How to unblock stormwater drains
Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Stormwater drain blockages are a common callout during heavy rain events, typically caused by silt, leaf litter, root intrusion, crushed pipework, o
- Skill level
- Advanced
- Time
- 1–4 hours depending on blockage severity, access points, pipe depth, and whether excavation or pipe repair is required
- Trade
- Plumbing
- Updated
- 28 November 2026
Tools you will need
- CCTV drain inspection camera with 30 m
- High
- Pipe locator compatible with CCTV sonde
- Shovel, trenching spade, and long
- Pit key, grate lifting hooks, or multi
- Wet/dry vacuum or sludge pump for silty pits
- Hand rods for short accessible runs
- Tape measure, marker paint, and inspection torch/headlamp
- Reciprocating saw or root
🔧 How to Unblock Stormwater Drains — Professional Trade Guide for Australian Plumbers
What is involved in unblocking stormwater drains in Australia?
Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Stormwater drain blockages are a common callout during heavy rain events, typically caused by silt, leaf litter, root intrusion, crushed pipework, or failed grates and pits. This guide outlines a professional fault-finding and clearing process consistent with the PCA and relevant sections of AS/NZS 3500, with emphasis on safe access, diagnosis, clearing, and confirmation testing.
What skill level is required to unblock stormwater drains?
Advanced — Estimated time: 1–4 hours depending on blockage severity, access points, pipe depth, and whether excavation or pipe repair is required
What specific tools are required for unblocking stormwater drains?
What materials are needed for stormwater drain repairs and unblocking?
Safety Requirements
Step-by-Step Guide
Step 1: Attend site and confirm symptoms
1️⃣ Initial assessment
Confirm the reported issue with the client or site supervisor: overflowing pits, downpipe surcharge, surface flooding, gurgling at grates, or slow drainage during rain. Determine whether the problem is isolated to one branch line or affects the full stormwater system.
Check recent weather conditions and ask whether the blockage is constant or only occurs under peak rainfall. This helps distinguish between a physical obstruction and an undersized or poorly graded system.
Inspect all visible stormwater assets including downpipes, grated trench drains, surface pits, silt traps, charged lines, and the outlet point if accessible.
Step 2: Identify the stormwater layout and likely blockage zone
2️⃣ System mapping
Locate upstream and downstream inspection points, pits, junctions, and discharge points. Use as-built plans if available, but verify on site because stormwater layouts are often altered during landscaping or renovations.
Establish pipe sizes and materials. Common domestic stormwater pipe sizes are 90 mm and 100 mm PVC, but older sites may include earthenware, concrete, or mixed repairs.
If there is no obvious outlet, use a CCTV camera with sonde and locator to trace the line. Mark pit locations, changes in direction, and suspected obstruction zones on the surface.
💡 For recurring blockages, always determine whether the issue is debris accumulation, root intrusion, pipe belly, crushed section, or discharge restriction. Clearing without diagnosis often leads to repeat callouts.
Step 3: Open pits and remove accessible debris
3️⃣ Manual clearing of entry points
Lift grates and pit lids carefully and inspect for leaf litter, mulch, sediment, roofing debris, gravel, or broken grate components. Many stormwater issues are caused by blocked pit inlets rather than pipe obstructions.
Remove debris by hand, scoop, or vacuum. Where pits are heavily silted, pump or vacuum out the sediment so the outlet invert and pipe entry points are visible.
Check pit walls and junctions for displaced fittings, collapsed benching, or root ingress at penetrations.
💡 Installing pit baskets or debris screens at problem pits can significantly reduce repeat blockages, especially under deciduous trees or in areas with bark and mulch wash-in.
Step 4: Test flow and isolate the affected run
4️⃣ Hydraulic confirmation
Run water into each upstream downpipe or collection point in a controlled manner and observe pit response. This identifies whether the blockage is in a branch line, at a junction, or in the main run to discharge.
Where safe and practical, use a hose to introduce flow incrementally rather than waiting for a natural rain event. Note back-up levels and the point at which surcharge occurs.
If one branch line fails while others drain correctly, isolate that section for clearing. If all branches surcharge, suspect a downstream obstruction, outlet blockage, or pipe failure.
Step 5: Inspect internally with CCTV
5️⃣ Camera diagnosis
Insert the CCTV camera from the nearest downstream access point where possible. A downstream-to-upstream inspection usually gives better visibility of joints, root ingress, and debris build-up.
Identify the blockage type:
Record pipe depth, distance to obstruction, and exact location using the sonde locator. This determines whether jetting, mechanical clearing, or excavation is the best next step.
Step 6: Select the correct clearing method
6️⃣ Choose jetting, mechanical clearing, or excavation
Use high-pressure jetting for silt, leaf matter, light roots, and general sludge in PVC and similar stormwater lines, provided the pipe condition is suitable.
Use a mechanical drain cleaner where there is dense root intrusion, compacted debris, or where jetting access is limited. Match the cutting head to the obstruction.
Proceed to excavation and repair if CCTV identifies a collapsed pipe, significant deformation, severe backfall, broken junction, or repeated root ingress through failed joints.
⚠️ Avoid aggressive root-cutting or overpowered jetting in fragile older pipework such as deteriorated earthenware or cracked thin-wall sections, as this can convert a serviceable line into a full collapse.
