How to Plan a Bathroom Renovation
Complete planning guide for a bathroom renovation including layout, waterproofing, plumbing, and trade coordination.
- Skill level
- Advanced
- Time
- 2-4 weeks planning
- Trade
- Plumbing
- Updated
- 28 November 2026
Tools you will need
- Tape measure
- Graph paper
- Camera
- Spirit level
What is involved in planning a bathroom renovation in Australia?
Complete planning guide for a bathroom renovation including layout, waterproofing, plumbing, and trade coordination.
This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.
Skill Level: Advanced | Estimated Time: 2-4 weeks planningWhat essential preparations are needed before starting a bathroom renovation?
Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.
What tools are essential for an Australian bathroom renovation project?
Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.
How do you approach a bathroom renovation project step-by-step?
Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.
Step 1: Measure existing bathroom dimensions and draw to scale
This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.
Step 2: Photograph existing plumbing and electrical positions
With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.
Step 3: Decide what to keep and what to replace
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 4: Plan new layout considering plumbing point locations
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 5: Select fixtures: toilet, vanity, shower, bath, tapware
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 6: Choose tiles, waterproofing, and finishes
You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.
Step 7: Get quotes from waterproofer, plumber, electrician, tiler, painter
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 8: Create a trade schedule: demolition, plumbing rough-in, waterproofing, tiling, fit-off
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 9: Apply for council approval if structural changes are involved
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 10: Order all materials before trades begin
This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.
Safety Notes
Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.
Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.
Pro Tips from the Trade
These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.
Tip 1: Moving the toilet position is the most expensive plumbing change. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 2: Plan storage early: a recessed niche in the shower saves space. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 3: Order 10% extra tiles to account for cuts, breakage, and future repairs. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.Common Mistakes to Avoid
Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.
Mistake 1: Starting demolition before ordering materials causing delays. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 2: Not getting waterproofing inspected before tiling. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 3: Underestimating the budget by not accounting for all trades. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.Materials List
Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.
When to Call a Professional
While this guide covers a advanced-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:
Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.
Frequently asked questions
- What tools do I need for plan a bathroom renovation?
- You will need: Tape measure, Graph paper, Camera, Spirit level.
- How long does it take to plan a bathroom renovation?
- Expect approximately 2-4 weeks planning for this project.
- What safety precautions should I take?
- Check for asbestos in pre-1990 homes before demolition. All waterproofing must comply with AS 3740. All plumbing and electrical must be done by licensed trades. A building certifier inspection is required for waterproofing.
- What are the best tips for success?
- Moving the toilet position is the most expensive plumbing change. Plan storage early: a recessed niche in the shower saves space. Order 10% extra tiles to account for cuts, breakage, and future repairs.
- What mistakes should I avoid?
- Starting demolition before ordering materials causing delays. Not getting waterproofing inspected before tiling. Underestimating the budget by not accounting for all trades.
- What is the Australian standard for bathroom waterproofing?
- The Australian standard for bathroom waterproofing is AS 3740:2021 'Waterproofing of domestic wet areas'. This standard requires specific membrane types, fall to waste, and coverage areas to prevent moisture ingress. For tradies in New South Wales, additional requirements are outlined by NSW Fair Trading, including specific licence classes for waterproofing work. Always check the latest edition as standards are updated periodically.
Written by Pipey, the Plumbing specialist at VIC.Tools.