How to Wire a Shed or Garage
Plan the electrical supply to a detached shed or garage including sub-main cable, sub-board, and circuits.
- Skill level
- Advanced
- Time
- 1-2 days
- Trade
- Electrical
- Updated
- 28 November 2026
Tools you will need
- Multimeter
- Cable locator
- Trench spade
- Drill driver
- Cable clips
What is involved in wiring a detached shed or garage?
Plan the electrical supply to a detached shed or garage including sub-main cable, sub-board, and circuits.
This guide walks you through every stage of the process, from preparation and tool selection right through to finishing. Whether you are tackling this project for the first time or looking to refine your technique, the steps below will help you achieve a professional result.
Skill Level: Advanced | Estimated Time: 1-2 daysHow should I prepare before wiring a shed or garage?
Before picking up any tools, take a few minutes to prepare properly. Good preparation is the difference between a smooth project and a frustrating one.
What tools are required to wire a shed or garage?
Having the right tools makes every step faster, safer, and more accurate. Below is the complete tool list for this project. If you do not own a particular tool, consider whether hiring or purchasing makes more sense for your situation -- tools over $300 may be eligible for the EOFY instant asset write-off if used for income-producing purposes.
Step-by-Step Guide
Follow these steps in order. Each step builds on the previous one, so resist the temptation to skip ahead. Take your time with the early stages -- accurate preparation saves hours of correction later.
Step 1: Calculate total load: lights, power, compressor, welder, etc.
This is your foundation step. Getting this right sets the standard for everything that follows. Double-check all measurements and marks before committing to any cuts or fixings. If something does not look right at this stage, it is far easier to adjust now than after you have progressed further.
Step 2: Determine sub-main cable size based on load and distance
With your initial preparation complete, this step moves you into the main construction phase. Ensure all your materials are within reach and your work area is clear of obstructions. Maintain consistent technique throughout to achieve uniform results.
Step 3: Install a sub-board with RCD protection in the shed
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 4: Trench underground cable route minimum 500mm deep
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 5: Lay TPS in conduit or use armoured cable underground
You are at the midpoint of the project. This is a good time to pause, check your progress against the plan, and verify everything is level, plumb, and square. Correcting small errors now prevents them from compounding through the remaining steps.
Step 6: Install earth stake at shed and connect to sub-board earth bar
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 7: Run individual circuits: lighting (1.5mm), power (2.5mm), heavy-duty (4-6mm)
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 8: Install power points, lights, and switches
Work methodically through this step, checking your progress as you go. Accuracy at each stage ensures the final result meets a professional standard. If you are unsure about any aspect, refer back to the measurements and specifications noted earlier.
Step 9: Have licensed electrician connect to main switchboard and test
This final step brings the project together. Take your time here and focus on the finish quality. Step back and inspect your work from different angles. Small adjustments at this stage make a significant difference to the overall appearance and performance of the finished result.
Safety Notes
Safety is not optional. Australian workplace health and safety regulations apply to all construction work, including domestic projects. The notes below highlight specific hazards for this project.
Always have a first aid kit accessible at your work site. If you are working alone, let someone know where you are and what you are doing.
Pro Tips from the Trade
These tips come from years of hands-on experience. They represent the kind of knowledge that separates a good job from a great one.
Tip 1: Plan for future needs: run larger cable now even if current load is small. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 2: Include a dedicated 15A or 20A circuit for compressor or welder. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time. Tip 3: Use LED high bay lights for workshop areas. This may seem like a small detail, but experienced tradespeople consistently use this technique to deliver a better result in less time.Common Mistakes to Avoid
Learning from other people's mistakes saves you time, money, and frustration. These are the most common errors seen in this type of project.
Mistake 1: Under-sizing the sub-main cable causing voltage drop. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 2: Not providing separate earthing for the detached structure. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time. Mistake 3: Running cable through garden where it could be hit by a spade. This is one of the most frequent problems encountered. It can result in wasted materials, poor structural integrity, or the need to redo significant portions of the work. Take the time to get it right the first time.Materials List
Below is the complete materials list. Quantities will vary based on your specific project dimensions. Always purchase 10-15% extra to account for cuts, waste, and any errors during construction. Check availability at your local supplier before starting the project.
When to Call a Professional
While this guide covers a advanced-level project that many competent DIYers can tackle, there are situations where professional help is the smarter choice:
Hiring a licensed professional for critical aspects of the work is not a sign of failure -- it is a sign of good judgement. The cost of getting it right the first time is always less than the cost of fixing it later.
Frequently asked questions
- What tools do I need for wire a shed or garage?
- You will need: Multimeter, Cable locator, Trench spade, Drill driver, Cable clips.
- How long does it take to wire a shed or garage?
- Expect approximately 1-2 days for this project.
- What safety precautions should I take?
- ALL work must be done by a licensed electrician. Underground cable must be in conduit with warning tape above. Separate earth stake required for detached structures. RCD protection mandatory on all circuits.
- What are the best tips for success?
- Plan for future needs: run larger cable now even if current load is small. Include a dedicated 15A or 20A circuit for compressor or welder. Use LED high bay lights for workshop areas.
- What mistakes should I avoid?
- Under-sizing the sub-main cable causing voltage drop. Not providing separate earthing for the detached structure. Running cable through garden where it could be hit by a spade.
- What is the Australian standard for electrical installations in detached structures?
- The Australian standard for electrical installations, including those in detached sheds and garages, is AS/NZS 3000:2018, known as the Wiring Rules. This standard mandates specific requirements for cable protection, earthing, and RCDs to ensure safety and compliance across all Australian states and territories.
- Is RCD protection mandatory for shed wiring in Australia?
- Yes, RCD protection is mandatory on all circuits supplying power to detached structures like sheds and garages in Australia. According to AS/NZS 3000:2018, every final subcircuit must be protected by an RCD with a maximum tripping current of 30mA, ensuring enhanced safety against electric shock.
- Can I install electrical wiring in my own shed in Australia?
- No, in Australia, all electrical wiring work, including that in sheds and garages, must be performed by a licensed electrician. This is a legal requirement under state and territory electrical safety regulations, such as the Electrical Safety Act 2002 (QLD), to ensure compliance with AS/NZS 3000:2018 and public safety.
Written by Sparky, the Electrical specialist at VIC.Tools.