How to test insulation resistance with a megohmmeter
Learn how to test insulation resistance with a megohmmeter to AS/NZS 3000. Step-by-step guide covering test voltages, minimum values, and safe isolation.
Quick answer
To test insulation resistance with a megohmmeter, isolate the circuit and prove it dead. Disconnect voltage-sensitive equipment, then inject 500 V DC between active, neutral, and earth conductors. According to AS/NZS 3000:2018, the insulation resistance across low-voltage fixed wiring must measure at least 1 megohm to be deemed compliant.
- Skill level
- Intermediate
- Time
- 15 minutes to 2 hours, depending on circuit count, connected equipment and whether the task is verification or fault finding.
- Trade
- Electrical
- Updated
- 28 November 2026
Tools you will need
- Fluke 1507 - Digital Insulation Resistance Tester
- Megger MIT410/2 - CAT IV Insulation and Continuity Tester
- Kyoritsu 3005A - Digital Insulation Continuity Tester
- Fluke T6-1000 - Electrical Tester and Proving Unit
- Master Lock 491B - Grip Tight Circuit Breaker Lockout
- Wiha 283109 - VDE Insulated Screwdriver Set 1000V
⚡ How to Test Insulation Resistance with a Megohmmeter — Australian Trade Guide
What is insulation resistance testing and why is it crucial for Australian electricians?
Insulation resistance testing is a core verification and fault-finding procedure used to confirm the integrity of cable insulation, accessories and connected fixed wiring before energisation or during maintenance. In Australian practice, the test method must align with AS/NZS 3000, safe isolation requirements in AS/NZS 4836, and verification guidance in AS/NZS 3017.
Electrical work in Australia must be performed by a licensed electrician. This guide is for understanding the process and selecting the right tools and materials.
What skill level is required for insulation resistance testing in Australia?
Intermediate — Estimated time: 15 minutes to 2 hours, depending on circuit count, connected equipment and whether the task is verification or fault finding.
What essential tools are needed for insulation resistance testing in Australia?
What materials are essential for conducting insulation resistance tests safely?
Safety Requirements
Step-by-Step Guide
Step 1: 1️⃣ Review the circuit and define the test scope
Identify exactly what you are testing: a final subcircuit, a submain, a lighting circuit, a three-phase plant circuit or an entire installation section.
Check the board schedule, drawings and any previous test records. Confirm whether the job is:
This matters because the test setup changes depending on what remains connected and what must be removed from circuit.
For fault finding, note likely trouble points before you start:
Step 2: 2️⃣ Isolate, lock out and prove de-energised
Open the isolator, main switch or protective device supplying the circuit.
Apply lock-out/tag-out so the circuit cannot be re-energised while testing. Where there are multiple supply sources, isolate each source individually.
Prove your voltage tester on a proving unit, test the circuit for absence of voltage, then re-prove the tester. Confirm between:
This is non-negotiable. A megger is not a voltage detector and must never be used as one.
Step 3: 3️⃣ Prepare the circuit for insulation resistance testing
Disconnect or isolate all equipment that may be damaged by DC test voltage or that could distort readings.
Typical items to remove or isolate include:
For socket-outlet circuits, unplug all loads.
For lighting circuits, place all mechanical switches in the ON position so the fixed wiring is included in the test. If electronic control gear remains connected, isolate that gear first or test the cable section separately.
If testing an individual final subcircuit at the board, disconnect that circuit neutral from the neutral bar if required to eliminate parallel neutral paths. Label everything you remove.
Step 4: 4️⃣ Select the correct test voltage and verify the instrument
Use the insulation tester in accordance with the manufacturer’s instructions and the circuit type.
Common field settings are:
Before testing, inspect the leads, confirm battery condition and perform the instrument’s self-check or lead check if available.
Where practical, use crocodile clips rather than hand-held probe pressure. This gives more stable readings and safer hands-free testing.
Step 5: 5️⃣ Carry out the insulation resistance test
For a typical single-phase final subcircuit, the standard verification approach is to connect active and neutral together, then test active + neutral to earth.
