How to Prepare for a Blackout
Prepare for a blackout safely with emergency lighting, backup power, generator precautions and appliance protection for Australian homes and worksites.
Quick answer
Prepare for a blackout by keeping tested torches, a battery radio, charged power banks, first-aid supplies, water and essential medicines together in an accessible kit. Unplug sensitive equipment when safe, keep clear of fallen lines, and run generators outdoors only; fixed generator connections require a licensed electrician and compliant changeover equipment.
- Skill level
- Beginner
- Time
- 30 minutes preparation
- Trade
- Electrical
- Updated
- 28 November 2026
Tools you will need
- Ledlenser P7R Core - Rechargeable LED torch
- Petzl ACTIK CORE - Rechargeable headlamp
- Panasonic RF-2400D - Battery-powered AM/FM radio
- Cygnett ChargeUp Boost 3 20K - Portable power bank
- APC Back-UPS BX950MI-AZ - 950 VA line-interactive UPS
- EcoFlow RIVER 2 Max - Portable power station
- Honda EU22i - 2.2 kVA inverter generator for outdoor use only
Why is blackout preparedness essential for Australian tradies?
Essential preparations and safety procedures for power outages including emergency lighting, generator safety, and protecting sensitive equipment.
This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.
Skill Level: Beginner | Estimated Time: 30 minutes preparationWhat preparatory steps should you take before a power outage?
Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.
What essential tools are needed for blackout readiness?
Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.
How do you implement a blackout preparedness plan?
Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.
Step 1: Create a blackout kit: torch, radio, phone charger, candles, matches
This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.
Step 2: Know your switchboard location and how to operate the main switch
With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.
Step 3: Program energy distributor fault number into your phone
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 4: Unplug sensitive electronics to protect from surge when power returns
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 5: Leave one light switched on so you know when power is restored
You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.
Step 6: Keep fridge and freezer doors closed (food stays safe 4-24 hours)
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 7: If using a generator: NEVER run indoors or in an enclosed space
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 8: Check on neighbours, especially elderly or vulnerable people
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 9: Report the outage to your energy distributor
This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.
Safety Notes
Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.
Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.
Pro Tips from the Trade
These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.
Tip 1: A UPS keeps your internet modem running for 2-4 hours during blackouts. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 2: Portable power stations (like Jackery) can power essential devices. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 3: Solar battery systems provide automatic blackout protection. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.Common Mistakes to Avoid
Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.
Mistake 1: Running a generator in the garage with the door down (CO poisoning risk). This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 2: Opening the fridge frequently during a blackout spoiling food faster. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 3: Not having a torch accessible when the power goes out. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.Materials List
Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.
When to Call a Professional
While this guide covers a beginner-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:
Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.
Frequently asked questions
- What should I put in a blackout emergency kit?
- Prepare a blackout kit with two LED torches, spare batteries, a headlamp, battery radio, charged power bank, first-aid kit and drinking water. Keep it in an accessible, known location rather than beside the switchboard. Add essential medicines, printed emergency contacts and charging leads used by your crew or household.
- How long does it take to prepare for a blackout?
- Allow about 30 minutes to assemble and check a basic blackout kit, but arrange electrical backup work well before an outage. Test torches, radios, power banks and UPS batteries every three months. A licensed electrician must install any generator inlet, changeover switch, battery system or alterations to fixed wiring.
- What safety precautions should I take during a blackout?
- Treat fallen cables as live, keep at least eight metres away, report immediate danger to 000 and notify the local electricity distributor. Use generators outdoors, well clear of doors, windows and vents; never in a garage. Never backfeed through a power point, and do not use barbecues or outdoor heaters indoors.
- What Australian standards apply when connecting a generator to a house?
- A generator may supply fixed premises wiring only through compliant equipment installed by a licensed electrician, including mechanical or electrical interlocking that prevents grid backfeed. AS/NZS 3000:2018 and AS/NZS 3010:2017 cover wiring and generating-set installations. The electrician must also meet state, territory and electricity distributor service rules.
- How do I protect appliances and food during a power outage?
- Keep refrigerator and freezer doors closed, and unplug sensitive electronics if the supply is unstable or storms are nearby. An unopened refrigerator stays cold for about four hours; a full freezer for about 48 hours, or 24 hours when half-full. Discard unsafe food according to your state health authority’s advice.
- What size UPS do I need for a modem or computer during a blackout?
- Use a line-interactive UPS for a modem, router, computer or other low-power equipment that needs an orderly shutdown. Select capacity from the equipment’s wattage and required runtime, not VA alone, and avoid plugging heaters or fridges into it. Replace UPS batteries at the manufacturer’s interval and test them regularly.
Written by Sparky, the Electrical specialist at VIC.Tools.