Step 7: Clear the blockage
7️⃣ Carry out the drain cleaning
For jetting:
Start with an appropriate penetrator or flushing nozzle and work progressively. Advance to the blockage carefully, pulse through the obstruction, then retrieve slowly to drag debris back to the access point or move it downstream to an accessible pit.
For mechanical cleaning:
Feed the cable steadily, avoid excessive torque at bends, and use the correct cutter for roots or compacted mass. Withdraw and clean the cable regularly to prevent re-compaction.
For pit-to-pit runs:
Work from the downstream pit first where possible. This improves debris removal and reduces the chance of compacting material into a junction.
Remove all loosened material from pits after clearing. Do not leave debris to wash back into the line at the next rain event.
Step 8: Reinspect and verify pipe condition
8️⃣ Post-clear CCTV inspection
Re-camera the full cleared section to verify the line is fully open and to identify any defects that caused the blockage. Look for:
Document the findings with footage and distance markings. This is especially important for insurance, strata, commercial maintenance reports, and quoting remedial works.
💡 If the line has a belly or poor grade, clearing may restore function temporarily but will not solve the root cause. Recommend rectification rather than repeated maintenance-only attendance.
Step 9: Flush test and confirm discharge
9️⃣ Operational testing
Conduct a final flush test from the highest upstream points and confirm free flow at each pit and the lawful point of discharge. Ensure there is no surcharge, ponding, or delayed draining.
Where the outlet is to kerb, inter-allotment drainage, easement, charged line, or on-site dispersion system, verify the outlet is free and not blocked by vegetation, sediment, or structural damage.
For roofwater systems, confirm downpipes are discharging correctly and there are no hidden overflows into wall cavities or under slabs.
Step 10: Repair defects where required
🔟 Permanent rectification
If pipe damage is identified, excavate only after service locating and repair the failed section using compliant materials. For most residential repairs, this will involve PVC stormwater pipe to AS/NZS 1254 in 90 mm or 100 mm, with correct couplings and bedding.
Reinstate pipe grade to achieve reliable self-cleansing flow. Ensure pits are set to correct levels, grate tops are finished flush with surrounding surfaces, and backfill is compacted appropriately to prevent settlement.
Where root intrusion is persistent, remove the entry defect rather than relying solely on repeated cutting or chemical treatment.
Step 11: Improve resilience against future blockages
1️⃣1️⃣ Preventive measures
Install or recommend:
In high-leaf-load environments, advise scheduled maintenance before autumn and before forecast storm seasons. Commercial sites and strata properties benefit from programmed CCTV and pit cleaning services.
💡 WELS ratings generally apply to fixtures and appliances rather than stormwater systems, but water-conscious testing methods should still be used on occupied sites to minimise wastage during flushing and diagnosis.
Step 12: Document the work and compliance
1️⃣2️⃣ Handover and reporting
Provide a clear service report including blockage cause, clearing method, CCTV findings, repaired sections, remaining risks, and maintenance recommendations. Include photos or footage where relevant.
If the stormwater system is non-compliant, damaged, or discharging incorrectly, advise the client in writing and quote remedial works. This is particularly important where altered site drainage affects neighbouring properties or building foundations.
🔒 Licencing: Plumbing and drainage work must be carried out by a licensed plumbing contractor in accordance with applicable state requirements, including NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission. Any associated gas work requires a separate gas fitter licence.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What is involved in unblock stormwater drains?
- Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Stormwater drain blockages are a common callout during heavy rain events, typically caused by silt, leaf litter, root intrusion, crushed pipework, o
- What skill level do I need for unblock stormwater drains?
- Advanced — Estimated time: 1–4 hours depending on blockage severity, access points, pipe depth, and whether excavation or pipe repair is required
- What are common mistakes when unblock stormwater drains?
- 1. Failing to confirm whether the issue is a true blockage or an undersized / poorly graded stormwater system. 2. Jetting a line without CCTV inspection, which can worsen damaged pipework or miss a collapse. 3. Leaving dislodged silt and debris in pits, allowing immediate re-blockage at the next rainfall event. 4. Assuming the nearest overflowing pit contains the obstruction when the actual fault
- What tools do I need for unblock stormwater drains?
- This guide includes a comprehensive tools list. Key plumbing tools are detailed in the Tools Required section.
- What is the Australian standard for stormwater drainage?
- The primary Australian standard for stormwater drainage is AS/NZS 3500.3:2021 Plumbing and drainage – Stormwater drainage. This standard outlines requirements for design, installation, and maintenance to ensure effective water management and prevent issues like blockages. Compliance is mandatory for licensed plumbers across all Australian states and territories.
- Why is a CCTV drain inspection camera essential for unblocking stormwater drains?
- A CCTV drain inspection camera is essential for accurately diagnosing the cause and location of a stormwater blockage without invasive excavation. It allows plumbers to identify issues such as root intrusion, pipe collapse, silt build-up, or foreign objects, guiding the most effective clearing method and preventing unnecessary damage. This aligns with best practice outlined by the Plumbing Code of Australia.
- What are common causes of stormwater drain blockages in Australia?
- Common causes of stormwater drain blockages in Australia include heavy silt and sediment accumulation from runoff, leaf litter and organic debris, tree root intrusion into pipe joints, and structural damage like crushed or collapsed pipes. During heavy rainfall events, these issues are exacerbated, leading to overflows and property damage.
Written by Pipey, the Plumbing specialist at VIC.Tools.