This method checks the insulation of the live conductors to earth while reducing the chance of overlooking a defect on either conductor.
Typical single-phase sequence:
For three-phase circuits:
For detailed fault finding, you may also test:
This helps pinpoint whether the fault is on the active, neutral or between conductors.
Step 6: 6️⃣ Interpret the result correctly
For most LV installation verification work, a result of at least 1 MΩ is the usual minimum acceptance threshold referenced in Australian practice, but that is only the floor.
In trade reality:
Low readings can be caused by:
If the reading is low, sectionalise the circuit. Split the cable run, disconnect accessories and test each section independently until the faulted leg is identified.
Step 7: 7️⃣ Sectionalise and fault-find if the insulation resistance is low
When a circuit fails or gives a suspiciously low result, divide the circuit into manageable sections.
A practical fault-finding sequence is:
On lighting circuits, remove suspect fittings first, especially external fittings, bathroom exhaust/light units and wet-area luminaires.
On power circuits, suspect:
Where neutral-to-earth leakage is suspected, isolate the circuit neutral and retest. Shared or borrowed neutrals are a very common cause of confusing IR results on maintenance jobs.
Step 8: 8️⃣ Discharge, reconnect and restore the installation
Most modern insulation testers auto-discharge after the test, but never assume. Wait for the tester to indicate discharge complete, then confirm the circuit is safe to handle.
Remove temporary links.
Reconnect all neutrals, SPDs, control gear and accessories exactly as found. Tighten terminals to manufacturer requirements and visually check for any missed reconnections.
Before re-energising:
Step 9: 9️⃣ Record the test result properly
Good records are essential for commissioning, maintenance history and future fault comparison.
Record:
Trend data is especially valuable in maintenance environments where insulation slowly degrades over time rather than failing suddenly.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What is the minimum acceptable insulation resistance value in Australia?
- Under AS/NZS 3000:2018, the minimum acceptable insulation resistance for low-voltage wiring is 1 megohm (1 MΩ). Installations must reach at least 1 MΩ when tested at 500 V DC between active-to-earth and neutral-to-earth. Heating elements and certain equipment may permit lower values down to 0.01 MΩ under specific manufacturer exceptions.
- What test voltage should be selected on a megohmmeter?
- Standard low-voltage testing requires 500 V DC for circuits operating up to 500 V AC, in accordance with AS/NZS 3000:2018 and AS/NZS 3017. For circuits supplying sensitive electronics, surge protection devices, or dimmers, reduce the voltage to 250 V DC to prevent component breakdown, maintaining a minimum 1 MΩ pass threshold.
- Why is an insulation resistance test showing a false zero or low reading?
- False low readings typically occur because connected electronic loads, surge protection devices (SPDs), or neon indicators were not disconnected prior to testing. Connected appliances bridge conductors to earth. Incomplete isolation, damp terminal boxes, and shared neutral conductors backfeeding through adjacent circuits will also pull insulation values down toward zero.
- How do you test fixed wiring with an insulation tester?
- First, complete safe isolation and prove dead using a calibrated multimeter or proximity tester to AS/NZS 4836 standards. Disconnect sensitive electronic loads, close all circuit switches to include the full run, and apply 500 V DC between active-earth, neutral-earth, and active-neutral. A compliant reading must equal or exceed 1 MΩ.
- Do you need to test between active and neutral conductors?
- Testing between active and neutral is required during initial verification on new installations before equipment is connected. Once equipment or electronic switches are installed, testing active-to-neutral can destroy components; practitioners connect active and neutral together and test both conductors simultaneously to protective earth at 500 V DC as permitted by AS/NZS 3000.
- Can you perform insulation resistance testing on a live circuit?
- Never apply an insulation resistance test to an energised circuit. The megohmmeter injects high-voltage DC that will conflict with system line voltage, destroy the testing unit, and create a severe arc flash risk. Circuits must be safely isolated, locked out, tagged, and proved dead prior to connecting leads.
Written by Sparky, the Electrical specialist at VIC.Tools.