensure it discharges freely.
7.Final Checks:
Confirm no water or gas leaks. Ensure all covers and panels are securely re-installed. Explain operation and maintenance to the client. Provide compliance certificates (e.g., Certificate of Compliance for plumbing work).

Common Mistakes to Avoid

1.Incorrect Valve Installation: Installing tempering valves, PTRVs, or PLVs in the wrong orientation or location, leading to non-compliance and potential safety hazards.
2.Inadequate Drainage: Failing to provide a compliant discharge pipe for the PTRV and tempering valve, resulting in scalding risks or water damage.
3.Ignoring Manufacturer's Instructions: Not following specific installation requirements for the hot water unit, which can void warranties or lead to operational issues.
4.Poor Gas Leak Testing: Not thoroughly testing all gas connections for leaks, posing a

Frequently asked questions

What Australian standards apply to hot water system installation?
Hot water system installations in Australia must comply primarily with AS/NZS 3500.4:2021 (Plumbing and drainage - Heated water services) and the Plumbing Code of Australia (PCA). These standards dictate requirements for pipework, valves, discharge, and energy efficiency, ensuring safety and performance.
Do I need a tempering valve for my hot water system in Australia?
Yes, a tempering valve is legally required for all new or replacement hot water systems in Australia to prevent scalding, as per AS/NZS 3500.4. It limits the hot water delivered to sanitary fixtures (like showers and basins) to a maximum of 50°C, while allowing storage at higher temperatures to prevent Legionella growth.
What is a PTRV and why is it important for water heaters?
A Pressure and Temperature Relief Valve (PTRV) is a critical safety device required on all storage hot water systems to prevent dangerous over-pressurisation or overheating. It automatically discharges water if either the pressure or temperature inside the tank exceeds safe operating limits, typically set at 1000 kPa and 99°C.
Can I install a gas hot water system myself in Australia?
No, installing a gas hot water system in Australia must only be performed by a licensed gas fitter due to significant safety risks associated with gas connections. Unlicensed work is illegal and can lead to severe hazards like gas leaks, carbon monoxide poisoning, or explosions, voiding warranties and insurance.
What is the typical lifespan of a hot water heater in Australia?
The typical lifespan of a hot water heater in Australia varies by type and maintenance, generally ranging from 8 to 12 years for electric and gas storage units, and up to 15-20 years for continuous flow or heat pump systems. Regular servicing and water quality can significantly impact longevity.
What are the common mistakes to avoid when installing a hot water system?
Common mistakes include incorrect sizing for household demand, failing to install mandatory safety valves like PTRVs and tempering valves, improper discharge pipework for relief valves, and neglecting manufacturer's specific installation instructions. Incorrect electrical or gas connections by unlicensed persons are also critical errors.
What is the Australian standard for hot water system installation?
The Australian standard for hot water system installation is primarily AS/NZS 3500.4:2021, 'Plumbing and drainage - Heated water services'. This standard, along with the Plumbing Code of Australia (PCA), dictates requirements for pipework, valves, discharge, and energy efficiency, ensuring safety and performance for all installations across Australia.
What is the maximum hot water temperature allowed at a tap in Australia?
The maximum hot water temperature allowed at the outlet of sanitary fixtures (e.g., showers, basins, baths) in Australia is 50°C for all new or replacement installations. This is enforced by AS/NZS 3500.4:2021 and achieved through the mandatory installation of a tempering valve.

Written by Pipey, the Plumbing specialist at VIC.Tools.