How to Perform Hydro Jetting for Blocked Drains
Learn professional hydro jetting for blocked drains in Australia. Clear grease, silt, and tree roots safely in accordance with AS/NZS 3500 and AS/NZS 4233.
Quick answer
Hydro jetting clears blocked drains by propelling water at pressures between 3,000 and 5,000 PSI through specialised nozzles to scour pipe walls, slice tree roots, and flush debris. Under AS/NZS 3500 and AS/NZS 4233, this advanced drainage method must be carried out by licensed plumbers to ensure pipe integrity.
- Skill level
- Advanced
- Time
- 1β4 hours depending on access, blockage severity, pipe length, and whether CCTV inspection is required before and after jetting.
- Trade
- Plumbing
- Updated
- 28 November 2026
Tools you will need
- Bar Group Cold Jetter 5000 PSI 21L/min - Honda GX690 Drain Jetter
- Mustang Nozzles Root Ranger - Turbine Root Cutting Nozzle
- Ridgid SeeSnake Standard with TruSense - CCTV Drain Inspection Camera
- Ridgid NaviTrack Scout - Underground Pipe & Sonde Locator
- Spitwater Jetfire - High Pressure Drain Cleaning Hose 1/4" 60m
- Enviroline Tiger Tail - 3-inch Flexible Hose Guide Protector
- Mustang Nozzles Foot Control Valve - Heavy Duty Safety Dump Valve
π§ Hydro Jetting for Blocked Drains β Professional Trade Guide for Australian Plumbers
What is hydro jetting for blocked drains?
Hydro jetting is an advanced drain clearing method that uses high-pressure water to cut through grease, sludge, soap scale, silt, and tree root intrusion while flushing debris from the line. It is widely used in residential, commercial, and strata drainage maintenance where cable machines alone are ineffective or where full pipe wall cleaning is required.
Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. All work should align with the PCA and relevant sections of AS/NZS 3500, with state-based licensing applying through NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission.
What skill level is required for hydro jetting in Australia?
Advanced β Estimated time: 1β4 hours depending on access, blockage severity, pipe length, and whether CCTV inspection is required before and after jetting.
What tools are essential for hydro jetting blocked drains?
Materials Required
Safety Requirements
Step-by-Step Guide
Step 1: Assess the blockage and confirm suitability
Start by gathering the service history, fixture symptoms, overflow points, and any prior attempts to clear the blockage. Determine whether the issue is isolated to a branch line, boundary trap, sewer main, stormwater line, grease line, or trade waste section.
Identify the pipe material, approximate diameter, and likely blockage type. Common line sizes include 50 mm, 65 mm, 90 mm, and 100 mm for sanitary drainage, with larger sizes in commercial applications. Hydro jetting is highly effective for grease, scale, sludge, and roots, but less appropriate where the line is structurally unsound.
Carry out a risk assessment covering wastewater release, access hazards, customer property protection, and machine setup area.
Step 2: Locate and expose the best access point
Choose the most suitable entry point such as an inspection opening, boundary trap shaft, overflow relief gully line access, upstream maintenance shaft, or stormwater pit connection. In many cases, downstream access provides better debris removal, while upstream access may be required to attack heavy root masses or branch blockages.
Expose buried openings carefully if needed. Protect surrounding finishes, gardens, paving, or internal floor areas before removing caps or grates. Confirm there is enough working space behind the hose for safe feed and retrieval.
Step 3: Perform CCTV pre-inspection
Run a CCTV camera through the line before jetting whenever practicable. This establishes:
Mark the blockage point with a locator if further access or repair may be needed. Pre-inspection is critical for selecting the correct nozzle and pressure setting and avoiding damage to compromised pipework.
Step 4: Select the correct jetter and nozzle setup
Match machine output and nozzle type to the drain size and blockage condition. As a general trade approach:
The key performance factor is often flow rate rather than pressure alone. High pressure without adequate L/min may puncture a path through the blockage without fully removing debris from the line walls.
Step 5: Set up the work area and water supply
Position the jetter on stable ground and connect to a reliable water source with enough volume to prevent pump starvation. Lay out the hose to avoid kinks, abrasion points, and trip hazards.
Install barriers and warn occupants or site personnel that drain clearing is underway. If working indoors or in finished areas, use containment sheeting and wastewater protection measures. Check nozzle tightness, hose condition, and machine controls before pressurising.
Step 6: Start with controlled penetration
Feed the hose into the line before engaging full pressure where the machine design requires that approach. Start conservatively and allow the rear jets to pull the hose forward. Do not force the hose aggressively; let the nozzle work through the obstruction.
