How to Plan an EV Charger Installation
Planning an EV charger installation in Australia requires assessing power needs, selecting the right charger, and verifying switchboard capacity. This guide covers essential steps for a safe and compliant home EV charging setup.
- Skill level
- Beginner
- Time
- 30 minutes planning
- Trade
- Electrical
- Updated
- 28 November 2026
Tools you will need
- Stanley FatMax 8m AutoLock - Tape Measure
- Ledlenser P7R Signature - Torch
- Fluke 117 True RMS - Multimeter
- Bosch GMS 120 Professional - Stud Finder
- Sola Big X 60cm - Spirit Level
- Kyoritsu 2007R - Clamp Meter (for load assessment)
- Greenlee 501 - Circuit Tracer
What is involved in planning an EV charger installation?
Guide to planning a home EV charger installation including power requirements, charger selection, and switchboard capacity.
This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.
Skill Level: Beginner | Estimated Time: 30 minutes planningWhat preparations are essential before starting an EV charger installation plan?
Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.
What tools are required for planning an EV charger installation?
Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.
How do you approach an EV charger installation plan step-by-step?
Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.
Step 1: Determine your EV charging needs: daily km, battery size
This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.
Step 2: Choose charger type: Level 2 (7kW single phase or 22kW three phase)
With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.
Step 3: Check switchboard capacity: most homes have 63A main switch
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 4: Calculate available capacity after existing loads
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 5: Choose mounting location near car parking position
You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.
Step 6: Measure cable run distance from switchboard to charger location
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 7: Consider solar integration if you have solar panels
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 8: Get quotes from licensed electricians who specialise in EV
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 9: Check local energy distributor requirements for notification
This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.
Safety Notes
Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.
Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.
Pro Tips from the Trade
These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.
Tip 1: A 7kW charger adds about 40km range per hour of charging. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 2: Smart chargers can schedule charging to off-peak electricity rates. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 3: If you have solar, schedule daytime charging to use free solar power. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.Common Mistakes to Avoid
Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.
Mistake 1: Not checking if switchboard can handle the additional load. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 2: Choosing a charger too powerful for your electrical supply. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 3: Not getting required approvals from energy distributor. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.Materials List
Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.
When to Call a Professional
While this guide covers a beginner-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:
Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.
Frequently asked questions
- What tools do I need for planning an EV charger installation?
- For planning an EV charger installation, essential tools include a tape measure for accurate distance assessment and a torch for detailed inspection of the existing switchboard. A multimeter is crucial for verifying voltage and circuit integrity, while a stud finder helps locate wall studs for mounting, and a spirit level ensures accurate placement.
- What safety precautions should I take for EV charger installation?
- EV charger installation MUST be performed by a licensed electrician in Australia, adhering strictly to AS/NZS 3000 'Wiring Rules'. Key safety precautions include verifying adequate switchboard capacity, installing a dedicated circuit, and ensuring a minimum Type A RCD (Residual Current Device) is used for fault protection to prevent electric shock and fire hazards.
- What is the Australian standard for EV charger installations?
- The primary Australian standard for EV charger installations is AS/NZS 3000:2018 'Wiring Rules', which outlines requirements for electrical installations. Additionally, AS/NZS 5139:2019 'Electrical installations – Safety of battery energy storage systems' may apply if battery storage is integrated. Always consult the latest editions and relevant state-specific electrical safety regulations.
- How do I determine the correct EV charger power for my home?
- Determining the correct EV charger power involves assessing your vehicle's charging capacity, daily driving needs, and existing electrical supply. A common residential choice is a 7kW (32A single-phase) charger, which adds approximately 40km of range per hour, but some homes may support up to 22kW (32A three-phase) if the switchboard capacity allows.
- What are the common mistakes to avoid when planning an EV charger installation?
- Common mistakes to avoid include not verifying the switchboard's capacity to handle the additional load, selecting a charger incompatible with your home's electrical supply, and failing to obtain necessary approvals from your energy distributor. Overlooking the need for a dedicated circuit and appropriate RCD protection can also lead to safety hazards and non-compliance.
- Can I install an EV charger myself in Australia?
- No, you cannot install an EV charger yourself in Australia; it is legally required that all EV charger installations be carried out by a licensed and qualified electrician. This ensures compliance with AS/NZS 3000 'Wiring Rules' and relevant state electrical safety regulations, safeguarding against electrical hazards and ensuring the system operates safely and efficiently.
Written by Sparky, the Electrical specialist at VIC.Tools.