For complete blockages, pulse advance in short increments. If the nozzle stalls, withdraw slightly, flush, and re-advance. Watch for signs of surcharge at upstream fixtures or access openings, which may indicate the blockage is shifting or the line cannot drain freely yet.
Step 7: Break through the obstruction
Once the hose reaches the blockage, work the nozzle progressively to establish a flow path. In grease lines, repeated forward-and-back passes may be needed to emulsify and flush the mass. In root-affected drains, create an initial opening first, then switch to a root-cutting or cleaning nozzle for more complete removal.
Avoid remaining stationary under high pressure for too long in one section of older pipe. The objective is controlled cutting and flushing, not concentrated pipe wall damage.
Step 8: Clean the full internal bore
After breakthrough, continue jetting the entire affected section to remove residual scale, sludge, paper, and fine root fibres from the pipe wall. This is where hydro jetting outperforms basic cable clearing: it restores a much cleaner internal bore and reduces rapid recurrence.
Work from the access point through the full section in measured passes. For longer runs, withdraw the hose slowly under pressure so the rear jets scour the wall and carry debris downstream. In commercial grease applications, multiple cleaning passes are often required.
Step 9: Flush and manage debris discharge
Monitor the downstream discharge point, pit, or boundary connection to confirm debris is being transported out of the line. Remove heavy solids, root bundles, or sludge from pits so they are not washed back into the system.
If the line discharges to a contained chamber or pit, vacuum out accumulated material where necessary. Leaving debris in the pit can result in immediate re-blockage on the next flow event.
Step 10: Re-inspect with CCTV
Carry out a post-jetting camera inspection to confirm:
This step is essential for documenting the service outcome and for identifying assets that need follow-up work rather than repeated maintenance clearing.
Step 11: Test drainage performance
Run fixtures or introduce controlled water flow to confirm the line drains freely under load. Check all connected fixtures, gullies, ORGs, pits, and traps for surcharge or slow relief.
In commercial systems, verify that trade waste lines and connected fixtures are clearing at expected flow rates. Record any abnormal fall, backfall, or partial obstruction still evident after cleaning.
Step 12: Reinstate access points and document the job
Refit inspection caps, grates, and covers securely. Clean and disinfect the work area, decontaminate equipment, and dispose of recovered waste in accordance with local requirements.
Provide the client or facility manager with findings including blockage cause, pipe condition, and maintenance recommendations. Where roots, grease, or structural defects are present, recommend scheduled cleaning, repair, or replacement rather than reactive call-outs only.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
π Licensing
Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Licensing requirements vary by state and territory, including NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission. Any associated gas work requires a separate gas fitter licence.
Frequently asked questions
- What is hydro jetting and how does it clear blocked drains?
- Hydro jetting clears blocked drains by propelling high-pressure water through specialised nozzles to scour pipe walls clean. Operating between 3,000 and 5,000 PSI, it obliterates tree roots, emulsifies fat and grease, and flushes silt out of residential and commercial lines far more thoroughly than traditional mechanical drain snakes.
- What Australian standards regulate high-pressure drain jetting?
- High-pressure drain jetting is governed primarily by AS/NZS 4233 (High pressure water jetting systems) parts 1 and 2, which mandate operator safety, system maintenance, and Class A or B training. In addition, all sanitary and stormwater drainage work must comply with the Plumbing Code of Australia and AS/NZS 3500.2.
- Why is a CCTV pipe inspection required before hydro jetting?
- A CCTV inspection is essential prior to hydro jetting to determine the cause of the blockage and assess the structural integrity of the line. Blasting compromised vitrified clay or deteriorated PVC at high pressure can cause catastrophic structural collapse, pipe displacement, or uncontainable trench washouts.
- What pressure and flow rate are needed to clear tree roots?
- To effectively clear tree roots, a water jetter typically requires a working pressure of 4,000 to 5,000 PSI paired with a flow rate of at least 21 to 31 litres per minute. Specialist rotating root-cutting nozzles, such as the Mustang Root Ranger, are essential to slice fibres flush with the pipe wall.
- What are the most common mistakes made when hydro jetting drains?
- Common mistakes include prioritising high pressure over water flow rate, failing to use a safety tiger tail hose protector at the pipe entrance, and neglecting to pre-inspect the drain with a camera. Operators also risk serious line entrapment or injury by reversing the jetting hose before releasing the foot valve pressure.
- Who is legally allowed to operate a commercial drain jetter in Australia?
- Hydro jetting on fixed sanitary or stormwater infrastructure must be carried out by a licensed plumber under state regulatory bodies such as the Victorian Building Authority or NSW Fair Trading. Operators utilising Class B systems exceeding 5,600 bar-litres per minute must also hold formal SafeWork-recognised high-pressure water jetting certification.
Written by Pipey, the Plumbing specialist at VIC.Tools.